Skip to content
606Onni 606 · Bellevue
  • Live
  • Progress
  • Project
  • History
  • Search
606

606 (& 620) 106th Ave NE, Bellevue, WA

An independent guide to the Onni 606 development.

For the wider city, visit bellevue.wiki ↗

Project

  • Overview
  • Live cam
  • Latest progress
  • Construction log
  • News
  • Permit ledger
  • Construction impacts
  • The Towers
  • Skyline & height
  • Timeline
  • Gallery

Context

  • History of the block
  • Location
  • Developer

Help

  • Search the site
  • FAQ
  • Glossary
  • Sources & press
  • Contact
  • Updates feed
  • Sitemap

This is an independent, informational fan site. It is not affiliated with, sponsored by, or endorsed by Onni Group. Figures are compiled from public reporting and are approximate and subject to change. Project names and trademarks belong to their respective owners.

© 2026 onni606.com — built by an enthusiast.

  1. Home
  2. /Construction log
  3. /Sunday, August 23, 2026

Construction log

Sunday, August 23, 2026

67 snapshots from the live camera.


AI digest

The site was largely quiet, with machinery holding position; a small red-and-white vehicle moved farther into the block during the day. Compared with the week-earlier frame, the broad graded areas and central cut look much the same, with no substantial ground change visible.

▶ Play this day as a timelapse
  1. Construction camera frame at 11:00 PM PT. No construction activity — the site is quiet.
    11:00 PM PT

    No construction activity — the site is quiet.

  2. 3 similar no-change frames8:15 PM–10:00 PM PT

    No visible change was reported between sampled frames; continuous inactivity cannot be inferred.

    1. Construction camera frame at 10:00 PM PT. No construction activity — the site is quiet.
      10:00 PM PT

      No construction activity — the site is quiet.

    2. Construction camera frame at 9:00 PM PT. No construction activity — the site is quiet.
      9:00 PM PT

      No construction activity — the site is quiet.

    3. Construction camera frame at 8:15 PM PT. Everything on site remains in the same positions as the previous view.
      8:15 PM PT

      Everything on site remains in the same positions as the previous view.

  3. Construction camera frame at 8:00 PM PT. The equipment layout is stable, though a red container now appears near the center of the site.
    8:00 PM PT

    The equipment layout is stable, though a red container now appears near the center of the site.

  4. 4 similar no-change frames7:00 PM–7:45 PM PT

    No visible change was reported between sampled frames; continuous inactivity cannot be inferred.

    1. Construction camera frame at 7:45 PM PT. No visible changes mark the passage of time between these two views of the site.
      7:45 PM PT

      No visible changes mark the passage of time between these two views of the site.

    2. Construction camera frame at 7:30 PM PT. The site’s configuration appears to be holding, with no discernible shifts in the location of the heavy equipment.
      7:30 PM PT

      The site’s configuration appears to be holding, with no discernible shifts in the location of the heavy equipment.

    3. Construction camera frame at 7:15 PM PT. The scene is holding steady, with no apparent movement of equipment or materials across the site.
      7:15 PM PT

      The scene is holding steady, with no apparent movement of equipment or materials across the site.

    4. Construction camera frame at 7:00 PM PT. The site appears unchanged, with all visible machinery and materials holding their positions.
      7:00 PM PT

      The site appears unchanged, with all visible machinery and materials holding their positions.

  5. Construction camera frame at 6:45 PM PT. The arrangement of equipment across the site remains consistent between these views.
    6:45 PM PT

    The arrangement of equipment across the site remains consistent between these views.

  6. Construction camera frame at 6:30 PM PT. The site remains as it was, with no shifts in the positions of machinery or materials apparent.
    6:30 PM PT

    The site remains as it was, with no shifts in the positions of machinery or materials apparent.

  7. Construction camera frame at 6:15 PM PT. Everything visible on site maintains its position from the previous frame.
    6:15 PM PT

    Everything visible on site maintains its position from the previous frame.

  8. Construction camera frame at 6:00 PM PT. The scene presents a stable view, with no noticeable changes in equipment placement or site conditions.
    6:00 PM PT

    The scene presents a stable view, with no noticeable changes in equipment placement or site conditions.

  9. Construction camera frame at 5:45 PM PT. The site's layout is holding firm, with all visible equipment and materials appearing in the same spots as before.
    5:45 PM PT

    The site's layout is holding firm, with all visible equipment and materials appearing in the same spots as before.

  10. 3 similar no-change frames5:00 PM–5:30 PM PT

    No visible change was reported between sampled frames; continuous inactivity cannot be inferred.

