606 (& 620) 106th Ave NE, Bellevue, WA

An independent guide to the Onni 606 development.

For the wider city, visit bellevue.wiki ↗

Project

  • Overview
  • Live cam
  • Latest progress
  • Construction log
  • News
  • Permit ledger
  • Construction impacts
  • The Towers
  • Skyline & height
  • Timeline
  • Gallery

Context

  • History of the block
  • Location
  • Developer

Help

  • Search the site
  • FAQ
  • Glossary
  • Sources & press
  • Contact
  • Updates feed
  • Sitemap

This is an independent, informational fan site. It is not affiliated with, sponsored by, or endorsed by Onni Group. Figures are compiled from public reporting and are approximate and subject to change. Project names and trademarks belong to their respective owners.

© 2026 onni606.com — built by an enthusiast.

  1. Home
  2. /Construction log
  3. /Thursday, August 20, 2026

Construction log

Thursday, August 20, 2026

68 snapshots from the live camera.


AI digest

The site was largely quiet, with machinery holding position through most of the day; a few small machines shifted, and several trucks or vehicles appeared along the driveway and right-side service road. The ground and overall site layout show no substantial change.

▶ Play this day as a timelapse
  1. Construction camera frame at 11:00 PM PT. No construction activity — the site is quiet.
    11:00 PM PT

    No construction activity — the site is quiet.

  2. 2 similar no-change frames9:00 PM–10:00 PM PT

    No visible change was reported between sampled frames; continuous inactivity cannot be inferred.

    1. Construction camera frame at 10:00 PM PT. No construction activity — the site is quiet.
      10:00 PM PT

      No construction activity — the site is quiet.

    2. Construction camera frame at 9:00 PM PT. No construction activity — the site is quiet.
      9:00 PM PT

      No construction activity — the site is quiet.

  3. Construction camera frame at 8:30 PM PT. Visibility is low, and the site appears quiet with minimal discernible activity in these frames.
    8:30 PM PT

    Visibility is low, and the site appears quiet with minimal discernible activity in these frames.

  4. Construction camera frame at 8:15 PM PT. Equipment arrangements across the site appear consistent, with no obvious repositioning of machinery or materials in the last fifteen minutes.
    8:15 PM PT

    Equipment arrangements across the site appear consistent, with no obvious repositioning of machinery or materials in the last fifteen minutes.

  5. Construction camera frame at 8:00 PM PT. The scene remains largely unchanged, with no noticeable movement of equipment or materials during this interval.
    8:00 PM PT

    The scene remains largely unchanged, with no noticeable movement of equipment or materials during this interval.

  6. Construction camera frame at 7:45 PM PT. The overall layout of equipment on the site holds steady, though a small piece of machinery near the center appears to have rotated slightly.
    7:45 PM PT

    The overall layout of equipment on the site holds steady, though a small piece of machinery near the center appears to have rotated slightly.

  7. Construction camera frame at 7:30 PM PT. The site’s appearance is largely static, with the positioning of equipment and materials appearing consistent between these views.
    7:30 PM PT

    The site’s appearance is largely static, with the positioning of equipment and materials appearing consistent between these views.

  8. Construction camera frame at 7:15 PM PT. A small yellow machine has moved slightly toward the center of the site from the lower right corner. Otherwise, the equipment and materials maintain their positions between these views.
    7:15 PM PT

    A small yellow machine has moved slightly toward the center of the site from the lower right corner. Otherwise, the equipment and materials maintain their positions between these views.

  9. 2 similar no-change frames6:45 PM–7:00 PM PT

    No visible change was reported between sampled frames; continuous inactivity cannot be inferred.

    1. Construction camera frame at 7:00 PM PT. The site presents a remarkably similar picture compared to the last check-in, with no apparent shifts in equipment or material locations.
      7:00 PM PT

      The site presents a remarkably similar picture compared to the last check-in, with no apparent shifts in equipment or material locations.

    2. Construction camera frame at 6:45 PM PT. The scene shows little alteration from the last view, with all visible machinery remaining in the same locations.
      6:45 PM PT

      The scene shows little alteration from the last view, with all visible machinery remaining in the same locations.

  10. Construction camera frame at 6:30 PM PT. The arrangement of machinery across the site remains consistent between these views.
    6:30 PM PT

    The arrangement of machinery across the site remains consistent between these views.

  11. 2 similar no-change frames6:00 PM–6:15 PM PT

    No visible change was reported between sampled frames; continuous inactivity cannot be inferred.

    1. Construction camera frame at 6:15 PM PT. The scene appears virtually unchanged, with all equipment and materials maintaining their previous positions.
      6:15 PM PT

      The scene appears virtually unchanged, with all equipment and materials maintaining their previous positions.

