Skip to content
606Onni 606 · Bellevue
  • Live
  • Progress
  • Project
  • History
  • Search
606

606 (& 620) 106th Ave NE, Bellevue, WA

An independent guide to the Onni 606 development.

For the wider city, visit bellevue.wiki ↗

Project

  • Overview
  • Live cam
  • Latest progress
  • Construction log
  • News
  • Permit ledger
  • Construction impacts
  • The Towers
  • Skyline & height
  • Timeline
  • Gallery

Context

  • History of the block
  • Location
  • Developer

Help

  • Search the site
  • FAQ
  • Glossary
  • Sources & press
  • Contact
  • Updates feed
  • Sitemap

This is an independent, informational fan site. It is not affiliated with, sponsored by, or endorsed by Onni Group. Figures are compiled from public reporting and are approximate and subject to change. Project names and trademarks belong to their respective owners.

© 2026 onni606.com — built by an enthusiast.

  1. Home
  2. /Construction log
  3. /Monday, August 24, 2026

Construction log

Monday, August 24, 2026

66 snapshots from the live camera.


AI digest

The site remained largely quiet, with equipment and vehicles mostly holding position; a few trucks and small machines shifted around during the day. Compared with August 17, the ground layout appears broadly similar, with no clear substantial change visible.

▶ Play this day as a timelapse
  1. Construction camera frame at 11:00 PM PT. No construction activity — the site is quiet.
    11:00 PM PT

    No construction activity — the site is quiet.

  2. 8 similar no-change frames7:00 PM–10:00 PM PT

    No visible change was reported between sampled frames; continuous inactivity cannot be inferred.

    1. Construction camera frame at 10:00 PM PT. No construction activity — the site is quiet.
      10:00 PM PT

      No construction activity — the site is quiet.

    2. Construction camera frame at 9:00 PM PT. No construction activity — the site is quiet.
      9:00 PM PT

      No construction activity — the site is quiet.

    3. Construction camera frame at 8:15 PM PT. The site appears quiet, with no observable changes in the placement of equipment or vehicles during the last fifteen minutes.
      8:15 PM PT

      The site appears quiet, with no observable changes in the placement of equipment or vehicles during the last fifteen minutes.

    4. Construction camera frame at 8:00 PM PT. The scene is largely unchanged, with equipment remaining in the same positions as fifteen minutes ago.
      8:00 PM PT

      The scene is largely unchanged, with equipment remaining in the same positions as fifteen minutes ago.

    5. Construction camera frame at 7:45 PM PT. Everything on site holds its position, with no apparent movement of vehicles or equipment in the intervening time.
      7:45 PM PT

      Everything on site holds its position, with no apparent movement of vehicles or equipment in the intervening time.

    6. Construction camera frame at 7:30 PM PT. The site shows no obvious alterations, and the positions of the machines appear static.
      7:30 PM PT

      The site shows no obvious alterations, and the positions of the machines appear static.

    7. Construction camera frame at 7:15 PM PT. The site presents a stable picture, with all visible machinery remaining in the same locations.
      7:15 PM PT

      The site presents a stable picture, with all visible machinery remaining in the same locations.

    8. Construction camera frame at 7:00 PM PT. The scene remains consistent, with no discernible shifts in equipment placement or activity over the past quarter hour.
      7:00 PM PT

      The scene remains consistent, with no discernible shifts in equipment placement or activity over the past quarter hour.

  3. Construction camera frame at 6:45 PM PT. The arrangement of machines on the graded area appears identical to the previous view.
    6:45 PM PT

    The arrangement of machines on the graded area appears identical to the previous view.

  4. 3 similar no-change frames6:00 PM–6:30 PM PT

    No visible change was reported between sampled frames; continuous inactivity cannot be inferred.

    1. Construction camera frame at 6:30 PM PT. The site appears quiet, with no discernible movement of equipment or vehicles in the last fifteen minutes.
      6:30 PM PT

      The site appears quiet, with no discernible movement of equipment or vehicles in the last fifteen minutes.

    2. Construction camera frame at 6:15 PM PT. The site remains largely unchanged, with the arrangement of equipment consistent between views.
      6:15 PM PT

      The site remains largely unchanged, with the arrangement of equipment consistent between views.

    3. Construction camera frame at 6:00 PM PT. The graded area shows no visible disturbances, and machinery remains in the same positions as before.
      6:00 PM PT

      The graded area shows no visible disturbances, and machinery remains in the same positions as before.

  5. Construction camera frame at 5:45 PM PT. Equipment across the site holds its positions, and no new vehicles have entered or exited during this interval.
    5:45 PM PT

    Equipment across the site holds its positions, and no new vehicles have entered or exited during this interval.

