606 (& 620) 106th Ave NE, Bellevue, WA

An independent guide to the Onni 606 development.

For the wider city, visit bellevue.wiki ↗

Project

  • Overview
  • Live cam
  • Latest progress
  • Construction log
  • News
  • Permit ledger
  • Construction impacts
  • The Towers
  • Skyline & height
  • Timeline
  • Gallery

Context

  • History of the block
  • Location
  • Developer

Help

  • Search the site
  • FAQ
  • Glossary
  • Sources & press
  • Contact
  • Updates feed
  • Sitemap

This is an independent, informational fan site. It is not affiliated with, sponsored by, or endorsed by Onni Group. Figures are compiled from public reporting and are approximate and subject to change. Project names and trademarks belong to their respective owners.

© 2026 onni606.com — built by an enthusiast.

  1. Home
  2. /Construction log
  3. /Saturday, September 5, 2026

Construction log

Saturday, September 5, 2026

65 snapshots from the live camera.


AI digest

The site was largely quiet, with the heavy equipment mostly holding position; a small red vehicle and a white pickup entered from the left and parked near the yellow machinery. Between the first and last frames, no substantial change to the ground or equipment layout is apparent.

▶ Play this day as a timelapse
  1. Construction camera frame at 11:00 PM PT. No construction activity — the site is quiet.
    11:00 PM PT

    No construction activity — the site is quiet.

  2. 3 similar no-change frames8:00 PM–10:00 PM PT

    No visible change was reported between sampled frames; continuous inactivity cannot be inferred.

    1. Construction camera frame at 10:00 PM PT. No construction activity — the site is quiet.
      10:00 PM PT

      No construction activity — the site is quiet.

    2. Construction camera frame at 9:00 PM PT. No construction activity — the site is quiet.
      9:00 PM PT

      No construction activity — the site is quiet.

    3. Construction camera frame at 8:00 PM PT. No construction activity — the site is quiet.
      8:00 PM PT

      No construction activity — the site is quiet.

  3. Construction camera frame at 7:45 PM PT. The site continues in a holding pattern, with no noticeable repositioning of equipment or vehicles since the last view.
    7:45 PM PT

    The site continues in a holding pattern, with no noticeable repositioning of equipment or vehicles since the last view.

  4. Construction camera frame at 7:30 PM PT. The site appears largely unchanged, with equipment maintaining its previous arrangement.
    7:30 PM PT

    The site appears largely unchanged, with equipment maintaining its previous arrangement.

  5. Construction camera frame at 7:15 PM PT. The site’s configuration has not altered noticeably in the last fifteen minutes, with all equipment appearing in the same positions.
    7:15 PM PT

    The site’s configuration has not altered noticeably in the last fifteen minutes, with all equipment appearing in the same positions.

  6. Construction camera frame at 7:00 PM PT. The scene presents a stable picture, with all visible machinery holding its position from the last check-in.
    7:00 PM PT

    The scene presents a stable picture, with all visible machinery holding its position from the last check-in.

  7. 2 similar no-change frames6:30 PM–6:45 PM PT

    No visible change was reported between sampled frames; continuous inactivity cannot be inferred.

    1. Construction camera frame at 6:45 PM PT. The overall scene is holding steady, with no visible shifts in equipment placement over the last fifteen minutes.
      6:45 PM PT

      The overall scene is holding steady, with no visible shifts in equipment placement over the last fifteen minutes.

    2. Construction camera frame at 6:30 PM PT. The site remains quiet, with no apparent movement of equipment or vehicles in the last quarter hour.
      6:30 PM PT

      The site remains quiet, with no apparent movement of equipment or vehicles in the last quarter hour.

  8. Construction camera frame at 6:15 PM PT. Activity on the site is minimal, though one of the yellow machines near the center has subtly shifted its orientation.
    6:15 PM PT

    Activity on the site is minimal, though one of the yellow machines near the center has subtly shifted its orientation.

  9. Construction camera frame at 6:00 PM PT. A small white vehicle has entered the site via the driveway on the left side of the frame and is now positioned near the group of yellow machinery.
    6:00 PM PT

    A small white vehicle has entered the site via the driveway on the left side of the frame and is now positioned near the group of yellow machinery.

  10. 2 similar no-change frames5:30 PM–5:45 PM PT

    No visible change was reported between sampled frames; continuous inactivity cannot be inferred.

