Skip to content
606Onni 606 · Bellevue
  • Live
  • Progress
  • Project
  • History
  • Search
606

606 (& 620) 106th Ave NE, Bellevue, WA

An independent guide to the Onni 606 development.

For the wider city, visit bellevue.wiki ↗

Project

  • Overview
  • Live cam
  • Latest progress
  • Construction log
  • News
  • Permit ledger
  • Construction impacts
  • The Towers
  • Skyline & height
  • Timeline
  • Gallery

Context

  • History of the block
  • Location
  • Developer

Help

  • Search the site
  • FAQ
  • Glossary
  • Sources & press
  • Contact
  • Updates feed
  • Sitemap

This is an independent, informational fan site. It is not affiliated with, sponsored by, or endorsed by Onni Group. Figures are compiled from public reporting and are approximate and subject to change. Project names and trademarks belong to their respective owners.

© 2026 onni606.com — built by an enthusiast.

  1. Home
  2. /Construction log
  3. /Friday, September 4, 2026

Construction log

Friday, September 4, 2026

65 snapshots from the live camera.


AI digest

The site was largely quiet, with equipment and the graded area mostly holding steady through the day. A crane appeared near the rear-right and later extended its boom toward the street; several vehicles entered, but no substantial ground change is evident.

▶ Play this day as a timelapse
  1. Construction camera frame at 11:00 PM PT. No construction activity — the site is quiet.
    11:00 PM PT

    No construction activity — the site is quiet.

  2. 4 similar no-change frames7:45 PM–10:00 PM PT

    No visible change was reported between sampled frames; continuous inactivity cannot be inferred.

    1. Construction camera frame at 10:00 PM PT. No construction activity — the site is quiet.
      10:00 PM PT

      No construction activity — the site is quiet.

    2. Construction camera frame at 9:00 PM PT. No construction activity — the site is quiet.
      9:00 PM PT

      No construction activity — the site is quiet.

    3. Construction camera frame at 8:00 PM PT. No construction activity — the site is quiet.
      8:00 PM PT

      No construction activity — the site is quiet.

    4. Construction camera frame at 7:45 PM PT. The scene is largely unchanged, with the arrangement of equipment appearing stable during the interval.
      7:45 PM PT

      The scene is largely unchanged, with the arrangement of equipment appearing stable during the interval.

  3. Construction camera frame at 7:30 PM PT. The site’s arrangement of equipment and open areas shows no noticeable difference from the previous view.
    7:30 PM PT

    The site’s arrangement of equipment and open areas shows no noticeable difference from the previous view.

  4. 3 similar no-change frames6:45 PM–7:15 PM PT

    No visible change was reported between sampled frames; continuous inactivity cannot be inferred.

    1. Construction camera frame at 7:15 PM PT. The view remains consistent, with no discernible shifts in the location of machinery or the site’s overall layout.
      7:15 PM PT

      The view remains consistent, with no discernible shifts in the location of machinery or the site’s overall layout.

    2. Construction camera frame at 7:00 PM PT. The equipment arrangement appears unchanged, with the site holding a static appearance over the last quarter hour.
      7:00 PM PT

      The equipment arrangement appears unchanged, with the site holding a static appearance over the last quarter hour.

    3. Construction camera frame at 6:45 PM PT. The site displays a steady state, with the equipment and graded areas holding their positions.
      6:45 PM PT

      The site displays a steady state, with the equipment and graded areas holding their positions.

  5. Construction camera frame at 6:30 PM PT. The site maintains its current appearance, with no visible repositioning of the heavy equipment or alterations to the graded areas.
    6:30 PM PT

    The site maintains its current appearance, with no visible repositioning of the heavy equipment or alterations to the graded areas.

  6. Construction camera frame at 6:15 PM PT. The site appears quiet, with no readily apparent changes to the positions of the machines or the graded areas.
    6:15 PM PT

    The site appears quiet, with no readily apparent changes to the positions of the machines or the graded areas.

  7. 7 similar no-change frames4:30 PM–6:00 PM PT

    No visible change was reported between sampled frames; continuous inactivity cannot be inferred.

    1. Construction camera frame at 6:00 PM PT. The scene presents a continuation of the prior view, with no apparent alterations to the equipment or the graded site.
      6:00 PM PT

      The scene presents a continuation of the prior view, with no apparent alterations to the equipment or the graded site.

    2. Construction camera frame at 5:45 PM PT. The scene remains largely as it was, with no noticeable movement of equipment or materials in the last fifteen minutes.
      5:45 PM PT

      The scene remains largely as it was, with no noticeable movement of equipment or materials in the last fifteen minutes.

    3. Construction camera frame at 5:30 PM PT. The site remains remarkably consistent, showing no discernible shifts in the positions of the machines or the graded earth.
      5:30 PM PT

      The site remains remarkably consistent, showing no discernible shifts in the positions of the machines or the graded earth.

