Skip to content
606Onni 606 · Bellevue
  • Live
  • Progress
  • Project
  • History
  • Search
606

606 (& 620) 106th Ave NE, Bellevue, WA

An independent guide to the Onni 606 development.

For the wider city, visit bellevue.wiki ↗

Project

  • Overview
  • Live cam
  • Latest progress
  • Construction log
  • News
  • Permit ledger
  • Construction impacts
  • The Towers
  • Skyline & height
  • Timeline
  • Gallery

Context

  • History of the block
  • Location
  • Developer

Help

  • Search the site
  • FAQ
  • Glossary
  • Sources & press
  • Contact
  • Updates feed
  • Sitemap

This is an independent, informational fan site. It is not affiliated with, sponsored by, or endorsed by Onni Group. Figures are compiled from public reporting and are approximate and subject to change. Project names and trademarks belong to their respective owners.

© 2026 onni606.com — built by an enthusiast.

  1. Home
  2. /Construction log
  3. /Wednesday, September 2, 2026

Construction log

Wednesday, September 2, 2026

66 snapshots from the live camera.


AI digest

The site was largely quiet, with equipment staying in place and no clear change to the graded area. A red truck and a white van were reported entering during the day; the first and last frames show little visible difference.

▶ Play this day as a timelapse
  1. Construction camera frame at 11:00 PM PT. No construction activity — the site is quiet.
    11:00 PM PT

    No construction activity — the site is quiet.

  2. 3 similar no-change frames8:00 PM–10:00 PM PT

    No visible change was reported between sampled frames; continuous inactivity cannot be inferred.

    1. Construction camera frame at 10:00 PM PT. No construction activity — the site is quiet.
      10:00 PM PT

      No construction activity — the site is quiet.

    2. Construction camera frame at 9:00 PM PT. No construction activity — the site is quiet.
      9:00 PM PT

      No construction activity — the site is quiet.

    3. Construction camera frame at 8:00 PM PT. The scene remains remarkably consistent, with no discernible changes in equipment placement or site conditions.
      8:00 PM PT

      The scene remains remarkably consistent, with no discernible changes in equipment placement or site conditions.

  3. Construction camera frame at 7:45 PM PT. The darker area in the lower section of the site now presents a more uniform tone than it did previously.
    7:45 PM PT

    The darker area in the lower section of the site now presents a more uniform tone than it did previously.

  4. Construction camera frame at 7:30 PM PT. A subtle lightening of the darker patch across the lower portion of the site is now visible.
    7:30 PM PT

    A subtle lightening of the darker patch across the lower portion of the site is now visible.

  5. 2 similar no-change frames7:00 PM–7:15 PM PT

    No visible change was reported between sampled frames; continuous inactivity cannot be inferred.

    1. Construction camera frame at 7:15 PM PT. The site appears largely unchanged, with the same equipment visible in comparable positions.
      7:15 PM PT

      The site appears largely unchanged, with the same equipment visible in comparable positions.

    2. Construction camera frame at 7:00 PM PT. The arrangement of machinery on site appears static, with no visible movement or additions in the last fifteen minutes.
      7:00 PM PT

      The arrangement of machinery on site appears static, with no visible movement or additions in the last fifteen minutes.

  6. Construction camera frame at 6:45 PM PT. The graded area shows a darker patch extending across the lower half of the site compared to the earlier view.
    6:45 PM PT

    The graded area shows a darker patch extending across the lower half of the site compared to the earlier view.

  7. Construction camera frame at 6:30 PM PT. The equipment arrangement appears largely unchanged, though a slight shift in the position of one of the excavators is visible near the center of the site.
    6:30 PM PT

    The equipment arrangement appears largely unchanged, though a slight shift in the position of one of the excavators is visible near the center of the site.

  8. Construction camera frame at 6:15 PM PT. The scene remains remarkably consistent, with equipment and vehicles holding their positions across the site.
    6:15 PM PT

    The scene remains remarkably consistent, with equipment and vehicles holding their positions across the site.

  9. Construction camera frame at 6:00 PM PT. The site presents a largely consistent picture, with no readily apparent shifts in equipment placement.
    6:00 PM PT

    The site presents a largely consistent picture, with no readily apparent shifts in equipment placement.

  10. Construction camera frame at 5:45 PM PT. A small dark object has appeared in the center of the graded area, where none was visible previously.
    5:45 PM PT

    A small dark object has appeared in the center of the graded area, where none was visible previously.

  11. 3 similar no-change frames5:00 PM–5:30 PM PT

    No visible change was reported between sampled frames; continuous inactivity cannot be inferred.