    2. Construction camera frame at 6:00 PM PT. The scene is holding steady, with no noticeable changes to the arrangement of equipment or materials on the site.
      6:00 PM PT

      The scene is holding steady, with no noticeable changes to the arrangement of equipment or materials on the site.

  12. Construction camera frame at 5:45 PM PT. The site remains consistent between views, with equipment and materials appearing in the same arrangement.
    5:45 PM PT

    The site remains consistent between views, with equipment and materials appearing in the same arrangement.

  13. Construction camera frame at 5:30 PM PT. The overall scene is stable, with the machines and materials holding their positions from the last view.
    5:30 PM PT

    The overall scene is stable, with the machines and materials holding their positions from the last view.

  14. Construction camera frame at 5:15 PM PT. The site presents a remarkably similar picture to the previous view, with no apparent movement of equipment or vehicles.
    5:15 PM PT

    The site presents a remarkably similar picture to the previous view, with no apparent movement of equipment or vehicles.

  15. Construction camera frame at 5:00 PM PT. The scene shows no evident shifts in the arrangement of equipment or ongoing processes during these fifteen minutes.
    5:00 PM PT

    The scene shows no evident shifts in the arrangement of equipment or ongoing processes during these fifteen minutes.

  16. Construction camera frame at 4:45 PM PT. The site’s layout is unchanged, with machinery remaining in the same locations as observed previously.
    4:45 PM PT

    The site’s layout is unchanged, with machinery remaining in the same locations as observed previously.

  17. Construction camera frame at 4:30 PM PT. The site appears largely as it was, with the machines maintaining their positions across the graded area.
    4:30 PM PT

    The site appears largely as it was, with the machines maintaining their positions across the graded area.

  18. 2 similar no-change frames4:00 PM–4:15 PM PT

    No visible change was reported between sampled frames; continuous inactivity cannot be inferred.

    1. Construction camera frame at 4:15 PM PT. The site maintains a static appearance, with no discernible alterations in the positioning of equipment or activity levels.
      4:15 PM PT

      The site maintains a static appearance, with no discernible alterations in the positioning of equipment or activity levels.

    2. Construction camera frame at 4:00 PM PT. The view remains consistent, showing no noticeable changes in the location of machinery or any new activity across the site.
      4:00 PM PT

      The view remains consistent, showing no noticeable changes in the location of machinery or any new activity across the site.

  19. Construction camera frame at 3:45 PM PT. Equipment remains in largely the same positions, and the scene shows no clear movement or new arrivals during this interval.
    3:45 PM PT

    Equipment remains in largely the same positions, and the scene shows no clear movement or new arrivals during this interval.

  20. Construction camera frame at 3:30 PM PT. The scene presents a still image, with no apparent alterations in equipment placement or ongoing work during this period.
    3:30 PM PT

    The scene presents a still image, with no apparent alterations in equipment placement or ongoing work during this period.

  21. Construction camera frame at 3:15 PM PT. The arrangement of equipment on site appears to have held steady, with no obvious shifts in position during this interval.
    3:15 PM PT

    The arrangement of equipment on site appears to have held steady, with no obvious shifts in position during this interval.

  22. Construction camera frame at 3:00 PM PT. The scene appears remarkably unchanged, with the machinery spread across the site holding its positions.
    3:00 PM PT

    The scene appears remarkably unchanged, with the machinery spread across the site holding its positions.

  23. Construction camera frame at 2:45 PM PT. The equipment groupings appear largely as they were, offering little evidence of repositioning or new activity in this view.
    2:45 PM PT

    The equipment groupings appear largely as they were, offering little evidence of repositioning or new activity in this view.

  24. Construction camera frame at 2:30 PM PT. The site maintains a consistent appearance, with no discernible shifts in equipment locations or activity.
    2:30 PM PT

    The site maintains a consistent appearance, with no discernible shifts in equipment locations or activity.

  25. Construction camera frame at 2:15 PM PT. The scene remains quite stable, with the positions of equipment and materials appearing consistent between these views.
    2:15 PM PT

    The scene remains quite stable, with the positions of equipment and materials appearing consistent between these views.

  26. 2 similar no-change frames1:45 PM–2:00 PM PT

    No visible change was reported between sampled frames; continuous inactivity cannot be inferred.

    1. Construction camera frame at 2:00 PM PT. The site’s equipment arrangement remains consistent, with no noticeable movement of machinery or materials between these views.
      2:00 PM PT

      The site’s equipment arrangement remains consistent, with no noticeable movement of machinery or materials between these views.

    2. Construction camera frame at 1:45 PM PT. The scene presents a largely static view, with equipment maintaining its positions across the graded area.
      1:45 PM PT

      The scene presents a largely static view, with equipment maintaining its positions across the graded area.