    1. Construction camera frame at 5:30 PM PT. The site's appearance is consistent between these frames, showing no movement of equipment or vehicles.
      5:30 PM PT

      The site's appearance is consistent between these frames, showing no movement of equipment or vehicles.

    2. Construction camera frame at 5:15 PM PT. The site appears unchanged in this interval, with all visible equipment remaining in the same positions.
      5:15 PM PT

      The site appears unchanged in this interval, with all visible equipment remaining in the same positions.

    3. Construction camera frame at 5:00 PM PT. The site shows no discernible alterations in this interval, with all visible machines and materials remaining stationary.
      5:00 PM PT

      The site shows no discernible alterations in this interval, with all visible machines and materials remaining stationary.

  11. Construction camera frame at 4:45 PM PT. The overall scene remains remarkably steady, with no apparent repositioning of any equipment within the view.
    4:45 PM PT

    The overall scene remains remarkably steady, with no apparent repositioning of any equipment within the view.

  12. Construction camera frame at 4:30 PM PT. The site maintains a similar appearance, with no obvious shifts in the positions of the equipment or vehicles.
    4:30 PM PT

    The site maintains a similar appearance, with no obvious shifts in the positions of the equipment or vehicles.

  13. 2 similar no-change frames4:00 PM–4:15 PM PT

    No visible change was reported between sampled frames; continuous inactivity cannot be inferred.

    1. Construction camera frame at 4:15 PM PT. The scene presents a static view, with all visible machinery holding its place from the previous frame.
      4:15 PM PT

      The scene presents a static view, with all visible machinery holding its place from the previous frame.

    2. Construction camera frame at 4:00 PM PT. All visible elements on the site remain in the same locations as they were fifteen minutes ago.
      4:00 PM PT

      All visible elements on the site remain in the same locations as they were fifteen minutes ago.

  14. Construction camera frame at 3:45 PM PT. The site's appearance is consistent between these frames, with no detectable movement of equipment or materials.
    3:45 PM PT

    The site's appearance is consistent between these frames, with no detectable movement of equipment or materials.

  15. Construction camera frame at 3:30 PM PT. The site appears unchanged, with all visible equipment maintaining its previous positions.
    3:30 PM PT

    The site appears unchanged, with all visible equipment maintaining its previous positions.

  16. Construction camera frame at 3:15 PM PT. The site continues to display little alteration, with all visible machinery still positioned as it was previously.
    3:15 PM PT

    The site continues to display little alteration, with all visible machinery still positioned as it was previously.

  17. Construction camera frame at 3:00 PM PT. The view across the site holds steady, with no visible shifts in equipment placement over the last fifteen minutes.
    3:00 PM PT

    The view across the site holds steady, with no visible shifts in equipment placement over the last fifteen minutes.

  18. Construction camera frame at 2:45 PM PT. The site remains consistent, showing no visible repositioning of equipment or materials in the last fifteen minutes.
    2:45 PM PT

    The site remains consistent, showing no visible repositioning of equipment or materials in the last fifteen minutes.

  19. 4 similar no-change frames1:45 PM–2:30 PM PT

    No visible change was reported between sampled frames; continuous inactivity cannot be inferred.

    1. Construction camera frame at 2:30 PM PT. The scene is holding a steady state, with equipment and materials appearing in the same positions as the previous frame.
      2:30 PM PT

      The scene is holding a steady state, with equipment and materials appearing in the same positions as the previous frame.

    2. Construction camera frame at 2:15 PM PT. The site presents a static view, with no apparent alterations in the positions of equipment or materials.
      2:15 PM PT

      The site presents a static view, with no apparent alterations in the positions of equipment or materials.

    3. Construction camera frame at 2:00 PM PT. The scene remains remarkably similar, with no discernible changes in the placement of machinery or materials.
      2:00 PM PT

      The scene remains remarkably similar, with no discernible changes in the placement of machinery or materials.

    4. Construction camera frame at 1:45 PM PT. The site appears unchanged, with all visible equipment remaining in the same locations as before.
      1:45 PM PT

      The site appears unchanged, with all visible equipment remaining in the same locations as before.

  20. Construction camera frame at 1:30 PM PT. Everything remains in place across the site with no detectable movement between frames.
    1:30 PM PT

    Everything remains in place across the site with no detectable movement between frames.

  21. Construction camera frame at 1:15 PM PT. The overall layout of the site holds steady, without noticeable shifts in equipment or material placement.
    1:15 PM PT

    The overall layout of the site holds steady, without noticeable shifts in equipment or material placement.

  22. Construction camera frame at 1:00 PM PT. The site’s appearance is largely consistent between frames, though a small red container appears to have moved slightly closer to the street on the left.
    1:00 PM PT

    The site’s appearance is largely consistent between frames, though a small red container appears to have moved slightly closer to the street on the left.

