Skip to content
606Onni 606 · Bellevue
  • Live
  • Progress
  • Project
  • History
  • Search
606

606 (& 620) 106th Ave NE, Bellevue, WA

An independent guide to the Onni 606 development.

For the wider city, visit bellevue.wiki ↗

Project

  • Overview
  • Live cam
  • Latest progress
  • Construction log
  • News
  • Permit ledger
  • Construction impacts
  • The Towers
  • Skyline & height
  • Timeline
  • Gallery

Context

  • History of the block
  • Location
  • Developer

Help

  • Search the site
  • FAQ
  • Glossary
  • Sources & press
  • Contact
  • Updates feed
  • Sitemap

This is an independent, informational fan site. It is not affiliated with, sponsored by, or endorsed by Onni Group. Figures are compiled from public reporting and are approximate and subject to change. Project names and trademarks belong to their respective owners.

© 2026 onni606.com — built by an enthusiast.

  1. Home
  2. /Construction log
  3. /Saturday, August 29, 2026

Construction log

Saturday, August 29, 2026

65 snapshots from the live camera.


AI digest

The site remained largely quiet, with only brief vehicle arrivals and minor repositioning of equipment reported. Compared with August 22, the graded ground and central cut look broadly similar; no substantial change is clear in today’s frames.

▶ Play this day as a timelapse
  1. Construction camera frame at 11:00 PM PT. No construction activity — the site is quiet.
    11:00 PM PT

    No construction activity — the site is quiet.

  2. 4 similar no-change frames7:45 PM–10:00 PM PT

    No visible change was reported between sampled frames; continuous inactivity cannot be inferred.

    1. Construction camera frame at 10:00 PM PT. No construction activity — the site is quiet.
      10:00 PM PT

      No construction activity — the site is quiet.

    2. Construction camera frame at 9:00 PM PT. No construction activity — the site is quiet.
      9:00 PM PT

      No construction activity — the site is quiet.

    3. Construction camera frame at 8:00 PM PT. The site appears static, with all visible elements remaining in the same positions as before.
      8:00 PM PT

      The site appears static, with all visible elements remaining in the same positions as before.

    4. Construction camera frame at 7:45 PM PT. The site’s appearance is consistent between views, with no visible shifts in machinery or vehicle positions.
      7:45 PM PT

      The site’s appearance is consistent between views, with no visible shifts in machinery or vehicle positions.

  3. Construction camera frame at 7:30 PM PT. The scene presents a stable picture, with equipment and vehicles maintaining their positions from the prior view.
    7:30 PM PT

    The scene presents a stable picture, with equipment and vehicles maintaining their positions from the prior view.

  4. 6 similar no-change frames6:00 PM–7:15 PM PT

    No visible change was reported between sampled frames; continuous inactivity cannot be inferred.

    1. Construction camera frame at 7:15 PM PT. Equipment remains in the same positions as the previous view, though a small red object has appeared near the lower right corner.
      7:15 PM PT

      Equipment remains in the same positions as the previous view, though a small red object has appeared near the lower right corner.

    2. Construction camera frame at 7:00 PM PT. The view of the site is remarkably consistent, with no apparent changes to equipment placement or vehicle traffic in this period.
      7:00 PM PT

      The view of the site is remarkably consistent, with no apparent changes to equipment placement or vehicle traffic in this period.

    3. Construction camera frame at 6:45 PM PT. The scene remains largely unchanged, with all visible machinery holding its previous positions.
      6:45 PM PT

      The scene remains largely unchanged, with all visible machinery holding its previous positions.

    4. Construction camera frame at 6:30 PM PT. Everything visible on the site maintains its prior location, showing no discernible movement in this interval.
      6:30 PM PT

      Everything visible on the site maintains its prior location, showing no discernible movement in this interval.

    5. Construction camera frame at 6:15 PM PT. The site appears static, with all visible equipment holding its previous position.
      6:15 PM PT

      The site appears static, with all visible equipment holding its previous position.

    6. Construction camera frame at 6:00 PM PT. The site shows no noticeable shifts in the positions of equipment or vehicles during this interval.
      6:00 PM PT

      The site shows no noticeable shifts in the positions of equipment or vehicles during this interval.

  5. Construction camera frame at 5:45 PM PT. The arrangement of machinery on site remains consistent between these views.
    5:45 PM PT

    The arrangement of machinery on site remains consistent between these views.

  6. Construction camera frame at 5:30 PM PT. A small red structure has appeared near the left edge of the frame, close to the street.
    5:30 PM PT

    A small red structure has appeared near the left edge of the frame, close to the street.