    1. Construction camera frame at 5:30 PM PT. The site’s layout remains unchanged from the previous view, with all equipment holding its place.
      5:30 PM PT

      The site’s layout remains unchanged from the previous view, with all equipment holding its place.

    2. Construction camera frame at 5:15 PM PT. The site appears static, with no noticeable alterations to the positioning of equipment or vehicles.
      5:15 PM PT

      The site appears static, with no noticeable alterations to the positioning of equipment or vehicles.

    3. Construction camera frame at 5:00 PM PT. Everything on site maintains its prior position, showing no discernible movement over the last fifteen minutes.
      5:00 PM PT

      Everything on site maintains its prior position, showing no discernible movement over the last fifteen minutes.

  12. Construction camera frame at 4:45 PM PT. The arrangement of machinery and vehicles on site has not altered in the last fifteen minutes.
    4:45 PM PT

    The arrangement of machinery and vehicles on site has not altered in the last fifteen minutes.

  13. 2 similar no-change frames4:15 PM–4:30 PM PT

    No visible change was reported between sampled frames; continuous inactivity cannot be inferred.

    1. Construction camera frame at 4:30 PM PT. The construction site continues to show a consistent arrangement of equipment and vehicles with no observable changes.
      4:30 PM PT

      The construction site continues to show a consistent arrangement of equipment and vehicles with no observable changes.

    2. Construction camera frame at 4:15 PM PT. The scene remains remarkably consistent, with no apparent shifts in the positions of machinery or vehicles.
      4:15 PM PT

      The scene remains remarkably consistent, with no apparent shifts in the positions of machinery or vehicles.

  14. Construction camera frame at 4:00 PM PT. The site presents a nearly identical picture to the one from fifteen minutes ago.
    4:00 PM PT

    The site presents a nearly identical picture to the one from fifteen minutes ago.

  15. Construction camera frame at 3:45 PM PT. No visible adjustments to the equipment or vehicles have occurred in the last quarter of an hour.
    3:45 PM PT

    No visible adjustments to the equipment or vehicles have occurred in the last quarter of an hour.

  16. 4 similar no-change frames2:45 PM–3:30 PM PT

    No visible change was reported between sampled frames; continuous inactivity cannot be inferred.

    1. Construction camera frame at 3:30 PM PT. The site appears static, with all visible equipment and vehicles holding their positions from the previous view.
      3:30 PM PT

      The site appears static, with all visible equipment and vehicles holding their positions from the previous view.

    2. Construction camera frame at 3:15 PM PT. The view of the site remains largely unchanged in the intervening fifteen minutes.
      3:15 PM PT

      The view of the site remains largely unchanged in the intervening fifteen minutes.

    3. Construction camera frame at 3:00 PM PT. The site shows no discernible changes in equipment placement or vehicle activity over the last fifteen minutes.
      3:00 PM PT

      The site shows no discernible changes in equipment placement or vehicle activity over the last fifteen minutes.

    4. Construction camera frame at 2:45 PM PT. Everything visible on the site remains in the same position as it was fifteen minutes ago.
      2:45 PM PT

      Everything visible on the site remains in the same position as it was fifteen minutes ago.

  17. Construction camera frame at 2:30 PM PT. The scene remains remarkably consistent, with all visible machinery and vehicles maintaining their previous locations.
    2:30 PM PT

    The scene remains remarkably consistent, with all visible machinery and vehicles maintaining their previous locations.

  18. Construction camera frame at 2:15 PM PT. A red and white truck has entered the site via the driveway on the lower left.
    2:15 PM PT

    A red and white truck has entered the site via the driveway on the lower left.

  19. 5 similar no-change frames1:00 PM–2:00 PM PT

    No visible change was reported between sampled frames; continuous inactivity cannot be inferred.

    1. Construction camera frame at 2:00 PM PT. The site presents a consistent picture, with no apparent movement of equipment or vehicles during the last quarter hour.
      2:00 PM PT

      The site presents a consistent picture, with no apparent movement of equipment or vehicles during the last quarter hour.

    2. Construction camera frame at 1:45 PM PT. The arrangement of equipment and vehicles remains static across the site.
      1:45 PM PT

      The arrangement of equipment and vehicles remains static across the site.

    3. Construction camera frame at 1:30 PM PT. The site appears largely unchanged, with equipment and vehicles holding their positions.
      1:30 PM PT

      The site appears largely unchanged, with equipment and vehicles holding their positions.