  23. Construction camera frame at 12:45 PM PT. A yellow machine near the center of the site has shifted position slightly toward the lower edge of the frame.
    12:45 PM PT

    A yellow machine near the center of the site has shifted position slightly toward the lower edge of the frame.

  24. Construction camera frame at 12:30 PM PT. The site presents a static view, with no visible alterations to the positions of equipment or materials over the last fifteen minutes.
    12:30 PM PT

    The site presents a static view, with no visible alterations to the positions of equipment or materials over the last fifteen minutes.

  25. Construction camera frame at 12:15 PM PT. The scene remains remarkably still, with no readily apparent changes in machinery or vehicle positioning.
    12:15 PM PT

    The scene remains remarkably still, with no readily apparent changes in machinery or vehicle positioning.

  26. 2 similar no-change frames11:45 AM–12:00 PM PT

    No visible change was reported between sampled frames; continuous inactivity cannot be inferred.

    1. Construction camera frame at 12:00 PM PT. The site's arrangement of equipment and materials appears stable, showing no alterations in the last fifteen minutes.
      12:00 PM PT

      The site's arrangement of equipment and materials appears stable, showing no alterations in the last fifteen minutes.

    2. Construction camera frame at 11:45 AM PT. The site appears unchanged, with all visible equipment remaining in the same positions as before.
      11:45 AM PT

      The site appears unchanged, with all visible equipment remaining in the same positions as before.

  27. Construction camera frame at 11:30 AM PT. The overall layout of the site remains consistent, with no noticeable repositioning of the equipment within the timeframe.
    11:30 AM PT

    The overall layout of the site remains consistent, with no noticeable repositioning of the equipment within the timeframe.

  28. 4 similar no-change frames10:30 AM–11:15 AM PT

    No visible change was reported between sampled frames; continuous inactivity cannot be inferred.

    1. Construction camera frame at 11:15 AM PT. The site holds steady, with no discernible shifts in equipment or vehicle locations during the last quarter hour.
      11:15 AM PT

      The site holds steady, with no discernible shifts in equipment or vehicle locations during the last quarter hour.

    2. Construction camera frame at 11:00 AM PT. No movement is visible across the block, with all machinery and vehicles staying in place.
      11:00 AM PT

      No movement is visible across the block, with all machinery and vehicles staying in place.

    3. Construction camera frame at 10:45 AM PT. The site presents a static view, with no observable shifts in the positioning of machinery or vehicles.
      10:45 AM PT

      The site presents a static view, with no observable shifts in the positioning of machinery or vehicles.

    4. Construction camera frame at 10:30 AM PT. The scene remains largely as it was, with no apparent movement of equipment or vehicles in the intervening time.
      10:30 AM PT

      The scene remains largely as it was, with no apparent movement of equipment or vehicles in the intervening time.

  29. Construction camera frame at 10:15 AM PT. Everything on site maintains its prior positioning, with no readily visible adjustments in the last fifteen minutes.
    10:15 AM PT

    Everything on site maintains its prior positioning, with no readily visible adjustments in the last fifteen minutes.

  30. Construction camera frame at 10:00 AM PT. The site appears quiet, with no obvious changes in the positions of the machines or vehicles over the past fifteen minutes.
    10:00 AM PT

    The site appears quiet, with no obvious changes in the positions of the machines or vehicles over the past fifteen minutes.

  31. 5 similar no-change frames8:45 AM–9:45 AM PT

    No visible change was reported between sampled frames; continuous inactivity cannot be inferred.

    1. Construction camera frame at 9:45 AM PT. The arrangement of equipment and vehicles across the site appears unchanged over the last fifteen minutes.
      9:45 AM PT

      The arrangement of equipment and vehicles across the site appears unchanged over the last fifteen minutes.

    2. Construction camera frame at 9:30 AM PT. The view across the site remains consistent, showing no discernible shifts in equipment or vehicle locations.
      9:30 AM PT

      The view across the site remains consistent, showing no discernible shifts in equipment or vehicle locations.

    3. Construction camera frame at 9:15 AM PT. The site holds steady, with no noticeable alterations to the placement of machinery or vehicles during the last fifteen minutes.
      9:15 AM PT

      The site holds steady, with no noticeable alterations to the placement of machinery or vehicles during the last fifteen minutes.

    4. Construction camera frame at 9:00 AM PT. The site presents a static view, with equipment remaining in the same positions as observed moments ago.
      9:00 AM PT

      The site presents a static view, with equipment remaining in the same positions as observed moments ago.

