Skip to content
606Onni 606 · Bellevue
  • Live
  • Progress
  • Project
  • History
  • Search
606

606 (& 620) 106th Ave NE, Bellevue, WA

An independent guide to the Onni 606 development.

For the wider city, visit bellevue.wiki ↗

Project

  • Overview
  • Live cam
  • Latest progress
  • Construction log
  • News
  • Permit ledger
  • Construction impacts
  • The Towers
  • Skyline & height
  • Timeline
  • Gallery

Context

  • History of the block
  • Location
  • Developer

Help

  • Search the site
  • FAQ
  • Glossary
  • Sources & press
  • Contact
  • Updates feed
  • Sitemap

This is an independent, informational fan site. It is not affiliated with, sponsored by, or endorsed by Onni Group. Figures are compiled from public reporting and are approximate and subject to change. Project names and trademarks belong to their respective owners.

© 2026 onni606.com — built by an enthusiast.

  1. Home
  2. /Construction log
  3. /Friday, August 28, 2026

Construction log

Friday, August 28, 2026

67 snapshots from the live camera.


AI digest

The site was largely quiet, with the equipment layout and graded ground appearing unchanged through the day. A dark truck was visible near the right side, and a red vehicle moved across the site; no substantial ground or structural change is apparent.

▶ Play this day as a timelapse
  1. Construction camera frame at 11:00 PM PT. No construction activity — the site is quiet.
    11:00 PM PT

    No construction activity — the site is quiet.

  2. 7 similar no-change frames7:15 PM–10:00 PM PT

    No visible change was reported between sampled frames; continuous inactivity cannot be inferred.

    1. Construction camera frame at 10:00 PM PT. No construction activity — the site is quiet.
      10:00 PM PT

      No construction activity — the site is quiet.

    2. Construction camera frame at 9:00 PM PT. No construction activity — the site is quiet.
      9:00 PM PT

      No construction activity — the site is quiet.

    3. Construction camera frame at 8:15 PM PT. Visibility is low, and the site remains quiet with no clear changes in the positions of equipment or vehicles.
      8:15 PM PT

      Visibility is low, and the site remains quiet with no clear changes in the positions of equipment or vehicles.

    4. Construction camera frame at 8:00 PM PT. The site appears quiet, and no noticeable alterations to the equipment layout are visible in this view.
      8:00 PM PT

      The site appears quiet, and no noticeable alterations to the equipment layout are visible in this view.

    5. Construction camera frame at 7:45 PM PT. Equipment appears to be holding its position, and the view of the site is largely unchanged from fifteen minutes ago.
      7:45 PM PT

      Equipment appears to be holding its position, and the view of the site is largely unchanged from fifteen minutes ago.

    6. Construction camera frame at 7:30 PM PT. The scene remains remarkably consistent, with no apparent changes to the placement of equipment or vehicles.
      7:30 PM PT

      The scene remains remarkably consistent, with no apparent changes to the placement of equipment or vehicles.

    7. Construction camera frame at 7:15 PM PT. The site presents a static view, with no discernible shifts in equipment or activity over the last fifteen minutes.
      7:15 PM PT

      The site presents a static view, with no discernible shifts in equipment or activity over the last fifteen minutes.

  3. Construction camera frame at 7:00 PM PT. The arrangement of machinery on site remains consistent between these views, with no clear movement or additions.
    7:00 PM PT

    The arrangement of machinery on site remains consistent between these views, with no clear movement or additions.

  4. 3 similar no-change frames6:15 PM–6:45 PM PT

    No visible change was reported between sampled frames; continuous inactivity cannot be inferred.

    1. Construction camera frame at 6:45 PM PT. A small, red object is now positioned further out from the left side of the site than it was previously. Otherwise, the arrangement of equipment across the block appears unchanged.
      6:45 PM PT

      A small, red object is now positioned further out from the left side of the site than it was previously. Otherwise, the arrangement of equipment across the block appears unchanged.

    2. Construction camera frame at 6:30 PM PT. The scene shows minimal change, with all visible equipment remaining in the same positions as before.
      6:30 PM PT

      The scene shows minimal change, with all visible equipment remaining in the same positions as before.

    3. Construction camera frame at 6:15 PM PT. The site appears quiet, with no visible alterations to equipment placement or activity during this interval.
      6:15 PM PT

      The site appears quiet, with no visible alterations to equipment placement or activity during this interval.

  5. Construction camera frame at 6:00 PM PT. The scene is largely still, though a small red structure has shifted position near the left edge of the site.
    6:00 PM PT

    The scene is largely still, though a small red structure has shifted position near the left edge of the site.

