Skip to content
606Onni 606 · Bellevue
  • Live
  • Progress
  • Project
  • History
  • Search
606

606 (& 620) 106th Ave NE, Bellevue, WA

An independent guide to the Onni 606 development.

For the wider city, visit bellevue.wiki ↗

Project

  • Overview
  • Live cam
  • Latest progress
  • Construction log
  • News
  • Permit ledger
  • Construction impacts
  • The Towers
  • Skyline & height
  • Timeline
  • Gallery

Context

  • History of the block
  • Location
  • Developer

Help

  • Search the site
  • FAQ
  • Glossary
  • Sources & press
  • Contact
  • Updates feed
  • Sitemap

This is an independent, informational fan site. It is not affiliated with, sponsored by, or endorsed by Onni Group. Figures are compiled from public reporting and are approximate and subject to change. Project names and trademarks belong to their respective owners.

© 2026 onni606.com — built by an enthusiast.

  1. Home
  2. /Construction log
  3. /Tuesday, September 1, 2026

Construction log

Tuesday, September 1, 2026

66 snapshots from the live camera.


AI digest

The site was largely quiet, with equipment and vehicles holding position for most of the day; a dump truck entered, an excavator briefly raised its boom, and a small wheeled vehicle shifted to the right side. The frames show no substantial change to the ground or site layout compared with the start of the day.

▶ Play this day as a timelapse
  1. Construction camera frame at 11:00 PM PT. No construction activity — the site is quiet.
    11:00 PM PT

    No construction activity — the site is quiet.

  2. 2 similar no-change frames9:00 PM–10:00 PM PT

    No visible change was reported between sampled frames; continuous inactivity cannot be inferred.

    1. Construction camera frame at 10:00 PM PT. No construction activity — the site is quiet.
      10:00 PM PT

      No construction activity — the site is quiet.

    2. Construction camera frame at 9:00 PM PT. No construction activity — the site is quiet.
      9:00 PM PT

      No construction activity — the site is quiet.

  3. Construction camera frame at 8:00 PM PT. The site remains much as it was, with no apparent repositioning of machines or vehicles.
    8:00 PM PT

    The site remains much as it was, with no apparent repositioning of machines or vehicles.

  4. 2 similar no-change frames7:30 PM–7:45 PM PT

    No visible change was reported between sampled frames; continuous inactivity cannot be inferred.

    1. Construction camera frame at 7:45 PM PT. The site holds a steady appearance, with no discernible changes to equipment placement or vehicle traffic.
      7:45 PM PT

      The site holds a steady appearance, with no discernible changes to equipment placement or vehicle traffic.

    2. Construction camera frame at 7:30 PM PT. The site appears static, with no noticeable movement of machinery or vehicles since the last view.
      7:30 PM PT

      The site appears static, with no noticeable movement of machinery or vehicles since the last view.

  5. Construction camera frame at 7:15 PM PT. The view remains consistent, with all equipment and vehicles holding their previous locations.
    7:15 PM PT

    The view remains consistent, with all equipment and vehicles holding their previous locations.

  6. 3 similar no-change frames6:30 PM–7:00 PM PT

    No visible change was reported between sampled frames; continuous inactivity cannot be inferred.

    1. Construction camera frame at 7:00 PM PT. The site is largely unchanged, with all visible machinery and vehicles maintaining their positions.
      7:00 PM PT

      The site is largely unchanged, with all visible machinery and vehicles maintaining their positions.

    2. Construction camera frame at 6:45 PM PT. The scene shows no alterations, with equipment remaining in the same positions as before.
      6:45 PM PT

      The scene shows no alterations, with equipment remaining in the same positions as before.

    3. Construction camera frame at 6:30 PM PT. The site presents a familiar view, with no observable shifts in the positions of equipment or vehicles.
      6:30 PM PT

      The site presents a familiar view, with no observable shifts in the positions of equipment or vehicles.

  7. Construction camera frame at 6:15 PM PT. The site maintains its current layout, with no apparent relocation of equipment or vehicles in the last fifteen minutes.
    6:15 PM PT

    The site maintains its current layout, with no apparent relocation of equipment or vehicles in the last fifteen minutes.

  8. Construction camera frame at 6:00 PM PT. The scene is holding its configuration, with all machinery and vehicles appearing in the same spots.
    6:00 PM PT

    The scene is holding its configuration, with all machinery and vehicles appearing in the same spots.

  9. Construction camera frame at 5:45 PM PT. The site’s appearance is stable, with no discernible changes in the placement of equipment or vehicles.
    5:45 PM PT

    The site’s appearance is stable, with no discernible changes in the placement of equipment or vehicles.