    5. Construction camera frame at 8:45 AM PT. The scene is remarkably stable, with no apparent movement of vehicles or equipment in the last quarter of an hour.
      8:45 AM PT

      The scene is remarkably stable, with no apparent movement of vehicles or equipment in the last quarter of an hour.

  32. Construction camera frame at 8:30 AM PT. The small red and white vehicle has moved further into the block, now positioned closer to the cluster of yellow machinery. Otherwise, the scene appears largely as it was fifteen minutes ago.
    8:30 AM PT

    The small red and white vehicle has moved further into the block, now positioned closer to the cluster of yellow machinery. Otherwise, the scene appears largely as it was fifteen minutes ago.

  33. Construction camera frame at 8:15 AM PT. The red and white vehicle that entered the site earlier has shifted its position slightly toward the center of the block. Otherwise, the equipment arrangement remains consistent.
    8:15 AM PT

    The red and white vehicle that entered the site earlier has shifted its position slightly toward the center of the block. Otherwise, the equipment arrangement remains consistent.

  34. 2 similar no-change frames7:45 AM–8:00 AM PT

    No visible change was reported between sampled frames; continuous inactivity cannot be inferred.

    1. Construction camera frame at 8:00 AM PT. The overall layout of the site remains unchanged, with no visible adjustments to equipment positions.
      8:00 AM PT

      The overall layout of the site remains unchanged, with no visible adjustments to equipment positions.

    2. Construction camera frame at 7:45 AM PT. The site remains quiet, with no discernible shifts in equipment or activity over the past fifteen minutes.
      7:45 AM PT

      The site remains quiet, with no discernible shifts in equipment or activity over the past fifteen minutes.

  35. Construction camera frame at 7:30 AM PT. A small red and white vehicle has entered the site from the driveway on the left side of the frame. Otherwise, the arrangement of the larger machines appears to be holding steady.
    7:30 AM PT

    A small red and white vehicle has entered the site from the driveway on the left side of the frame. Otherwise, the arrangement of the larger machines appears to be holding steady.

  36. 3 similar no-change frames6:45 AM–7:15 AM PT

    No visible change was reported between sampled frames; continuous inactivity cannot be inferred.

    1. Construction camera frame at 7:15 AM PT. The site presents a static view, with all equipment remaining in the same positions as observed earlier.
      7:15 AM PT

      The site presents a static view, with all equipment remaining in the same positions as observed earlier.

    2. Construction camera frame at 7:00 AM PT. No movement is visible across the block between these two frames.
      7:00 AM PT

      No movement is visible across the block between these two frames.

    3. Construction camera frame at 6:45 AM PT. Equipment placement across the site is consistent, showing no significant movement in the last quarter of an hour.
      6:45 AM PT

      Equipment placement across the site is consistent, showing no significant movement in the last quarter of an hour.

  37. Construction camera frame at 6:30 AM PT. The scene appears stable, with the arrangement of machinery consistent between the two views.
    6:30 AM PT

    The scene appears stable, with the arrangement of machinery consistent between the two views.

  38. 8 similar no-change frames12:00 AM–6:15 AM PT

    No visible change was reported between sampled frames; continuous inactivity cannot be inferred.

    1. Construction camera frame at 6:15 AM PT. The large yellow machine near the center of the site has shifted slightly to the east. Otherwise, the scene remains largely unchanged, with equipment positioned as it was fifteen minutes ago.
      6:15 AM PT

      The large yellow machine near the center of the site has shifted slightly to the east. Otherwise, the scene remains largely unchanged, with equipment positioned as it was fifteen minutes ago.

    2. Construction camera frame at 6:00 AM PT. No construction activity — the site is quiet.
      6:00 AM PT

      No construction activity — the site is quiet.

    3. Construction camera frame at 5:00 AM PT. No construction activity — the site is quiet.
      5:00 AM PT

      No construction activity — the site is quiet.

    4. Construction camera frame at 4:00 AM PT. No construction activity — the site is quiet.
      4:00 AM PT

      No construction activity — the site is quiet.

    5. Construction camera frame at 3:00 AM PT. No construction activity — the site is quiet.
      3:00 AM PT

      No construction activity — the site is quiet.

    6. Construction camera frame at 2:00 AM PT. No construction activity — the site is quiet.
      2:00 AM PT

      No construction activity — the site is quiet.

    7. Construction camera frame at 1:00 AM PT. No construction activity — the site is quiet.
      1:00 AM PT

      No construction activity — the site is quiet.

    8. Construction camera frame at 12:00 AM PT. No construction activity — the site is quiet.
      12:00 AM PT

      No construction activity — the site is quiet.

← Aug 22All daysAug 24 →