  6. Construction camera frame at 5:45 PM PT. A dark-colored rectangular object has appeared along the right side of the site, near the service road. Otherwise, the scene remains as it was fifteen minutes ago, with equipment in the same locations.
    5:45 PM PT

    A dark-colored rectangular object has appeared along the right side of the site, near the service road. Otherwise, the scene remains as it was fifteen minutes ago, with equipment in the same locations.

  7. Construction camera frame at 5:30 PM PT. The site's appearance is stable, with no equipment or material noticeably different than it was fifteen minutes ago.
    5:30 PM PT

    The site's appearance is stable, with no equipment or material noticeably different than it was fifteen minutes ago.

  8. Construction camera frame at 5:15 PM PT. The scene presents a static view, as equipment and materials haven't shifted position in the intervening time.
    5:15 PM PT

    The scene presents a static view, as equipment and materials haven't shifted position in the intervening time.

  9. Construction camera frame at 5:00 PM PT. The layout of equipment across the site remains consistent between these views.
    5:00 PM PT

    The layout of equipment across the site remains consistent between these views.

  10. Construction camera frame at 4:45 PM PT. The site remains unchanged, with all visible equipment holding its previous position.
    4:45 PM PT

    The site remains unchanged, with all visible equipment holding its previous position.

  11. Construction camera frame at 4:30 PM PT. Everything on site appears to be holding steady, with no visible repositioning of equipment or materials in the last fifteen minutes.
    4:30 PM PT

    Everything on site appears to be holding steady, with no visible repositioning of equipment or materials in the last fifteen minutes.

  12. 2 similar no-change frames4:00 PM–4:15 PM PT

    No visible change was reported between sampled frames; continuous inactivity cannot be inferred.

    1. Construction camera frame at 4:15 PM PT. The site displays a consistent appearance, with no discernible changes in equipment placement over the past fifteen minutes.
      4:15 PM PT

      The site displays a consistent appearance, with no discernible changes in equipment placement over the past fifteen minutes.

    2. Construction camera frame at 4:00 PM PT. The scene appears remarkably consistent, with no observable shifts in the placement of machinery or materials.
      4:00 PM PT

      The scene appears remarkably consistent, with no observable shifts in the placement of machinery or materials.

  13. Construction camera frame at 3:45 PM PT. Visible elements on the site have maintained their positions during the last fifteen minutes.
    3:45 PM PT

    Visible elements on the site have maintained their positions during the last fifteen minutes.

  14. Construction camera frame at 3:30 PM PT. The site presents a static view, with no apparent movement of equipment or materials in the last quarter of an hour.
    3:30 PM PT

    The site presents a static view, with no apparent movement of equipment or materials in the last quarter of an hour.

  15. Construction camera frame at 3:15 PM PT. The layout of equipment across the site has not shifted in the last fifteen minutes.
    3:15 PM PT

    The layout of equipment across the site has not shifted in the last fifteen minutes.

  16. 18 similar no-change frames10:45 AM–3:00 PM PT

    No visible change was reported between sampled frames; continuous inactivity cannot be inferred.

    1. Construction camera frame at 3:00 PM PT. The scene remains largely unchanged, with all visible equipment and materials holding their previous positions.
      3:00 PM PT

      The scene remains largely unchanged, with all visible equipment and materials holding their previous positions.

    2. Construction camera frame at 2:45 PM PT. Everything on site remains in the same position as it was fifteen minutes ago.
      2:45 PM PT

      Everything on site remains in the same position as it was fifteen minutes ago.

    3. Construction camera frame at 2:30 PM PT. The site shows no discernible alterations in the arrangement of the equipment or materials within the frame.
      2:30 PM PT

      The site shows no discernible alterations in the arrangement of the equipment or materials within the frame.

    4. Construction camera frame at 2:15 PM PT. The site appears quiet, with no discernible alterations in equipment placement or activity over the last fifteen minutes.
      2:15 PM PT

      The site appears quiet, with no discernible alterations in equipment placement or activity over the last fifteen minutes.

    5. Construction camera frame at 2:00 PM PT. No visible changes occurred on the site during the last fifteen minutes; the machinery and materials all remain in the same locations.
      2:00 PM PT

      No visible changes occurred on the site during the last fifteen minutes; the machinery and materials all remain in the same locations.

    6. Construction camera frame at 1:45 PM PT. The site maintains a steady state, with no observable shifts in the placement of machinery or materials.
      1:45 PM PT

      The site maintains a steady state, with no observable shifts in the placement of machinery or materials.