  10. Construction camera frame at 5:30 PM PT. The site remains consistent, with all visible equipment and vehicles holding steady in their previous positions.
    5:30 PM PT

    The site remains consistent, with all visible equipment and vehicles holding steady in their previous positions.

  11. Construction camera frame at 5:15 PM PT. The overall scene is largely unchanged, with the same arrangement of machinery and no visible movement.
    5:15 PM PT

    The overall scene is largely unchanged, with the same arrangement of machinery and no visible movement.

  12. Construction camera frame at 5:00 PM PT. Everything on site appears to be holding its position, without any clear shifts in equipment or vehicle locations.
    5:00 PM PT

    Everything on site appears to be holding its position, without any clear shifts in equipment or vehicle locations.

  13. 2 similar no-change frames4:30 PM–4:45 PM PT

    No visible change was reported between sampled frames; continuous inactivity cannot be inferred.

    1. Construction camera frame at 4:45 PM PT. The site presents a static view, with equipment remaining in the same positions as before.
      4:45 PM PT

      The site presents a static view, with equipment remaining in the same positions as before.

    2. Construction camera frame at 4:30 PM PT. The site shows no noticeable alterations, with all equipment and vehicles maintaining their prior locations.
      4:30 PM PT

      The site shows no noticeable alterations, with all equipment and vehicles maintaining their prior locations.

  14. Construction camera frame at 4:15 PM PT. The scene remains remarkably still, with no visible adjustments to machinery or vehicle placement.
    4:15 PM PT

    The scene remains remarkably still, with no visible adjustments to machinery or vehicle placement.

  15. 3 similar no-change frames3:30 PM–4:00 PM PT

    No visible change was reported between sampled frames; continuous inactivity cannot be inferred.

    1. Construction camera frame at 4:00 PM PT. No discernible shift in the site's layout or equipment positions is apparent between these views.
      4:00 PM PT

      No discernible shift in the site's layout or equipment positions is apparent between these views.

    2. Construction camera frame at 3:45 PM PT. The site’s appearance is virtually identical to the previous view, with no apparent movement of equipment or vehicles.
      3:45 PM PT

      The site’s appearance is virtually identical to the previous view, with no apparent movement of equipment or vehicles.

    3. Construction camera frame at 3:30 PM PT. The arrangement of equipment across the site remains unchanged from the last check-in.
      3:30 PM PT

      The arrangement of equipment across the site remains unchanged from the last check-in.

  16. Construction camera frame at 3:15 PM PT. The construction site remains consistent, with all visible machinery holding its previous positions.
    3:15 PM PT

    The construction site remains consistent, with all visible machinery holding its previous positions.

  17. 6 similar no-change frames1:45 PM–3:00 PM PT

    No visible change was reported between sampled frames; continuous inactivity cannot be inferred.

    1. Construction camera frame at 3:00 PM PT. The site presents a static view, with all visible equipment and vehicles remaining in the same positions as the prior frame.
      3:00 PM PT

      The site presents a static view, with all visible equipment and vehicles remaining in the same positions as the prior frame.

    2. Construction camera frame at 2:45 PM PT. Everything on site appears to be holding steady, with no changes to equipment or vehicle locations visible in the latest view.
      2:45 PM PT

      Everything on site appears to be holding steady, with no changes to equipment or vehicle locations visible in the latest view.

    3. Construction camera frame at 2:30 PM PT. The scene remains remarkably stable, with no noticeable changes in equipment placement or activity.
      2:30 PM PT

      The scene remains remarkably stable, with no noticeable changes in equipment placement or activity.

    4. Construction camera frame at 2:15 PM PT. The construction site appears quiet, with no discernible shifts in equipment or vehicle positions over the last fifteen minutes.
      2:15 PM PT

      The construction site appears quiet, with no discernible shifts in equipment or vehicle positions over the last fifteen minutes.

    5. Construction camera frame at 2:00 PM PT. The site’s layout is unchanged, with all visible machines and vehicles remaining in the same locations as before.
      2:00 PM PT

      The site’s layout is unchanged, with all visible machines and vehicles remaining in the same locations as before.

    6. Construction camera frame at 1:45 PM PT. The site continues to show no alterations, with all visible machinery remaining stationary.
      1:45 PM PT

      The site continues to show no alterations, with all visible machinery remaining stationary.

  18. Construction camera frame at 1:30 PM PT. The scene is largely consistent, with all visible equipment and vehicles holding their positions from the previous view.
    1:30 PM PT

    The scene is largely consistent, with all visible equipment and vehicles holding their positions from the previous view.

  19. 2 similar no-change frames1:00 PM–1:15 PM PT

    No visible change was reported between sampled frames; continuous inactivity cannot be inferred.