    1. Construction camera frame at 5:45 PM PT. The site’s appearance is consistent, with all visible equipment remaining in the same locations as fifteen minutes ago.
      5:45 PM PT

      The site’s appearance is consistent, with all visible equipment remaining in the same locations as fifteen minutes ago.

    2. Construction camera frame at 5:30 PM PT. The site appears unchanged, with all visible equipment remaining in the same positions as before.
      5:30 PM PT

      The site appears unchanged, with all visible equipment remaining in the same positions as before.

  11. Construction camera frame at 5:15 PM PT. The scene is remarkably stable, with equipment appearing to stay put during the last fifteen minutes.
    5:15 PM PT

    The scene is remarkably stable, with equipment appearing to stay put during the last fifteen minutes.

  12. Construction camera frame at 5:00 PM PT. The site holds steady, with all visible machinery maintaining its previous location.
    5:00 PM PT

    The site holds steady, with all visible machinery maintaining its previous location.

  13. Construction camera frame at 4:45 PM PT. The scene remains largely as it was, with no apparent repositioning of machinery or materials.
    4:45 PM PT

    The scene remains largely as it was, with no apparent repositioning of machinery or materials.

  14. 5 similar no-change frames3:30 PM–4:30 PM PT

    No visible change was reported between sampled frames; continuous inactivity cannot be inferred.

    1. Construction camera frame at 4:30 PM PT. The site presents a consistent view, with no noticeable movement of equipment or materials in the intervening minutes.
      4:30 PM PT

      The site presents a consistent view, with no noticeable movement of equipment or materials in the intervening minutes.

    2. Construction camera frame at 4:15 PM PT. The site remains quiet, with no visible shifts in equipment positioning over the last quarter hour.
      4:15 PM PT

      The site remains quiet, with no visible shifts in equipment positioning over the last quarter hour.

    3. Construction camera frame at 4:00 PM PT. No alterations to the scene are apparent in the latest view of the site.
      4:00 PM PT

      No alterations to the scene are apparent in the latest view of the site.

    4. Construction camera frame at 3:45 PM PT. The site appears unchanged, with all visible equipment remaining in the same positions.
      3:45 PM PT

      The site appears unchanged, with all visible equipment remaining in the same positions.

    5. Construction camera frame at 3:30 PM PT. The view of the site is essentially static, with no discernible changes to equipment or materials in the last fifteen minutes.
      3:30 PM PT

      The view of the site is essentially static, with no discernible changes to equipment or materials in the last fifteen minutes.

  15. Construction camera frame at 3:15 PM PT. Everything on site appears to be in the same location as it was fifteen minutes ago.
    3:15 PM PT

    Everything on site appears to be in the same location as it was fifteen minutes ago.

  16. 2 similar no-change frames2:45 PM–3:00 PM PT

    No visible change was reported between sampled frames; continuous inactivity cannot be inferred.

    1. Construction camera frame at 3:00 PM PT. The arrangement of machinery on site appears unchanged over the last fifteen minutes.
      3:00 PM PT

      The arrangement of machinery on site appears unchanged over the last fifteen minutes.

    2. Construction camera frame at 2:45 PM PT. The scene is holding steady, with equipment and materials remaining in the same positions as before.
      2:45 PM PT

      The scene is holding steady, with equipment and materials remaining in the same positions as before.

  17. Construction camera frame at 2:30 PM PT. The scene remains remarkably consistent, showing no obvious shifts in the positioning of equipment or materials.
    2:30 PM PT

    The scene remains remarkably consistent, showing no obvious shifts in the positioning of equipment or materials.

  18. Construction camera frame at 2:15 PM PT. The site maintains a consistent appearance, with no apparent movement of vehicles or machinery in the last quarter of an hour.
    2:15 PM PT

    The site maintains a consistent appearance, with no apparent movement of vehicles or machinery in the last quarter of an hour.

  19. Construction camera frame at 2:00 PM PT. A white pickup truck has entered the site via the driveway on the left and is now parked among the yellow machinery.
    2:00 PM PT

    A white pickup truck has entered the site via the driveway on the left and is now parked among the yellow machinery.

  20. Construction camera frame at 1:45 PM PT. The site shows no noticeable changes in the arrangement of equipment or materials since the last view.
    1:45 PM PT

    The site shows no noticeable changes in the arrangement of equipment or materials since the last view.