    4. Construction camera frame at 5:15 PM PT. The arrangement of machinery on site remains largely unchanged from the previous view.
      5:15 PM PT

      The arrangement of machinery on site remains largely unchanged from the previous view.

    5. Construction camera frame at 5:00 PM PT. No significant shifts are visible, as the equipment and graded areas maintain their previous arrangements.
      5:00 PM PT

      No significant shifts are visible, as the equipment and graded areas maintain their previous arrangements.

    6. Construction camera frame at 4:45 PM PT. The view from above shows a largely static scene, with the equipment and grading appearing as they did moments ago.
      4:45 PM PT

      The view from above shows a largely static scene, with the equipment and grading appearing as they did moments ago.

    7. Construction camera frame at 4:30 PM PT. The site appears quiet, with no visible changes in equipment placement or activity over the last quarter hour.
      4:30 PM PT

      The site appears quiet, with no visible changes in equipment placement or activity over the last quarter hour.

  8. Construction camera frame at 4:15 PM PT. The site presents a stable view, with no readily apparent alterations in the positions of equipment or vehicles.
    4:15 PM PT

    The site presents a stable view, with no readily apparent alterations in the positions of equipment or vehicles.

  9. Construction camera frame at 4:00 PM PT. The scene is holding steady, with no apparent movement of equipment or vehicles since the last view.
    4:00 PM PT

    The scene is holding steady, with no apparent movement of equipment or vehicles since the last view.

  10. Construction camera frame at 3:45 PM PT. A small, dark-colored vehicle has moved slightly within the central graded area of the site. Otherwise, the scene remains consistent, with all other equipment and vehicles holding their previous positions.
    3:45 PM PT

    A small, dark-colored vehicle has moved slightly within the central graded area of the site. Otherwise, the scene remains consistent, with all other equipment and vehicles holding their previous positions.

  11. 6 similar no-change frames2:15 PM–3:30 PM PT

    No visible change was reported between sampled frames; continuous inactivity cannot be inferred.

    1. Construction camera frame at 3:30 PM PT. The site remains largely unchanged, with equipment appearing in the same positions as before.
      3:30 PM PT

      The site remains largely unchanged, with equipment appearing in the same positions as before.

    2. Construction camera frame at 3:15 PM PT. The construction site maintains a consistent appearance, with no noticeable shifts in the placement of machinery or vehicles.
      3:15 PM PT

      The construction site maintains a consistent appearance, with no noticeable shifts in the placement of machinery or vehicles.

    3. Construction camera frame at 3:00 PM PT. Equipment remains in largely the same positions, with no discernible movement over the last fifteen minutes.
      3:00 PM PT

      Equipment remains in largely the same positions, with no discernible movement over the last fifteen minutes.

    4. Construction camera frame at 2:45 PM PT. The site appears much the same as it did fifteen minutes ago, with no visible changes in equipment or vehicle positioning.
      2:45 PM PT

      The site appears much the same as it did fifteen minutes ago, with no visible changes in equipment or vehicle positioning.

    5. Construction camera frame at 2:30 PM PT. The site presents a static view, with all machinery and vehicles remaining in the same positions as fifteen minutes ago.
      2:30 PM PT

      The site presents a static view, with all machinery and vehicles remaining in the same positions as fifteen minutes ago.

    6. Construction camera frame at 2:15 PM PT. The scene shows no alterations in equipment or vehicle locations during the past fifteen minutes.
      2:15 PM PT

      The scene shows no alterations in equipment or vehicle locations during the past fifteen minutes.

  12. Construction camera frame at 2:00 PM PT. Activity on site is minimal, as the equipment positions appear identical to those from fifteen minutes ago.
    2:00 PM PT

    Activity on site is minimal, as the equipment positions appear identical to those from fifteen minutes ago.

  13. 6 similar no-change frames12:30 PM–1:45 PM PT

    No visible change was reported between sampled frames; continuous inactivity cannot be inferred.

    1. Construction camera frame at 1:45 PM PT. The scene remains remarkably still, with no apparent movement of equipment or vehicles in the last fifteen minutes.
      1:45 PM PT

      The scene remains remarkably still, with no apparent movement of equipment or vehicles in the last fifteen minutes.

    2. Construction camera frame at 1:30 PM PT. The site maintains a consistent appearance, showing no noticeable shifts in equipment placement or activity within the last fifteen minutes.
      1:30 PM PT

      The site maintains a consistent appearance, showing no noticeable shifts in equipment placement or activity within the last fifteen minutes.

    3. Construction camera frame at 1:15 PM PT. The arrangement of equipment and vehicles across the site remains unchanged over the last fifteen minutes.
      1:15 PM PT

      The arrangement of equipment and vehicles across the site remains unchanged over the last fifteen minutes.