    7. Construction camera frame at 1:30 PM PT. The overall scene presents a consistent picture, with no apparent movement of equipment or vehicles within the frame.
      1:30 PM PT

      The overall scene presents a consistent picture, with no apparent movement of equipment or vehicles within the frame.

    8. Construction camera frame at 1:15 PM PT. The site’s arrangement appears unchanged, with all visible equipment holding its prior position.
      1:15 PM PT

      The site’s arrangement appears unchanged, with all visible equipment holding its prior position.

    9. Construction camera frame at 1:00 PM PT. The scene remains largely static, with the arrangement of equipment and materials appearing unchanged over the last fifteen minutes.
      1:00 PM PT

      The scene remains largely static, with the arrangement of equipment and materials appearing unchanged over the last fifteen minutes.

    10. Construction camera frame at 12:45 PM PT. A red vehicle has moved from the upper-center to the lower-center of the site during the last fifteen minutes. Otherwise, the equipment and surrounding area remain in the same positions.
      12:45 PM PT

      A red vehicle has moved from the upper-center to the lower-center of the site during the last fifteen minutes. Otherwise, the equipment and surrounding area remain in the same positions.

    11. Construction camera frame at 12:30 PM PT. The site’s current appearance is nearly identical to the previous view, with no discernible changes in equipment or vehicle positions.
      12:30 PM PT

      The site’s current appearance is nearly identical to the previous view, with no discernible changes in equipment or vehicle positions.

    12. Construction camera frame at 12:15 PM PT. The site’s layout is stable, with all visible machinery remaining in the same positions as before.
      12:15 PM PT

      The site’s layout is stable, with all visible machinery remaining in the same positions as before.

    13. Construction camera frame at 12:00 PM PT. The view is consistent between frames, showing no shifts in the positions of equipment or vehicles on the site.
      12:00 PM PT

      The view is consistent between frames, showing no shifts in the positions of equipment or vehicles on the site.

    14. Construction camera frame at 11:45 AM PT. The site presents a remarkably similar view, with no apparent movement of equipment or vehicles during the interval.
      11:45 AM PT

      The site presents a remarkably similar view, with no apparent movement of equipment or vehicles during the interval.

    15. Construction camera frame at 11:30 AM PT. The site’s appearance is virtually unchanged, with the machinery remaining in the same locations as previously observed.
      11:30 AM PT

      The site’s appearance is virtually unchanged, with the machinery remaining in the same locations as previously observed.

    16. Construction camera frame at 11:15 AM PT. The scene shows no observable alterations in equipment placement or activity since the last view.
      11:15 AM PT

      The scene shows no observable alterations in equipment placement or activity since the last view.

    17. Construction camera frame at 11:00 AM PT. The scene remains largely static, with no noticeable repositioning of the equipment or vehicles within the site boundaries.
      11:00 AM PT

      The scene remains largely static, with no noticeable repositioning of the equipment or vehicles within the site boundaries.

    18. Construction camera frame at 10:45 AM PT. The scene appears quiet, with no discernible shifts in equipment positioning or vehicle traffic over the last fifteen minutes.
      10:45 AM PT

      The scene appears quiet, with no discernible shifts in equipment positioning or vehicle traffic over the last fifteen minutes.

  17. Construction camera frame at 10:30 AM PT. The overall scene remains much the same, though a red vehicle has moved slightly along the service road on the right side of the frame.
    10:30 AM PT

    The overall scene remains much the same, though a red vehicle has moved slightly along the service road on the right side of the frame.

  18. Construction camera frame at 10:15 AM PT. The site’s configuration has remained consistent, and the equipment appears to be in the same positions.
    10:15 AM PT

    The site’s configuration has remained consistent, and the equipment appears to be in the same positions.

  19. 2 similar no-change frames9:45 AM–10:00 AM PT

    No visible change was reported between sampled frames; continuous inactivity cannot be inferred.

    1. Construction camera frame at 10:00 AM PT. The site presents a similar view as before, with no apparent movement of equipment or vehicles during the interval.
      10:00 AM PT

      The site presents a similar view as before, with no apparent movement of equipment or vehicles during the interval.

    2. Construction camera frame at 9:45 AM PT. A dark-colored truck has entered the site via the driveway on the left side of the frame. Otherwise, the arrangement of equipment and the overall scene appear unchanged.
      9:45 AM PT

      A dark-colored truck has entered the site via the driveway on the left side of the frame. Otherwise, the arrangement of equipment and the overall scene appear unchanged.