    1. Construction camera frame at 1:15 PM PT. The site remains in a holding pattern, with no visible movement of equipment or vehicles over the last quarter hour.
      1:15 PM PT

      The site remains in a holding pattern, with no visible movement of equipment or vehicles over the last quarter hour.

    2. Construction camera frame at 1:00 PM PT. The site presents a static view, with equipment and vehicles maintaining their previous positions.
      1:00 PM PT

      The site presents a static view, with equipment and vehicles maintaining their previous positions.

  20. Construction camera frame at 12:45 PM PT. The arrangement of equipment across the site hasn’t shifted in the last fifteen minutes.
    12:45 PM PT

    The arrangement of equipment across the site hasn’t shifted in the last fifteen minutes.

  21. 3 similar no-change frames12:00 PM–12:30 PM PT

    No visible change was reported between sampled frames; continuous inactivity cannot be inferred.

    1. Construction camera frame at 12:30 PM PT. Everything on site appears to be holding its place, with no noticeable shifts in equipment or vehicle positions.
      12:30 PM PT

      Everything on site appears to be holding its place, with no noticeable shifts in equipment or vehicle positions.

    2. Construction camera frame at 12:15 PM PT. The scene appears unchanged, with all visible machinery and vehicles remaining in the same spots as before.
      12:15 PM PT

      The scene appears unchanged, with all visible machinery and vehicles remaining in the same spots as before.

    3. Construction camera frame at 12:00 PM PT. No alterations are visible across the site, as all machinery and vehicles remain in the same positions.
      12:00 PM PT

      No alterations are visible across the site, as all machinery and vehicles remain in the same positions.

  22. Construction camera frame at 11:45 AM PT. The view across the site remains consistent, with all equipment and vehicles holding their previous locations.
    11:45 AM PT

    The view across the site remains consistent, with all equipment and vehicles holding their previous locations.

  23. 5 similar no-change frames10:30 AM–11:30 AM PT

    No visible change was reported between sampled frames; continuous inactivity cannot be inferred.

    1. Construction camera frame at 11:30 AM PT. The site remains quiet, with no apparent alterations in the location of equipment or vehicles.
      11:30 AM PT

      The site remains quiet, with no apparent alterations in the location of equipment or vehicles.

    2. Construction camera frame at 11:15 AM PT. The visible arrangement of machinery and vehicles appears stable, with no noticeable movement or changes in position.
      11:15 AM PT

      The visible arrangement of machinery and vehicles appears stable, with no noticeable movement or changes in position.

    3. Construction camera frame at 11:00 AM PT. The site presents a static view, with no discernible shifts in the positioning of equipment or vehicles.
      11:00 AM PT

      The site presents a static view, with no discernible shifts in the positioning of equipment or vehicles.

    4. Construction camera frame at 10:45 AM PT. Everything visible on site maintains its prior arrangement, with no shifts in equipment or vehicle positions.
      10:45 AM PT

      Everything visible on site maintains its prior arrangement, with no shifts in equipment or vehicle positions.

    5. Construction camera frame at 10:30 AM PT. The scene appears unchanged, with all visible machinery and vehicles remaining in the same spots as previously observed.
      10:30 AM PT

      The scene appears unchanged, with all visible machinery and vehicles remaining in the same spots as previously observed.

  24. Construction camera frame at 10:15 AM PT. A small wheeled vehicle has moved from near the center to the right side of the site, positioned alongside other equipment.
    10:15 AM PT

    A small wheeled vehicle has moved from near the center to the right side of the site, positioned alongside other equipment.

  25. Construction camera frame at 10:00 AM PT. The equipment arrangement is consistent between views, showing no changes in positioning.
    10:00 AM PT

    The equipment arrangement is consistent between views, showing no changes in positioning.

  26. Construction camera frame at 9:45 AM PT. The site remains largely as it was, with no apparent repositioning of equipment or vehicles.
    9:45 AM PT

    The site remains largely as it was, with no apparent repositioning of equipment or vehicles.

  27. 4 similar no-change frames8:45 AM–9:30 AM PT

    No visible change was reported between sampled frames; continuous inactivity cannot be inferred.

    1. Construction camera frame at 9:30 AM PT. No significant alterations are visible across the site, with equipment and vehicles appearing in the same locations as before.
      9:30 AM PT

      No significant alterations are visible across the site, with equipment and vehicles appearing in the same locations as before.

    2. Construction camera frame at 9:15 AM PT. The scene is holding steady, with no discernible movement of equipment or vehicles since the last view.
      9:15 AM PT

      The scene is holding steady, with no discernible movement of equipment or vehicles since the last view.