  21. Construction camera frame at 1:30 PM PT. The site appears largely as it was, with no readily visible alterations in equipment placement.
    1:30 PM PT

    The site appears largely as it was, with no readily visible alterations in equipment placement.

  22. 4 similar no-change frames12:30 PM–1:15 PM PT

    No visible change was reported between sampled frames; continuous inactivity cannot be inferred.

    1. Construction camera frame at 1:15 PM PT. The site displays a largely static appearance, with no discernible shifts in the location of equipment or materials.
      1:15 PM PT

      The site displays a largely static appearance, with no discernible shifts in the location of equipment or materials.

    2. Construction camera frame at 1:00 PM PT. The overall arrangement of the site remains unchanged, with equipment and materials holding their positions.
      1:00 PM PT

      The overall arrangement of the site remains unchanged, with equipment and materials holding their positions.

    3. Construction camera frame at 12:45 PM PT. The scene presents a stable view, with all visible machinery and materials remaining in the same positions as before.
      12:45 PM PT

      The scene presents a stable view, with all visible machinery and materials remaining in the same positions as before.

    4. Construction camera frame at 12:30 PM PT. Everything on site maintains its prior positioning, with no apparent movement of equipment or materials.
      12:30 PM PT

      Everything on site maintains its prior positioning, with no apparent movement of equipment or materials.

  23. Construction camera frame at 12:15 PM PT. A small piece of equipment has moved within the central area of the site.
    12:15 PM PT

    A small piece of equipment has moved within the central area of the site.

  24. Construction camera frame at 12:00 PM PT. The site remains consistent, with no noticeable adjustments to the placement of equipment or materials.
    12:00 PM PT

    The site remains consistent, with no noticeable adjustments to the placement of equipment or materials.

  25. Construction camera frame at 11:45 AM PT. The site appears much the same, with all visible machinery and materials maintaining their previous locations.
    11:45 AM PT

    The site appears much the same, with all visible machinery and materials maintaining their previous locations.

  26. Construction camera frame at 11:30 AM PT. The red equipment near the left edge of the frame has shifted position slightly.
    11:30 AM PT

    The red equipment near the left edge of the frame has shifted position slightly.

  27. Construction camera frame at 11:15 AM PT. The arrangement of equipment and materials across the site holds steady, though sunlight now casts a different pattern of shadows.
    11:15 AM PT

    The arrangement of equipment and materials across the site holds steady, though sunlight now casts a different pattern of shadows.

  28. 4 similar no-change frames10:15 AM–11:00 AM PT

    No visible change was reported between sampled frames; continuous inactivity cannot be inferred.

    1. Construction camera frame at 11:00 AM PT. The site presents a static view, with all visible equipment remaining in the same positions as before.
      11:00 AM PT

      The site presents a static view, with all visible equipment remaining in the same positions as before.

    2. Construction camera frame at 10:45 AM PT. The site’s appearance is stable, with no visible alterations to equipment or material placement.
      10:45 AM PT

      The site’s appearance is stable, with no visible alterations to equipment or material placement.

    3. Construction camera frame at 10:30 AM PT. The scene remains largely unchanged, with equipment and materials holding their positions across the site.
      10:30 AM PT

      The scene remains largely unchanged, with equipment and materials holding their positions across the site.

    4. Construction camera frame at 10:15 AM PT. No significant changes are apparent, as the arrangement of machinery and materials remains the same as in the prior view.
      10:15 AM PT

      No significant changes are apparent, as the arrangement of machinery and materials remains the same as in the prior view.

  29. Construction camera frame at 10:00 AM PT. Everything visible on site appears to be in the same location as it was fifteen minutes ago.
    10:00 AM PT

    Everything visible on site appears to be in the same location as it was fifteen minutes ago.

  30. Construction camera frame at 9:45 AM PT. The overall layout of the site remains consistent, though shadows have shifted slightly with the sun's movement.
    9:45 AM PT

    The overall layout of the site remains consistent, though shadows have shifted slightly with the sun's movement.

  31. 2 similar no-change frames9:15 AM–9:30 AM PT

    No visible change was reported between sampled frames; continuous inactivity cannot be inferred.