    4. Construction camera frame at 1:00 PM PT. The layout of machinery across the site appears consistent, with no discernible movement in the last quarter hour.
      1:00 PM PT

      The layout of machinery across the site appears consistent, with no discernible movement in the last quarter hour.

    5. Construction camera frame at 12:45 PM PT. The site presents a static view, with all equipment and vehicles maintaining their positions from fifteen minutes ago.
      12:45 PM PT

      The site presents a static view, with all equipment and vehicles maintaining their positions from fifteen minutes ago.

    6. Construction camera frame at 12:30 PM PT. The site holds its form, with no observable alterations in the placement of equipment or vehicles during the last fifteen minutes.
      12:30 PM PT

      The site holds its form, with no observable alterations in the placement of equipment or vehicles during the last fifteen minutes.

  14. Construction camera frame at 12:15 PM PT. The shadow from the buildings now stretches further across the central area of the site, but everything else appears to be in the same position as before.
    12:15 PM PT

    The shadow from the buildings now stretches further across the central area of the site, but everything else appears to be in the same position as before.

  15. Construction camera frame at 12:00 PM PT. The scene remains largely the same, though the light has shifted and softened across the block.
    12:00 PM PT

    The scene remains largely the same, though the light has shifted and softened across the block.

  16. Construction camera frame at 11:45 AM PT. A white van has entered the site through the driveway on the left, and now sits near the red portable office. Otherwise, the layout of equipment and material across the block remains as it was fifteen minutes ago.
    11:45 AM PT

    A white van has entered the site through the driveway on the left, and now sits near the red portable office. Otherwise, the layout of equipment and material across the block remains as it was fifteen minutes ago.

  17. Construction camera frame at 11:30 AM PT. The large shadow cast across the site has shifted slightly, but the positions of equipment and vehicles appear unchanged.
    11:30 AM PT

    The large shadow cast across the site has shifted slightly, but the positions of equipment and vehicles appear unchanged.

  18. 2 similar no-change frames11:00 AM–11:15 AM PT

    No visible change was reported between sampled frames; continuous inactivity cannot be inferred.

    1. Construction camera frame at 11:15 AM PT. The arrangement of machines and vehicles on the site holds steady, with no noticeable movement in the last fifteen minutes.
      11:15 AM PT

      The arrangement of machines and vehicles on the site holds steady, with no noticeable movement in the last fifteen minutes.

    2. Construction camera frame at 11:00 AM PT. The site appears quiet, with no discernible shifts in equipment or vehicle placement over the last quarter hour.
      11:00 AM PT

      The site appears quiet, with no discernible shifts in equipment or vehicle placement over the last quarter hour.

  19. Construction camera frame at 10:45 AM PT. Shadows have lengthened across the site, but the arrangement of equipment and vehicles remains consistent with the previous view.
    10:45 AM PT

    Shadows have lengthened across the site, but the arrangement of equipment and vehicles remains consistent with the previous view.

  20. Construction camera frame at 10:30 AM PT. Several vehicles have entered the site via the driveway on the left side of the frame since the last view. Otherwise, the arrangement of equipment across the block appears consistent.
    10:30 AM PT

    Several vehicles have entered the site via the driveway on the left side of the frame since the last view. Otherwise, the arrangement of equipment across the block appears consistent.

  21. Construction camera frame at 10:15 AM PT. The site presents a largely unchanged view, with equipment and vehicles maintaining their positions over the last fifteen minutes.
    10:15 AM PT

    The site presents a largely unchanged view, with equipment and vehicles maintaining their positions over the last fifteen minutes.

  22. Construction camera frame at 10:00 AM PT. The scene is remarkably stable, with equipment and vehicles appearing in the same locations as they were moments ago.
    10:00 AM PT

    The scene is remarkably stable, with equipment and vehicles appearing in the same locations as they were moments ago.

  23. Construction camera frame at 9:45 AM PT. A large orange crane has extended its boom toward the street on the upper right of the frame since the last view. Otherwise, the scene remains much as it was fifteen minutes ago, with machines and vehicles in largely the same positions.
    9:45 AM PT

    A large orange crane has extended its boom toward the street on the upper right of the frame since the last view. Otherwise, the scene remains much as it was fifteen minutes ago, with machines and vehicles in largely the same positions.

  24. Construction camera frame at 9:30 AM PT. Activity on the site remains minimal, as the positions of machines and vehicles are consistent with the last check-in.
    9:30 AM PT

    Activity on the site remains minimal, as the positions of machines and vehicles are consistent with the last check-in.

  25. 3 similar no-change frames8:45 AM–9:15 AM PT

    No visible change was reported between sampled frames; continuous inactivity cannot be inferred.