    3. Construction camera frame at 9:00 AM PT. The site presents a static view, with all visible machines and vehicles maintaining their positions from the prior check.
      9:00 AM PT

      The site presents a static view, with all visible machines and vehicles maintaining their positions from the prior check.

    4. Construction camera frame at 8:45 AM PT. The site appears unchanged, with all visible equipment and vehicles remaining in their previous positions.
      8:45 AM PT

      The site appears unchanged, with all visible equipment and vehicles remaining in their previous positions.

  28. Construction camera frame at 8:30 AM PT. A white van is now positioned near the site entrance on the left, having arrived since the previous view. The rest of the site and its equipment remain in the same arrangement.
    8:30 AM PT

    A white van is now positioned near the site entrance on the left, having arrived since the previous view. The rest of the site and its equipment remain in the same arrangement.

  29. Construction camera frame at 8:15 AM PT. The arrangement of equipment and vehicles across the site remains stable, with no visible shifts in position over the last fifteen minutes.
    8:15 AM PT

    The arrangement of equipment and vehicles across the site remains stable, with no visible shifts in position over the last fifteen minutes.

  30. Construction camera frame at 8:00 AM PT. The scene remains largely as it was, with equipment and vehicles holding their positions across the site.
    8:00 AM PT

    The scene remains largely as it was, with equipment and vehicles holding their positions across the site.

  31. Construction camera frame at 7:45 AM PT. The overall scene presents a familiar view, with no significant alterations to equipment placement or vehicle activity apparent in the last fifteen minutes.
    7:45 AM PT

    The overall scene presents a familiar view, with no significant alterations to equipment placement or vehicle activity apparent in the last fifteen minutes.

  32. Construction camera frame at 7:30 AM PT. The equipment arrangement appears consistent with the previous view, though a white vehicle has appeared on the street to the left of the site entrance.
    7:30 AM PT

    The equipment arrangement appears consistent with the previous view, though a white vehicle has appeared on the street to the left of the site entrance.

  33. Construction camera frame at 7:15 AM PT. An excavator near the center of the site has shifted its position slightly, raising its boom. Otherwise, the machinery and vehicles appear to be in the same locations as fifteen minutes ago.
    7:15 AM PT

    An excavator near the center of the site has shifted its position slightly, raising its boom. Otherwise, the machinery and vehicles appear to be in the same locations as fifteen minutes ago.

  34. 11 similar no-change frames12:00 AM–7:00 AM PT

    No visible change was reported between sampled frames; continuous inactivity cannot be inferred.

    1. Construction camera frame at 7:00 AM PT. A large dump truck has entered the site from the driveway on the left and is moving along the graded area. Otherwise, the equipment and scene remain unchanged from fifteen minutes ago.
      7:00 AM PT

      A large dump truck has entered the site from the driveway on the left and is moving along the graded area. Otherwise, the equipment and scene remain unchanged from fifteen minutes ago.

    2. Construction camera frame at 6:45 AM PT. Everything on site appears to be holding its position, with no discernible changes in equipment or vehicle locations.
      6:45 AM PT

      Everything on site appears to be holding its position, with no discernible changes in equipment or vehicle locations.

    3. Construction camera frame at 6:30 AM PT. The scene appears stable, with no visible shifts in the positions of machinery or vehicles over the last fifteen minutes.
      6:30 AM PT

      The scene appears stable, with no visible shifts in the positions of machinery or vehicles over the last fifteen minutes.

    4. Construction camera frame at 6:15 AM PT. The site remains largely as it was fifteen minutes ago, with no apparent movement of equipment or vehicles.
      6:15 AM PT

      The site remains largely as it was fifteen minutes ago, with no apparent movement of equipment or vehicles.

    5. Construction camera frame at 6:00 AM PT. No construction activity — the site is quiet.
      6:00 AM PT

      No construction activity — the site is quiet.

    6. Construction camera frame at 5:00 AM PT. No construction activity — the site is quiet.
      5:00 AM PT

      No construction activity — the site is quiet.

    7. Construction camera frame at 4:00 AM PT. No construction activity — the site is quiet.
      4:00 AM PT

      No construction activity — the site is quiet.

    8. Construction camera frame at 3:00 AM PT. No construction activity — the site is quiet.
      3:00 AM PT

      No construction activity — the site is quiet.

    9. Construction camera frame at 2:00 AM PT. No construction activity — the site is quiet.
      2:00 AM PT

      No construction activity — the site is quiet.

    10. Construction camera frame at 1:00 AM PT. No construction activity — the site is quiet.
      1:00 AM PT

      No construction activity — the site is quiet.

    11. Construction camera frame at 12:00 AM PT. No construction activity — the site is quiet.
      12:00 AM PT

      No construction activity — the site is quiet.

← Aug 31All daysSep 2 →