  6. Construction camera frame at 5:30 PM PT. The site presents a static view, with all machinery remaining in the same locations as the previous observation.
    5:30 PM PT

    The site presents a static view, with all machinery remaining in the same locations as the previous observation.

  7. Construction camera frame at 5:15 PM PT. The scene is stable, and the arrangement of equipment across the site remains consistent with the previous view.
    5:15 PM PT

    The scene is stable, and the arrangement of equipment across the site remains consistent with the previous view.

  8. Construction camera frame at 5:00 PM PT. The overall layout of the site appears consistent, with no immediately apparent shifts in equipment positioning.
    5:00 PM PT

    The overall layout of the site appears consistent, with no immediately apparent shifts in equipment positioning.

  9. Construction camera frame at 4:45 PM PT. The compact loader near the lower-right corner of the frame has moved slightly further into the site. Otherwise, the equipment and the graded area show no other discernible changes.
    4:45 PM PT

    The compact loader near the lower-right corner of the frame has moved slightly further into the site. Otherwise, the equipment and the graded area show no other discernible changes.

  10. Construction camera frame at 4:30 PM PT. The site remains largely unchanged, with machinery holding its previous positions across the graded area.
    4:30 PM PT

    The site remains largely unchanged, with machinery holding its previous positions across the graded area.

  11. Construction camera frame at 4:15 PM PT. A red truck has entered the site via the driveway on the left side of the frame. Otherwise, the equipment and graded area maintain the same arrangement as before.
    4:15 PM PT

    A red truck has entered the site via the driveway on the left side of the frame. Otherwise, the equipment and graded area maintain the same arrangement as before.

  12. 3 similar no-change frames3:30 PM–4:00 PM PT

    No visible change was reported between sampled frames; continuous inactivity cannot be inferred.

    1. Construction camera frame at 4:00 PM PT. No movements or changes are visible across the site between these two frames.
      4:00 PM PT

      No movements or changes are visible across the site between these two frames.

    2. Construction camera frame at 3:45 PM PT. The site’s appearance is virtually identical, with all visible machinery remaining in the same locations.
      3:45 PM PT

      The site’s appearance is virtually identical, with all visible machinery remaining in the same locations.

    3. Construction camera frame at 3:30 PM PT. The scene presents a static view, with the machinery and graded land remaining in the same positions.
      3:30 PM PT

      The scene presents a static view, with the machinery and graded land remaining in the same positions.

  13. Construction camera frame at 3:15 PM PT. The arrangement of machines across the site appears stable, lacking any noticeable shifts in position.
    3:15 PM PT

    The arrangement of machines across the site appears stable, lacking any noticeable shifts in position.

  14. Construction camera frame at 3:00 PM PT. A single piece of equipment has shifted position in the lower-right quadrant of the site. The overall layout of machinery and the graded area remain otherwise consistent.
    3:00 PM PT

    A single piece of equipment has shifted position in the lower-right quadrant of the site. The overall layout of machinery and the graded area remain otherwise consistent.

  15. Construction camera frame at 2:45 PM PT. The site displays a remarkably consistent appearance, with no clear alterations to equipment placement or the terrain.
    2:45 PM PT

    The site displays a remarkably consistent appearance, with no clear alterations to equipment placement or the terrain.

  16. Construction camera frame at 2:30 PM PT. The equipment arrangement appears consistent between these views, with no apparent repositioning of machines or vehicles.
    2:30 PM PT

    The equipment arrangement appears consistent between these views, with no apparent repositioning of machines or vehicles.

  17. Construction camera frame at 2:15 PM PT. The scene remains largely unchanged, with equipment holding its positions on the graded block.
    2:15 PM PT

    The scene remains largely unchanged, with equipment holding its positions on the graded block.

  18. Construction camera frame at 2:00 PM PT. Everything remains in place across the block, with no detectable movement of machinery or vehicles.
    2:00 PM PT

    Everything remains in place across the block, with no detectable movement of machinery or vehicles.

  19. 4 similar no-change frames1:00 PM–1:45 PM PT

    No visible change was reported between sampled frames; continuous inactivity cannot be inferred.

    1. Construction camera frame at 1:45 PM PT. The site continues to present a static view, with no discernible changes in the location of machinery or the graded terrain.
      1:45 PM PT

      The site continues to present a static view, with no discernible changes in the location of machinery or the graded terrain.