    1. Construction camera frame at 9:15 AM PT. The site looks largely static, with equipment and vehicles holding their positions from the earlier view.
      9:15 AM PT

      The site looks largely static, with equipment and vehicles holding their positions from the earlier view.

    2. Construction camera frame at 9:00 AM PT. The site appears quiet, with no noticeable movement of equipment or vehicles in the last quarter of an hour.
      9:00 AM PT

      The site appears quiet, with no noticeable movement of equipment or vehicles in the last quarter of an hour.

    3. Construction camera frame at 8:45 AM PT. The site shows no obvious alterations, with all equipment and vehicles remaining in the same positions as before.
      8:45 AM PT

      The site shows no obvious alterations, with all equipment and vehicles remaining in the same positions as before.

  26. Construction camera frame at 8:30 AM PT. The arrangement of machinery and vehicles across the site remains consistent between these views.
    8:30 AM PT

    The arrangement of machinery and vehicles across the site remains consistent between these views.

  27. 2 similar no-change frames8:00 AM–8:15 AM PT

    No visible change was reported between sampled frames; continuous inactivity cannot be inferred.

    1. Construction camera frame at 8:15 AM PT. The site maintains a largely unchanged appearance, with equipment holding its positions from the previous view.
      8:15 AM PT

      The site maintains a largely unchanged appearance, with equipment holding its positions from the previous view.

    2. Construction camera frame at 8:00 AM PT. The scene presents a consistent picture, with equipment remaining in the same locations as observed moments ago.
      8:00 AM PT

      The scene presents a consistent picture, with equipment remaining in the same locations as observed moments ago.

  28. Construction camera frame at 7:45 AM PT. Activity on site appears minimal, as the arrangement of equipment and vehicles has not altered in the intervening minutes.
    7:45 AM PT

    Activity on site appears minimal, as the arrangement of equipment and vehicles has not altered in the intervening minutes.

  29. Construction camera frame at 7:30 AM PT. The scene remains remarkably still, with no discernible shifts in equipment placement or vehicle activity over the last fifteen minutes.
    7:30 AM PT

    The scene remains remarkably still, with no discernible shifts in equipment placement or vehicle activity over the last fifteen minutes.

  30. Construction camera frame at 7:15 AM PT. A tall, orange crane is now visible rising near the rear right corner of the site. Otherwise, the equipment positions and overall scene appear to be stable.
    7:15 AM PT

    A tall, orange crane is now visible rising near the rear right corner of the site. Otherwise, the equipment positions and overall scene appear to be stable.

  31. Construction camera frame at 7:00 AM PT. A white pickup truck has entered the site via the driveway on the left. The rest of the scene, including the arrangement of equipment, appears to be holding steady.
    7:00 AM PT

    A white pickup truck has entered the site via the driveway on the left. The rest of the scene, including the arrangement of equipment, appears to be holding steady.

  32. Construction camera frame at 6:45 AM PT. The red portable toilet has moved slightly further into the site from the street edge. Otherwise, the arrangement of equipment and the overall scene remain consistent between the two views.
    6:45 AM PT

    The red portable toilet has moved slightly further into the site from the street edge. Otherwise, the arrangement of equipment and the overall scene remain consistent between the two views.

  33. 8 similar no-change frames12:00 AM–6:30 AM PT

    No visible change was reported between sampled frames; continuous inactivity cannot be inferred.

    1. Construction camera frame at 6:30 AM PT. The site is now visible in daylight, revealing several pieces of heavy equipment positioned across the graded area. Conditions are quiet, with the scene appearing largely unchanged from the previous view.
      6:30 AM PT

      The site is now visible in daylight, revealing several pieces of heavy equipment positioned across the graded area. Conditions are quiet, with the scene appearing largely unchanged from the previous view.

    2. Construction camera frame at 6:00 AM PT. No construction activity — the site is quiet.
      6:00 AM PT

      No construction activity — the site is quiet.

    3. Construction camera frame at 5:00 AM PT. No construction activity — the site is quiet.
      5:00 AM PT

      No construction activity — the site is quiet.

    4. Construction camera frame at 4:00 AM PT. No construction activity — the site is quiet.
      4:00 AM PT

      No construction activity — the site is quiet.

    5. Construction camera frame at 3:00 AM PT. No construction activity — the site is quiet.
      3:00 AM PT

      No construction activity — the site is quiet.

    6. Construction camera frame at 2:00 AM PT. No construction activity — the site is quiet.
      2:00 AM PT

      No construction activity — the site is quiet.

    7. Construction camera frame at 1:00 AM PT. No construction activity — the site is quiet.
      1:00 AM PT

      No construction activity — the site is quiet.

    8. Construction camera frame at 12:00 AM PT. No construction activity — the site is quiet.
      12:00 AM PT

      No construction activity — the site is quiet.

← Sep 3All daysSep 5 →