    4. Construction camera frame at 1:15 PM PT. No visible changes have occurred on the site in the last fifteen minutes.
      1:15 PM PT

      No visible changes have occurred on the site in the last fifteen minutes.

    5. Construction camera frame at 1:00 PM PT. Everything on site appears to be holding its position, showing no changes in equipment or vehicle placement.
      1:00 PM PT

      Everything on site appears to be holding its position, showing no changes in equipment or vehicle placement.

  20. Construction camera frame at 12:45 PM PT. The site’s arrangement is holding steady, with all visible machinery and vehicles remaining in place.
    12:45 PM PT

    The site’s arrangement is holding steady, with all visible machinery and vehicles remaining in place.

  21. Construction camera frame at 12:30 PM PT. The scene remains remarkably consistent, with no discernible shifts in the positions of vehicles or machinery.
    12:30 PM PT

    The scene remains remarkably consistent, with no discernible shifts in the positions of vehicles or machinery.

  22. Construction camera frame at 12:15 PM PT. A white van has entered the site through the driveway on the left and is now positioned near the equipment cluster.
    12:15 PM PT

    A white van has entered the site through the driveway on the left and is now positioned near the equipment cluster.

  23. 5 similar no-change frames11:00 AM–12:00 PM PT

    No visible change was reported between sampled frames; continuous inactivity cannot be inferred.

    1. Construction camera frame at 12:00 PM PT. The site maintains its present arrangement, showing no movement of equipment or vehicles.
      12:00 PM PT

      The site maintains its present arrangement, showing no movement of equipment or vehicles.

    2. Construction camera frame at 11:45 AM PT. The site shows no alterations in equipment or vehicle placement during the last quarter hour.
      11:45 AM PT

      The site shows no alterations in equipment or vehicle placement during the last quarter hour.

    3. Construction camera frame at 11:30 AM PT. The site appears unchanged, with all visible equipment and vehicles holding their previous positions.
      11:30 AM PT

      The site appears unchanged, with all visible equipment and vehicles holding their previous positions.

    4. Construction camera frame at 11:15 AM PT. The site presents a static view, with all visible machinery and vehicles remaining in the same locations.
      11:15 AM PT

      The site presents a static view, with all visible machinery and vehicles remaining in the same locations.

    5. Construction camera frame at 11:00 AM PT. The overall layout of the site remains consistent, with no visible changes to equipment or vehicle positions.
      11:00 AM PT

      The overall layout of the site remains consistent, with no visible changes to equipment or vehicle positions.

  24. Construction camera frame at 10:45 AM PT. No equipment or vehicle positions have shifted in the last fifteen minutes.
    10:45 AM PT

    No equipment or vehicle positions have shifted in the last fifteen minutes.

  25. 12 similar no-change frames7:45 AM–10:30 AM PT

    No visible change was reported between sampled frames; continuous inactivity cannot be inferred.

    1. Construction camera frame at 10:30 AM PT. The scene is quiet, showing no discernible shifts in the placement of equipment or vehicles.
      10:30 AM PT

      The scene is quiet, showing no discernible shifts in the placement of equipment or vehicles.

    2. Construction camera frame at 10:15 AM PT. Everything visible on site maintains its prior positioning, with no apparent movement of equipment or vehicles.
      10:15 AM PT

      Everything visible on site maintains its prior positioning, with no apparent movement of equipment or vehicles.

    3. Construction camera frame at 10:00 AM PT. The site continues to show no alterations in equipment or vehicle placement over the last quarter hour.
      10:00 AM PT

      The site continues to show no alterations in equipment or vehicle placement over the last quarter hour.

    4. Construction camera frame at 9:45 AM PT. The site appears unchanged, with equipment and vehicles holding their positions from the previous view.
      9:45 AM PT

      The site appears unchanged, with equipment and vehicles holding their positions from the previous view.

    5. Construction camera frame at 9:30 AM PT. The site presents a stable view, with all visible machinery and vehicles remaining in the same locations as before.
      9:30 AM PT

      The site presents a stable view, with all visible machinery and vehicles remaining in the same locations as before.

    6. Construction camera frame at 9:15 AM PT. The site's layout remains consistent, with no observable shifts in machinery or vehicle positioning.
      9:15 AM PT

      The site's layout remains consistent, with no observable shifts in machinery or vehicle positioning.

    7. Construction camera frame at 9:00 AM PT. The scene is holding its form, with no visible changes to equipment or vehicle locations over the past fifteen minutes.
      9:00 AM PT

      The scene is holding its form, with no visible changes to equipment or vehicle locations over the past fifteen minutes.