    2. Construction camera frame at 1:30 PM PT. A small white vehicle has moved from the upper-center to the lower-center of the site. Otherwise, the scene shows a continuation of the previous conditions, with equipment remaining largely in the same positions.
      1:30 PM PT

      A small white vehicle has moved from the upper-center to the lower-center of the site. Otherwise, the scene shows a continuation of the previous conditions, with equipment remaining largely in the same positions.

    3. Construction camera frame at 1:15 PM PT. The site maintains its current configuration, with no visible shifts in equipment positioning or surface conditions.
      1:15 PM PT

      The site maintains its current configuration, with no visible shifts in equipment positioning or surface conditions.

    4. Construction camera frame at 1:00 PM PT. No movement is visible across the site, and the machinery remains in place.
      1:00 PM PT

      No movement is visible across the site, and the machinery remains in place.

  20. Construction camera frame at 12:30 PM PT. The site appears quiet, with no obvious alterations to the placement of the machines or the surface grading.
    12:30 PM PT

    The site appears quiet, with no obvious alterations to the placement of the machines or the surface grading.

  21. Construction camera frame at 12:15 PM PT. The site’s appearance is remarkably stable, showing no clear movement of equipment or materials in the intervening time.
    12:15 PM PT

    The site’s appearance is remarkably stable, showing no clear movement of equipment or materials in the intervening time.

  22. Construction camera frame at 12:00 PM PT. The scene remains largely as it was, with no noticeable repositioning of the machinery or alterations to the graded surface.
    12:00 PM PT

    The scene remains largely as it was, with no noticeable repositioning of the machinery or alterations to the graded surface.

  23. Construction camera frame at 11:45 AM PT. The arrangement of equipment on the site remains consistent between views, with only minor shifts in shadow patterns.
    11:45 AM PT

    The arrangement of equipment on the site remains consistent between views, with only minor shifts in shadow patterns.

  24. 2 similar no-change frames11:15 AM–11:30 AM PT

    No visible change was reported between sampled frames; continuous inactivity cannot be inferred.

    1. Construction camera frame at 11:30 AM PT. The graded area remains largely unchanged, though the shadows have shifted slightly with the sun's movement.
      11:30 AM PT

      The graded area remains largely unchanged, though the shadows have shifted slightly with the sun's movement.

    2. Construction camera frame at 11:15 AM PT. The site presents a static view, with no discernible shifts in the positions of equipment or materials.
      11:15 AM PT

      The site presents a static view, with no discernible shifts in the positions of equipment or materials.

  25. Construction camera frame at 11:00 AM PT. The scene holds steady, with the arrangement of machinery and the graded area remaining consistent.
    11:00 AM PT

    The scene holds steady, with the arrangement of machinery and the graded area remaining consistent.

  26. Construction camera frame at 10:45 AM PT. The site appears quiet, with no obvious changes in equipment placement or activity since the last view.
    10:45 AM PT

    The site appears quiet, with no obvious changes in equipment placement or activity since the last view.

  27. Construction camera frame at 10:30 AM PT. A small, dark shape is now visible near the lower-right corner of the site, having not been present in the earlier view.
    10:30 AM PT

    A small, dark shape is now visible near the lower-right corner of the site, having not been present in the earlier view.

  28. Construction camera frame at 10:15 AM PT. Equipment positions appear stable, though a white vehicle has entered the site via the driveway on the left.
    10:15 AM PT

    Equipment positions appear stable, though a white vehicle has entered the site via the driveway on the left.

  29. Construction camera frame at 10:00 AM PT. The overall scene is remarkably still, with the positioning of machines and materials appearing consistent between views.
    10:00 AM PT

    The overall scene is remarkably still, with the positioning of machines and materials appearing consistent between views.

  30. 2 similar no-change frames9:30 AM–9:45 AM PT

    No visible change was reported between sampled frames; continuous inactivity cannot be inferred.

    1. Construction camera frame at 9:45 AM PT. The scene remains largely unchanged, with equipment holding its positions across the site.
      9:45 AM PT

      The scene remains largely unchanged, with equipment holding its positions across the site.

    2. Construction camera frame at 9:30 AM PT. The site presents a similar view as before, with no discernible shifts in the placement of the heavy equipment.
      9:30 AM PT

      The site presents a similar view as before, with no discernible shifts in the placement of the heavy equipment.

  31. Construction camera frame at 9:15 AM PT. The equipment layout remains consistent, though a small, dark-colored object has appeared near the center-right of the site.
    9:15 AM PT

    The equipment layout remains consistent, though a small, dark-colored object has appeared near the center-right of the site.

  32. 2 similar no-change frames8:45 AM–9:00 AM PT

    No visible change was reported between sampled frames; continuous inactivity cannot be inferred.