  27. Construction camera frame at 1:30 PM PT. The appearance of the site is quite similar across these two views, with the arrangement of machinery remaining consistent.
    1:30 PM PT

    The appearance of the site is quite similar across these two views, with the arrangement of machinery remaining consistent.

  28. Construction camera frame at 1:15 PM PT. A red and yellow truck has entered the site via the driveway on the left, and is now positioned near the equipment in that section. Otherwise, the overall scene appears largely unchanged, with the arrangement of machines remaining consistent.
    1:15 PM PT

    A red and yellow truck has entered the site via the driveway on the left, and is now positioned near the equipment in that section. Otherwise, the overall scene appears largely unchanged, with the arrangement of machines remaining consistent.

  29. Construction camera frame at 1:00 PM PT. A small, orange machine has moved from the right side of the graded area to near the driveway on the left. Otherwise, the scene remains remarkably stable, with equipment holding its positions.
    1:00 PM PT

    A small, orange machine has moved from the right side of the graded area to near the driveway on the left. Otherwise, the scene remains remarkably stable, with equipment holding its positions.

  30. Construction camera frame at 12:45 PM PT. The graded area appears consistent between these views, with no readily apparent shifts in equipment or material placement.
    12:45 PM PT

    The graded area appears consistent between these views, with no readily apparent shifts in equipment or material placement.

  31. Construction camera frame at 12:30 PM PT. The layout of equipment across the site holds steady, with only subtle shifts in shadow positions visible.
    12:30 PM PT

    The layout of equipment across the site holds steady, with only subtle shifts in shadow positions visible.

  32. Construction camera frame at 12:15 PM PT. Equipment positions appear consistent between frames, though sunlight continues to shift across the graded area.
    12:15 PM PT

    Equipment positions appear consistent between frames, though sunlight continues to shift across the graded area.

  33. Construction camera frame at 12:00 PM PT. The scene presents a largely unchanged view, with equipment remaining in the same general locations.
    12:00 PM PT

    The scene presents a largely unchanged view, with equipment remaining in the same general locations.

  34. Construction camera frame at 11:45 AM PT. The arrangement of machinery across the site stays largely the same, though shadows have shifted with the sun.
    11:45 AM PT

    The arrangement of machinery across the site stays largely the same, though shadows have shifted with the sun.

  35. Construction camera frame at 11:30 AM PT. A yellow excavator has shifted its position slightly toward the center of the site, leaving a visible track in the graded surface.
    11:30 AM PT

    A yellow excavator has shifted its position slightly toward the center of the site, leaving a visible track in the graded surface.

  36. Construction camera frame at 11:15 AM PT. The site appears much as it did moments ago, with no noticeable alterations to the positioning of machines or stockpiled materials.
    11:15 AM PT

    The site appears much as it did moments ago, with no noticeable alterations to the positioning of machines or stockpiled materials.

  37. Construction camera frame at 11:00 AM PT. The view remains remarkably static, with equipment holding its positions and no new arrivals or departures apparent.
    11:00 AM PT

    The view remains remarkably static, with equipment holding its positions and no new arrivals or departures apparent.

  38. Construction camera frame at 10:45 AM PT. The site maintains a consistent state, with no obvious changes in the location of equipment or materials.
    10:45 AM PT

    The site maintains a consistent state, with no obvious changes in the location of equipment or materials.

  39. 2 similar no-change frames10:15 AM–10:30 AM PT

    No visible change was reported between sampled frames; continuous inactivity cannot be inferred.

    1. Construction camera frame at 10:30 AM PT. The layout of equipment and materials remains consistent between these views, with no discernible shifts in position.
      10:30 AM PT

      The layout of equipment and materials remains consistent between these views, with no discernible shifts in position.

    2. Construction camera frame at 10:15 AM PT. The overall picture is unchanged, with the same arrangement of equipment and materials visible across the site.
      10:15 AM PT

      The overall picture is unchanged, with the same arrangement of equipment and materials visible across the site.

  40. Construction camera frame at 10:00 AM PT. The equipment arrangement remains largely the same, though a second red and white truck is now positioned behind the first one along the service road on the right.
    10:00 AM PT

    The equipment arrangement remains largely the same, though a second red and white truck is now positioned behind the first one along the service road on the right.

  41. Construction camera frame at 9:45 AM PT. The scene presents a similar appearance to the prior view, with no significant repositioning of machinery or materials visible.
    9:45 AM PT

    The scene presents a similar appearance to the prior view, with no significant repositioning of machinery or materials visible.

  42. Construction camera frame at 9:30 AM PT. The equipment distribution across the site appears stable, with no noticeable repositioning of machinery or materials in the last fifteen minutes.
    9:30 AM PT

    The equipment distribution across the site appears stable, with no noticeable repositioning of machinery or materials in the last fifteen minutes.