    8. Construction camera frame at 8:45 AM PT. The site remains in a quiet state, with no noticeable movement of machines or vehicles during the last fifteen minutes.
      8:45 AM PT

      The site remains in a quiet state, with no noticeable movement of machines or vehicles during the last fifteen minutes.

    9. Construction camera frame at 8:30 AM PT. The site maintains a steady state, with no discernible shifts in the placement of equipment or vehicles since the last view.
      8:30 AM PT

      The site maintains a steady state, with no discernible shifts in the placement of equipment or vehicles since the last view.

    10. Construction camera frame at 8:15 AM PT. Equipment positions and the overall scene are holding constant, with no visible alterations over the last fifteen minutes.
      8:15 AM PT

      Equipment positions and the overall scene are holding constant, with no visible alterations over the last fifteen minutes.

    11. Construction camera frame at 8:00 AM PT. The scene appears virtually unchanged, with all equipment and vehicles holding their positions from the previous view.
      8:00 AM PT

      The scene appears virtually unchanged, with all equipment and vehicles holding their positions from the previous view.

    12. Construction camera frame at 7:45 AM PT. The scene presents a stable view, with equipment remaining in the same positions as fifteen minutes ago.
      7:45 AM PT

      The scene presents a stable view, with equipment remaining in the same positions as fifteen minutes ago.

  26. Construction camera frame at 7:30 AM PT. The arrangement of machinery and vehicles on site holds steady, showing no apparent repositioning in the last fifteen minutes.
    7:30 AM PT

    The arrangement of machinery and vehicles on site holds steady, showing no apparent repositioning in the last fifteen minutes.

  27. Construction camera frame at 7:15 AM PT. The site's appearance is remarkably consistent, with no detectable changes in the location of equipment or vehicles over the last quarter hour.
    7:15 AM PT

    The site's appearance is remarkably consistent, with no detectable changes in the location of equipment or vehicles over the last quarter hour.

  28. 2 similar no-change frames6:45 AM–7:00 AM PT

    No visible change was reported between sampled frames; continuous inactivity cannot be inferred.

    1. Construction camera frame at 7:00 AM PT. The scene remains quite static, with no observable movement of vehicles or equipment in the last fifteen minutes.
      7:00 AM PT

      The scene remains quite static, with no observable movement of vehicles or equipment in the last fifteen minutes.

    2. Construction camera frame at 6:45 AM PT. A red truck has entered the site via the driveway on the left, and now sits near the equipment cluster. Otherwise, the scene remains stable with no apparent shifts in the positioning of machinery or materials.
      6:45 AM PT

      A red truck has entered the site via the driveway on the left, and now sits near the equipment cluster. Otherwise, the scene remains stable with no apparent shifts in the positioning of machinery or materials.

  29. Construction camera frame at 6:30 AM PT. Visibility remains low, but the arrangement of equipment within the site boundary appears consistent between the two views.
    6:30 AM PT

    Visibility remains low, but the arrangement of equipment within the site boundary appears consistent between the two views.

  30. 8 similar no-change frames12:00 AM–6:15 AM PT

    No visible change was reported between sampled frames; continuous inactivity cannot be inferred.

    1. Construction camera frame at 6:15 AM PT. The site appears largely unchanged, though a few more shapes are visible now within the graded area.
      6:15 AM PT

      The site appears largely unchanged, though a few more shapes are visible now within the graded area.

    2. Construction camera frame at 6:00 AM PT. No construction activity — the site is quiet.
      6:00 AM PT

      No construction activity — the site is quiet.

    3. Construction camera frame at 5:00 AM PT. No construction activity — the site is quiet.
      5:00 AM PT

      No construction activity — the site is quiet.

    4. Construction camera frame at 4:00 AM PT. No construction activity — the site is quiet.
      4:00 AM PT

      No construction activity — the site is quiet.

    5. Construction camera frame at 3:00 AM PT. No construction activity — the site is quiet.
      3:00 AM PT

      No construction activity — the site is quiet.

    6. Construction camera frame at 2:00 AM PT. No construction activity — the site is quiet.
      2:00 AM PT

      No construction activity — the site is quiet.

    7. Construction camera frame at 1:00 AM PT. No construction activity — the site is quiet.
      1:00 AM PT

      No construction activity — the site is quiet.

    8. Construction camera frame at 12:00 AM PT. No construction activity — the site is quiet.
      12:00 AM PT

      No construction activity — the site is quiet.

← Sep 1All daysSep 3 →