    1. Construction camera frame at 9:00 AM PT. The scene holds steady, with no apparent movement of equipment or vehicles in either view.
      9:00 AM PT

      The scene holds steady, with no apparent movement of equipment or vehicles in either view.

    2. Construction camera frame at 8:45 AM PT. The site appears quiet, with no noticeable alterations to the positions of equipment or vehicles.
      8:45 AM PT

      The site appears quiet, with no noticeable alterations to the positions of equipment or vehicles.

  33. Construction camera frame at 8:30 AM PT. The arrangement of equipment appears stable, though a small yellow machine has moved from the right side to the center of the site.
    8:30 AM PT

    The arrangement of equipment appears stable, though a small yellow machine has moved from the right side to the center of the site.

  34. Construction camera frame at 8:15 AM PT. A white pickup truck has entered the site from the driveway on the left and is now positioned near the equipment in that area. Otherwise, the layout of machinery appears consistent between the two views.
    8:15 AM PT

    A white pickup truck has entered the site from the driveway on the left and is now positioned near the equipment in that area. Otherwise, the layout of machinery appears consistent between the two views.

  35. Construction camera frame at 8:00 AM PT. One of the yellow machines near the center has shifted slightly toward the lower edge of the site. Otherwise, the scene remains largely unchanged.
    8:00 AM PT

    One of the yellow machines near the center has shifted slightly toward the lower edge of the site. Otherwise, the scene remains largely unchanged.

  36. Construction camera frame at 7:45 AM PT. A yellow truck has moved from the upper-left to the center-left of the site. The rest of the scene remains as it was.
    7:45 AM PT

    A yellow truck has moved from the upper-left to the center-left of the site. The rest of the scene remains as it was.

  37. 2 similar no-change frames7:15 AM–7:30 AM PT

    No visible change was reported between sampled frames; continuous inactivity cannot be inferred.

    1. Construction camera frame at 7:30 AM PT. Equipment remains in the same positions, though a bright orange safety cone is now visible near the center-left of the site.
      7:30 AM PT

      Equipment remains in the same positions, though a bright orange safety cone is now visible near the center-left of the site.

    2. Construction camera frame at 7:15 AM PT. The scene holds steady, with no discernible shifts in equipment placement or activity.
      7:15 AM PT

      The scene holds steady, with no discernible shifts in equipment placement or activity.

  38. Construction camera frame at 7:00 AM PT. The equipment arrangement across the site is consistent, but a small dark object has appeared near the center of the lower half.
    7:00 AM PT

    The equipment arrangement across the site is consistent, but a small dark object has appeared near the center of the lower half.

  39. Construction camera frame at 6:45 AM PT. No movement or changes are visible across the site.
    6:45 AM PT

    No movement or changes are visible across the site.

  40. Construction camera frame at 6:30 AM PT. The scene appears stable, with the equipment positions remaining consistent between the two views.
    6:30 AM PT

    The scene appears stable, with the equipment positions remaining consistent between the two views.

  41. Construction camera frame at 6:15 AM PT. Several pieces of heavy equipment are now visible across the site, where the earlier frame showed a more open area. Otherwise, the scene appears quiet with low visibility due to the nighttime conditions.
    6:15 AM PT

    Several pieces of heavy equipment are now visible across the site, where the earlier frame showed a more open area. Otherwise, the scene appears quiet with low visibility due to the nighttime conditions.

  42. 7 similar no-change frames12:00 AM–6:00 AM PT

    No visible change was reported between sampled frames; continuous inactivity cannot be inferred.

    1. Construction camera frame at 6:00 AM PT. The site remains largely unchanged, though the increased light reveals more detail in the graded area.
      6:00 AM PT

      The site remains largely unchanged, though the increased light reveals more detail in the graded area.

    2. Construction camera frame at 5:00 AM PT. No construction activity — the site is quiet.
      5:00 AM PT

      No construction activity — the site is quiet.

    3. Construction camera frame at 4:00 AM PT. No construction activity — the site is quiet.
      4:00 AM PT

      No construction activity — the site is quiet.

    4. Construction camera frame at 3:00 AM PT. No construction activity — the site is quiet.
      3:00 AM PT

      No construction activity — the site is quiet.

    5. Construction camera frame at 2:00 AM PT. No construction activity — the site is quiet.
      2:00 AM PT

      No construction activity — the site is quiet.

    6. Construction camera frame at 1:00 AM PT. No construction activity — the site is quiet.
      1:00 AM PT

      No construction activity — the site is quiet.

    7. Construction camera frame at 12:00 AM PT. No construction activity — the site is quiet.
      12:00 AM PT

      No construction activity — the site is quiet.

← Aug 23All daysAug 25 →