    1. Construction camera frame at 9:30 AM PT. Equipment across the site appears to be holding its positions, with no noticeable movement in the last quarter of an hour.
      9:30 AM PT

      Equipment across the site appears to be holding its positions, with no noticeable movement in the last quarter of an hour.

    2. Construction camera frame at 9:15 AM PT. The site presents a nearly identical view, with no discernible shifts in equipment or vehicle positions.
      9:15 AM PT

      The site presents a nearly identical view, with no discernible shifts in equipment or vehicle positions.

  32. Construction camera frame at 9:00 AM PT. The red vehicle near the left side of the frame has moved a short distance further into the site.
    9:00 AM PT

    The red vehicle near the left side of the frame has moved a short distance further into the site.

  33. 17 similar no-change frames12:00 AM–8:45 AM PT

    No visible change was reported between sampled frames; continuous inactivity cannot be inferred.

    1. Construction camera frame at 8:45 AM PT. The scene is remarkably unchanged, with all visible equipment holding its place from the previous view.
      8:45 AM PT

      The scene is remarkably unchanged, with all visible equipment holding its place from the previous view.

    2. Construction camera frame at 8:30 AM PT. The site remains largely static, though the red vehicle near the left edge has shifted slightly further into the block.
      8:30 AM PT

      The site remains largely static, though the red vehicle near the left edge has shifted slightly further into the block.

    3. Construction camera frame at 8:15 AM PT. No alterations to the equipment layout are apparent in the latest view.
      8:15 AM PT

      No alterations to the equipment layout are apparent in the latest view.

    4. Construction camera frame at 8:00 AM PT. The arrangement of machinery across the site remains consistent, with no visible changes in position over the past fifteen minutes.
      8:00 AM PT

      The arrangement of machinery across the site remains consistent, with no visible changes in position over the past fifteen minutes.

    5. Construction camera frame at 7:45 AM PT. Everything on site appears to be holding its position, with no noticeable alterations in the last fifteen minutes.
      7:45 AM PT

      Everything on site appears to be holding its position, with no noticeable alterations in the last fifteen minutes.

    6. Construction camera frame at 7:30 AM PT. The site appears quiet, with no discernible shifts in equipment placement over the last quarter hour.
      7:30 AM PT

      The site appears quiet, with no discernible shifts in equipment placement over the last quarter hour.

    7. Construction camera frame at 7:15 AM PT. The site presents a consistent view, with all equipment remaining in the same positions as before.
      7:15 AM PT

      The site presents a consistent view, with all equipment remaining in the same positions as before.

    8. Construction camera frame at 7:00 AM PT. The equipment arrangement appears unchanged, though a small, red vehicle has entered the site from the driveway on the left.
      7:00 AM PT

      The equipment arrangement appears unchanged, though a small, red vehicle has entered the site from the driveway on the left.

    9. Construction camera frame at 6:45 AM PT. The scene remains largely static, with equipment positioned as it was fifteen minutes ago.
      6:45 AM PT

      The scene remains largely static, with equipment positioned as it was fifteen minutes ago.

    10. Construction camera frame at 6:30 AM PT. Daylight reveals a collection of heavy equipment centered on the site, with no apparent movement between the last check-in and now.
      6:30 AM PT

      Daylight reveals a collection of heavy equipment centered on the site, with no apparent movement between the last check-in and now.

    11. Construction camera frame at 6:00 AM PT. No construction activity — the site is quiet.
      6:00 AM PT

      No construction activity — the site is quiet.

    12. Construction camera frame at 5:00 AM PT. No construction activity — the site is quiet.
      5:00 AM PT

      No construction activity — the site is quiet.

    13. Construction camera frame at 4:00 AM PT. No construction activity — the site is quiet.
      4:00 AM PT

      No construction activity — the site is quiet.

    14. Construction camera frame at 3:00 AM PT. No construction activity — the site is quiet.
      3:00 AM PT

      No construction activity — the site is quiet.

    15. Construction camera frame at 2:00 AM PT. No construction activity — the site is quiet.
      2:00 AM PT

      No construction activity — the site is quiet.

    16. Construction camera frame at 1:00 AM PT. No construction activity — the site is quiet.
      1:00 AM PT

      No construction activity — the site is quiet.

    17. Construction camera frame at 12:00 AM PT. No construction activity — the site is quiet.
      12:00 AM PT

      No construction activity — the site is quiet.

← Sep 4All daysSep 6 →