  7. Construction camera frame at 5:15 PM PT. Equipment across the site remains in largely the same arrangement as it was fifteen minutes ago.
    5:15 PM PT

    Equipment across the site remains in largely the same arrangement as it was fifteen minutes ago.

  8. Construction camera frame at 5:00 PM PT. The scene is largely unchanged, with equipment and materials remaining in the same positions as fifteen minutes ago.
    5:00 PM PT

    The scene is largely unchanged, with equipment and materials remaining in the same positions as fifteen minutes ago.

  9. Construction camera frame at 4:45 PM PT. The site maintains its current appearance, with no readily visible movement of equipment or vehicles.
    4:45 PM PT

    The site maintains its current appearance, with no readily visible movement of equipment or vehicles.

  10. Construction camera frame at 4:30 PM PT. The site appears quiet, with no discernible changes in equipment positioning or vehicle traffic over the last fifteen minutes.
    4:30 PM PT

    The site appears quiet, with no discernible changes in equipment positioning or vehicle traffic over the last fifteen minutes.

  11. Construction camera frame at 4:15 PM PT. The red portable office near the driveway on the left side of the frame has shifted slightly further into the site.
    4:15 PM PT

    The red portable office near the driveway on the left side of the frame has shifted slightly further into the site.

  12. Construction camera frame at 4:00 PM PT. The view across the site remains consistent, with all visible machinery and vehicles holding their positions.
    4:00 PM PT

    The view across the site remains consistent, with all visible machinery and vehicles holding their positions.

  13. Construction camera frame at 3:45 PM PT. The site presents a consistent view, with no obvious shifts in the placement of machinery or vehicles.
    3:45 PM PT

    The site presents a consistent view, with no obvious shifts in the placement of machinery or vehicles.

  14. 4 similar no-change frames2:45 PM–3:30 PM PT

    No visible change was reported between sampled frames; continuous inactivity cannot be inferred.

    1. Construction camera frame at 3:30 PM PT. The arrangement of the machinery appears static, with all equipment remaining in the same locations as before.
      3:30 PM PT

      The arrangement of the machinery appears static, with all equipment remaining in the same locations as before.

    2. Construction camera frame at 3:15 PM PT. The scene remains largely unchanged, with equipment holding its positions across the site.
      3:15 PM PT

      The scene remains largely unchanged, with equipment holding its positions across the site.

    3. Construction camera frame at 3:00 PM PT. Everything on site appears to be holding its place, with no noticeable movement of vehicles or equipment.
      3:00 PM PT

      Everything on site appears to be holding its place, with no noticeable movement of vehicles or equipment.

    4. Construction camera frame at 2:45 PM PT. The site's appearance is remarkably stable, showing no discernible alterations in equipment or vehicle positions.
      2:45 PM PT

      The site's appearance is remarkably stable, showing no discernible alterations in equipment or vehicle positions.

  15. Construction camera frame at 2:30 PM PT. The overall arrangement of equipment remains consistent, though a single piece of machinery near the center appears to have shifted slightly to the right.
    2:30 PM PT

    The overall arrangement of equipment remains consistent, though a single piece of machinery near the center appears to have shifted slightly to the right.

  16. Construction camera frame at 2:15 PM PT. A white vehicle has entered the site via the driveway on the left, positioning itself among the other equipment.
    2:15 PM PT

    A white vehicle has entered the site via the driveway on the left, positioning itself among the other equipment.

  17. Construction camera frame at 2:00 PM PT. A small dark object has appeared near the center of the site, having not been visible in the earlier frame.
    2:00 PM PT

    A small dark object has appeared near the center of the site, having not been visible in the earlier frame.

  18. Construction camera frame at 1:45 PM PT. The site continues to show a consistent appearance, with no readily apparent shifts in equipment or vehicle placement.
    1:45 PM PT

    The site continues to show a consistent appearance, with no readily apparent shifts in equipment or vehicle placement.

  19. 4 similar no-change frames12:45 PM–1:30 PM PT

    No visible change was reported between sampled frames; continuous inactivity cannot be inferred.

    1. Construction camera frame at 1:30 PM PT. The scene presents a static view, with all visible machinery and vehicles maintaining their previous positions.
      1:30 PM PT

      The scene presents a static view, with all visible machinery and vehicles maintaining their previous positions.

    2. Construction camera frame at 1:15 PM PT. The site remains largely unchanged, with the same equipment visible in the same positions as before.
      1:15 PM PT

      The site remains largely unchanged, with the same equipment visible in the same positions as before.

    3. Construction camera frame at 1:00 PM PT. Everything on site appears to be holding its place, with no noticeable alterations in the last quarter of an hour.
      1:00 PM PT

      Everything on site appears to be holding its place, with no noticeable alterations in the last quarter of an hour.