  43. Construction camera frame at 9:15 AM PT. The scene is holding steady, with no apparent shifts in the placement of equipment or materials across the site.
    9:15 AM PT

    The scene is holding steady, with no apparent shifts in the placement of equipment or materials across the site.

  44. Construction camera frame at 9:00 AM PT. A red and white truck is now visible along the service road on the right side of the frame, having arrived since the previous view. Otherwise, the equipment and layout across the site remain as they were.
    9:00 AM PT

    A red and white truck is now visible along the service road on the right side of the frame, having arrived since the previous view. Otherwise, the equipment and layout across the site remain as they were.

  45. Construction camera frame at 8:45 AM PT. The arrangement of equipment across the site remains remarkably consistent between these two views.
    8:45 AM PT

    The arrangement of equipment across the site remains remarkably consistent between these two views.

  46. Construction camera frame at 8:30 AM PT. The site’s arrangement of machinery and materials appears largely unchanged between these views.
    8:30 AM PT

    The site’s arrangement of machinery and materials appears largely unchanged between these views.

  47. Construction camera frame at 8:15 AM PT. A small white vehicle has moved from near the center of the site towards the service road on the right. Otherwise, the scene remains consistent with the previous view.
    8:15 AM PT

    A small white vehicle has moved from near the center of the site towards the service road on the right. Otherwise, the scene remains consistent with the previous view.

  48. 6 similar no-change frames6:45 AM–8:00 AM PT

    No visible change was reported between sampled frames; continuous inactivity cannot be inferred.

    1. Construction camera frame at 8:00 AM PT. The site presents a largely unchanging picture, with equipment remaining in the same locations as the previous view.
      8:00 AM PT

      The site presents a largely unchanging picture, with equipment remaining in the same locations as the previous view.

    2. Construction camera frame at 7:45 AM PT. The broad site appears static, with no noticeable repositioning of equipment or materials in either view.
      7:45 AM PT

      The broad site appears static, with no noticeable repositioning of equipment or materials in either view.

    3. Construction camera frame at 7:30 AM PT. The machines on site maintain their positions, with no apparent movement detected between these frames.
      7:30 AM PT

      The machines on site maintain their positions, with no apparent movement detected between these frames.

    4. Construction camera frame at 7:15 AM PT. The view across the site shows no discernible alterations in the positions of the machines or materials.
      7:15 AM PT

      The view across the site shows no discernible alterations in the positions of the machines or materials.

    5. Construction camera frame at 7:00 AM PT. The scene remains remarkably still, with no visible shifts in the placement of equipment or vehicles.
      7:00 AM PT

      The scene remains remarkably still, with no visible shifts in the placement of equipment or vehicles.

    6. Construction camera frame at 6:45 AM PT. The arrangement of the machinery across the site appears unchanged in these two views.
      6:45 AM PT

      The arrangement of the machinery across the site appears unchanged in these two views.

  49. Construction camera frame at 6:30 AM PT. A dark-colored box truck has entered the site from the driveway on the left side of the frame. Otherwise, the arrangement of equipment across the site remains consistent between these views.
    6:30 AM PT

    A dark-colored box truck has entered the site from the driveway on the left side of the frame. Otherwise, the arrangement of equipment across the site remains consistent between these views.

  50. Construction camera frame at 6:15 AM PT. The site appears much the same as it did a few minutes ago, with all the machines remaining in their previous positions.
    6:15 AM PT

    The site appears much the same as it did a few minutes ago, with all the machines remaining in their previous positions.

  51. 7 similar no-change frames12:00 AM–6:00 AM PT

    No visible change was reported between sampled frames; continuous inactivity cannot be inferred.

    1. Construction camera frame at 6:00 AM PT. Daylight reveals multiple machines positioned across the graded site, where it was dark moments ago. The scene remains largely static, with equipment in the same locations as the previous view.
      6:00 AM PT

      Daylight reveals multiple machines positioned across the graded site, where it was dark moments ago. The scene remains largely static, with equipment in the same locations as the previous view.

    2. Construction camera frame at 5:00 AM PT. No construction activity — the site is quiet.
      5:00 AM PT

      No construction activity — the site is quiet.

    3. Construction camera frame at 4:00 AM PT. No construction activity — the site is quiet.
      4:00 AM PT

      No construction activity — the site is quiet.

    4. Construction camera frame at 3:00 AM PT. No construction activity — the site is quiet.
      3:00 AM PT

      No construction activity — the site is quiet.

    5. Construction camera frame at 2:00 AM PT. No construction activity — the site is quiet.
      2:00 AM PT

      No construction activity — the site is quiet.

    6. Construction camera frame at 1:00 AM PT. No construction activity — the site is quiet.
      1:00 AM PT

      No construction activity — the site is quiet.

    7. Construction camera frame at 12:00 AM PT. No construction activity — the site is quiet.
      12:00 AM PT

      No construction activity — the site is quiet.