  20. Construction camera frame at 9:30 AM PT. The scene is stable, and the placement of machinery and vehicles appears consistent between views.
    9:30 AM PT

    The scene is stable, and the placement of machinery and vehicles appears consistent between views.

  21. Construction camera frame at 9:15 AM PT. The site’s layout is holding, with no noticeable repositioning of equipment or vehicles since the last view.
    9:15 AM PT

    The site’s layout is holding, with no noticeable repositioning of equipment or vehicles since the last view.

  22. Construction camera frame at 9:00 AM PT. The scene shows no discernible alterations, and equipment remains in the same locations as before.
    9:00 AM PT

    The scene shows no discernible alterations, and equipment remains in the same locations as before.

  23. Construction camera frame at 8:45 AM PT. The site maintains its appearance, with equipment and materials holding their positions from the last view.
    8:45 AM PT

    The site maintains its appearance, with equipment and materials holding their positions from the last view.

  24. Construction camera frame at 8:30 AM PT. The scene is holding steady, with no evident shifts in the placement of equipment or vehicles.
    8:30 AM PT

    The scene is holding steady, with no evident shifts in the placement of equipment or vehicles.

  25. 2 similar no-change frames8:00 AM–8:15 AM PT

    No visible change was reported between sampled frames; continuous inactivity cannot be inferred.

    1. Construction camera frame at 8:15 AM PT. The view remains remarkably similar, with no apparent changes to the location of machinery or vehicles.
      8:15 AM PT

      The view remains remarkably similar, with no apparent changes to the location of machinery or vehicles.

    2. Construction camera frame at 8:00 AM PT. The site appears unchanged, with all visible equipment remaining in the same positions as the previous view.
      8:00 AM PT

      The site appears unchanged, with all visible equipment remaining in the same positions as the previous view.

  26. Construction camera frame at 7:45 AM PT. The site presents a consistent view, with all visible equipment holding its previous position.
    7:45 AM PT

    The site presents a consistent view, with all visible equipment holding its previous position.

  27. 4 similar no-change frames6:45 AM–7:30 AM PT

    No visible change was reported between sampled frames; continuous inactivity cannot be inferred.

    1. Construction camera frame at 7:30 AM PT. Equipment positions appear static, with no noticeable movement across the site during this period.
      7:30 AM PT

      Equipment positions appear static, with no noticeable movement across the site during this period.

    2. Construction camera frame at 7:15 AM PT. The site shows no discernible alterations in equipment or layout during this interval.
      7:15 AM PT

      The site shows no discernible alterations in equipment or layout during this interval.

    3. Construction camera frame at 7:00 AM PT. The site maintains a similar appearance, with equipment remaining in the same locations as before.
      7:00 AM PT

      The site maintains a similar appearance, with equipment remaining in the same locations as before.

    4. Construction camera frame at 6:45 AM PT. The scene is stable, with no apparent shifts in equipment placement or activity across the site.
      6:45 AM PT

      The scene is stable, with no apparent shifts in equipment placement or activity across the site.

  28. Construction camera frame at 6:30 AM PT. The arrangement of machinery across the site remains consistent between these views.
    6:30 AM PT

    The arrangement of machinery across the site remains consistent between these views.

  29. 8 similar no-change frames12:00 AM–6:15 AM PT

    No visible change was reported between sampled frames; continuous inactivity cannot be inferred.

    1. Construction camera frame at 6:15 AM PT. The site appears largely unchanged, with the same arrangement of equipment visible across the graded area.
      6:15 AM PT

      The site appears largely unchanged, with the same arrangement of equipment visible across the graded area.

    2. Construction camera frame at 6:00 AM PT. No construction activity — the site is quiet.
      6:00 AM PT

      No construction activity — the site is quiet.

    3. Construction camera frame at 5:00 AM PT. No construction activity — the site is quiet.
      5:00 AM PT

      No construction activity — the site is quiet.

    4. Construction camera frame at 4:00 AM PT. No construction activity — the site is quiet.
      4:00 AM PT

      No construction activity — the site is quiet.

    5. Construction camera frame at 3:00 AM PT. No construction activity — the site is quiet.
      3:00 AM PT

      No construction activity — the site is quiet.

    6. Construction camera frame at 2:00 AM PT. No construction activity — the site is quiet.
      2:00 AM PT

      No construction activity — the site is quiet.

    7. Construction camera frame at 1:00 AM PT. No construction activity — the site is quiet.
      1:00 AM PT

      No construction activity — the site is quiet.

    8. Construction camera frame at 12:00 AM PT. No construction activity — the site is quiet.
      12:00 AM PT

      No construction activity — the site is quiet.

← Aug 27All daysAug 29 →