    4. Construction camera frame at 12:45 PM PT. The arrangement of equipment on site is remarkably consistent, showing no discernible movement in the last fifteen minutes.
      12:45 PM PT

      The arrangement of equipment on site is remarkably consistent, showing no discernible movement in the last fifteen minutes.

  20. Construction camera frame at 12:30 PM PT. The view from the camera holds steady, with no observable adjustments to the arrangement of machinery or vehicles on the site.
    12:30 PM PT

    The view from the camera holds steady, with no observable adjustments to the arrangement of machinery or vehicles on the site.

  21. Construction camera frame at 12:15 PM PT. A shadow has shifted across the lower right portion of the site, but all equipment remains in the same location.
    12:15 PM PT

    A shadow has shifted across the lower right portion of the site, but all equipment remains in the same location.

  22. 2 similar no-change frames11:45 AM–12:00 PM PT

    No visible change was reported between sampled frames; continuous inactivity cannot be inferred.

    1. Construction camera frame at 12:00 PM PT. The site's appearance is almost identical to the last view, with no visible changes in equipment positioning or vehicle movement.
      12:00 PM PT

      The site's appearance is almost identical to the last view, with no visible changes in equipment positioning or vehicle movement.

    2. Construction camera frame at 11:45 AM PT. The scene appears static, with the machinery and materials maintaining their positions from the previous view.
      11:45 AM PT

      The scene appears static, with the machinery and materials maintaining their positions from the previous view.

  23. Construction camera frame at 11:30 AM PT. The scene remains largely as it was fifteen minutes ago, with no obvious shifts in the placement of equipment or materials.
    11:30 AM PT

    The scene remains largely as it was fifteen minutes ago, with no obvious shifts in the placement of equipment or materials.

  24. Construction camera frame at 11:15 AM PT. The overall scene remains stable, with no apparent repositioning of the machines or materials visible across the site.
    11:15 AM PT

    The overall scene remains stable, with no apparent repositioning of the machines or materials visible across the site.

  25. 2 similar no-change frames10:45 AM–11:00 AM PT

    No visible change was reported between sampled frames; continuous inactivity cannot be inferred.

    1. Construction camera frame at 11:00 AM PT. The site presents a remarkably similar view to the one from fifteen minutes ago, with no discernible movement of equipment or vehicles.
      11:00 AM PT

      The site presents a remarkably similar view to the one from fifteen minutes ago, with no discernible movement of equipment or vehicles.

    2. Construction camera frame at 10:45 AM PT. The site continues to show a largely unchanging landscape, with equipment remaining in the same positions as fifteen minutes ago.
      10:45 AM PT

      The site continues to show a largely unchanging landscape, with equipment remaining in the same positions as fifteen minutes ago.

  26. Construction camera frame at 10:30 AM PT. The equipment arrangement across the site holds a similar pattern to the view from fifteen minutes ago.
    10:30 AM PT

    The equipment arrangement across the site holds a similar pattern to the view from fifteen minutes ago.

  27. Construction camera frame at 10:15 AM PT. The red container near the street has shifted slightly to the left since the last view. Otherwise, the arrangement of equipment on the site remains consistent.
    10:15 AM PT

    The red container near the street has shifted slightly to the left since the last view. Otherwise, the arrangement of equipment on the site remains consistent.

  28. Construction camera frame at 10:00 AM PT. The site appears quiet, and equipment positions have not altered noticeably in the last fifteen minutes.
    10:00 AM PT

    The site appears quiet, and equipment positions have not altered noticeably in the last fifteen minutes.

  29. Construction camera frame at 9:45 AM PT. The scene is holding a consistent appearance, with no detectable adjustments to machinery or vehicle locations in the last quarter of an hour.
    9:45 AM PT

    The scene is holding a consistent appearance, with no detectable adjustments to machinery or vehicle locations in the last quarter of an hour.

  30. 4 similar no-change frames8:45 AM–9:30 AM PT

    No visible change was reported between sampled frames; continuous inactivity cannot be inferred.

    1. Construction camera frame at 9:30 AM PT. The view of the site remains steady, with no apparent shifts in equipment placement over the last fifteen minutes.
      9:30 AM PT

      The view of the site remains steady, with no apparent shifts in equipment placement over the last fifteen minutes.

    2. Construction camera frame at 9:15 AM PT. The site presents a still view, with no noticeable alterations to the positions of machinery or vehicles over the past fifteen minutes.
      9:15 AM PT

      The site presents a still view, with no noticeable alterations to the positions of machinery or vehicles over the past fifteen minutes.

    3. Construction camera frame at 9:00 AM PT. A small, dark-colored vehicle has entered the site from the driveway on the left and is now positioned near the dark material pile. Otherwise, the scene appears unchanged from fifteen minutes ago.
      9:00 AM PT

      A small, dark-colored vehicle has entered the site from the driveway on the left and is now positioned near the dark material pile. Otherwise, the scene appears unchanged from fifteen minutes ago.

    4. Construction camera frame at 8:45 AM PT. The site continues to show a stable picture, with no visible movement of equipment or vehicles in the last fifteen minutes.
      8:45 AM PT

      The site continues to show a stable picture, with no visible movement of equipment or vehicles in the last fifteen minutes.

  31. Construction camera frame at 8:30 AM PT. The scene remains remarkably consistent, showing no discernible adjustments to equipment or vehicle locations in the last fifteen minutes.
    8:30 AM PT

    The scene remains remarkably consistent, showing no discernible adjustments to equipment or vehicle locations in the last fifteen minutes.

  32. Construction camera frame at 8:15 AM PT. A piece of machinery has shifted position within the central area of the site, moving slightly to the right. The rest of the scene remains largely unchanged in the last fifteen minutes.
    8:15 AM PT

    A piece of machinery has shifted position within the central area of the site, moving slightly to the right. The rest of the scene remains largely unchanged in the last fifteen minutes.

  33. Construction camera frame at 8:00 AM PT. A red vehicle has moved from the driveway on the left to a position near the service road on the right. Otherwise, the site remains in a similar condition as fifteen minutes ago.
    8:00 AM PT

    A red vehicle has moved from the driveway on the left to a position near the service road on the right. Otherwise, the site remains in a similar condition as fifteen minutes ago.

  34. 4 similar no-change frames7:00 AM–7:45 AM PT

    No visible change was reported between sampled frames; continuous inactivity cannot be inferred.

    1. Construction camera frame at 7:45 AM PT. The construction area shows no visible change in the positions of equipment or vehicles over the last fifteen minutes.
      7:45 AM PT

      The construction area shows no visible change in the positions of equipment or vehicles over the last fifteen minutes.

    2. Construction camera frame at 7:30 AM PT. The site appears quiet, with no noticeable alterations in the placement of machinery or vehicles during the last fifteen minutes.
      7:30 AM PT

      The site appears quiet, with no noticeable alterations in the placement of machinery or vehicles during the last fifteen minutes.

    3. Construction camera frame at 7:15 AM PT. The site presents a static view, with no apparent shifts in equipment positioning over the last quarter hour.
      7:15 AM PT

      The site presents a static view, with no apparent shifts in equipment positioning over the last quarter hour.

    4. Construction camera frame at 7:00 AM PT. The site looks essentially the same, with no discernible movement of equipment or vehicles in the last fifteen minutes.
      7:00 AM PT

      The site looks essentially the same, with no discernible movement of equipment or vehicles in the last fifteen minutes.

  35. Construction camera frame at 6:45 AM PT. The scene appears much brighter now, revealing more detail across the graded site, and a vehicle has entered from the driveway on the left.
    6:45 AM PT

    The scene appears much brighter now, revealing more detail across the graded site, and a vehicle has entered from the driveway on the left.

  36. 8 similar no-change frames12:00 AM–6:30 AM PT

    No visible change was reported between sampled frames; continuous inactivity cannot be inferred.

    1. Construction camera frame at 6:30 AM PT. The site remains largely unchanged, though the lighting appears slightly brighter in the current view.
      6:30 AM PT

      The site remains largely unchanged, though the lighting appears slightly brighter in the current view.

    2. Construction camera frame at 6:00 AM PT. No construction activity — the site is quiet.
      6:00 AM PT

      No construction activity — the site is quiet.

    3. Construction camera frame at 5:00 AM PT. No construction activity — the site is quiet.
      5:00 AM PT

      No construction activity — the site is quiet.

    4. Construction camera frame at 4:00 AM PT. No construction activity — the site is quiet.
      4:00 AM PT

      No construction activity — the site is quiet.

    5. Construction camera frame at 3:00 AM PT. No construction activity — the site is quiet.
      3:00 AM PT

      No construction activity — the site is quiet.

    6. Construction camera frame at 2:00 AM PT. No construction activity — the site is quiet.
      2:00 AM PT

      No construction activity — the site is quiet.

    7. Construction camera frame at 1:00 AM PT. No construction activity — the site is quiet.
      1:00 AM PT

      No construction activity — the site is quiet.

    8. Construction camera frame at 12:00 AM PT. No construction activity — the site is quiet.
      12:00 AM PT

      No construction activity — the site is quiet.

← Aug 28All daysAug 30 →