606 (& 620) 106th Ave NE, Bellevue, WA

An independent guide to the Onni 606 development.

For the wider city, visit bellevue.wiki ↗

Project

  • Overview
  • Live cam
  • Latest progress
  • Construction log
  • News
  • Permit ledger
  • Construction impacts
  • The Towers
  • Skyline & height
  • Timeline
  • Gallery

Context

  • History of the block
  • Location
  • Developer

Help

  • Search the site
  • FAQ
  • Glossary
  • Sources & press
  • Contact
  • Updates feed
  • Sitemap

This is an independent, informational fan site. It is not affiliated with, sponsored by, or endorsed by Onni Group. Figures are compiled from public reporting and are approximate and subject to change. Project names and trademarks belong to their respective owners.

© 2026 onni606.com — built by an enthusiast.

  1. Home
  2. /Construction log
  3. /Wednesday, June 10, 2026

Construction log

Wednesday, June 10, 2026

74 snapshots from the live camera.


AI digest

Throughout the day, excavators worked on the remaining structures, visibly increasing the central debris pile, and a new orange excavator arrived on site. Several dump trucks entered and exited, and various pieces of equipment, including loaders and a mini-excavator, repositioned within the staging and work areas.

▶ Play this day as a timelapse
  1. Construction camera frame at 11:00 PM PT. No construction activity — the site is quiet.
    11:00 PM PT

    No construction activity — the site is quiet.

  2. 3 similar no-change frames9:15 PM–10:00 PM PT

    No visible change was reported between sampled frames; continuous inactivity cannot be inferred.

    1. Construction camera frame at 10:00 PM PT. No construction activity — the site is quiet.
      10:00 PM PT

      No construction activity — the site is quiet.

    2. Construction camera frame at 9:30 PM PT. No construction activity — the site is quiet.
      9:30 PM PT

      No construction activity — the site is quiet.

    3. Construction camera frame at 9:15 PM PT. No construction activity — the site is quiet.
      9:15 PM PT

      No construction activity — the site is quiet.

  3. Construction camera frame at 9:00 PM PT. The site shows minimal alteration, with the same arrangement of machinery and debris as before.
    9:00 PM PT

    The site shows minimal alteration, with the same arrangement of machinery and debris as before.

  4. 8 similar no-change frames7:00 PM–8:45 PM PT

    No visible change was reported between sampled frames; continuous inactivity cannot be inferred.

    1. Construction camera frame at 8:45 PM PT. The site holds steady, with no visible changes in equipment positioning or demolition progress.
      8:45 PM PT

      The site holds steady, with no visible changes in equipment positioning or demolition progress.

    2. Construction camera frame at 8:30 PM PT. The demolition site remains quiet, with no apparent shifts in equipment or the debris field.
      8:30 PM PT

      The demolition site remains quiet, with no apparent shifts in equipment or the debris field.

    3. Construction camera frame at 8:15 PM PT. The scene appears largely unchanged, with equipment remaining in the same positions as before.
      8:15 PM PT

      The scene appears largely unchanged, with equipment remaining in the same positions as before.

    4. Construction camera frame at 8:00 PM PT. No construction activity — the site is quiet.
      8:00 PM PT

      No construction activity — the site is quiet.

    5. Construction camera frame at 7:45 PM PT. No construction activity — the site is quiet.
      7:45 PM PT

      No construction activity — the site is quiet.

    6. Construction camera frame at 7:30 PM PT. No construction activity — the site is quiet.
      7:30 PM PT

      No construction activity — the site is quiet.

    7. Construction camera frame at 7:15 PM PT. No construction activity — the site is quiet.
      7:15 PM PT

      No construction activity — the site is quiet.

    8. Construction camera frame at 7:00 PM PT. No construction activity — the site is quiet.
      7:00 PM PT

      No construction activity — the site is quiet.

  5. Construction camera frame at 6:45 PM PT. The site maintains a quiet status, with no readily apparent movement of machinery or changes to the rubble.
    6:45 PM PT

    The site maintains a quiet status, with no readily apparent movement of machinery or changes to the rubble.

  6. 2 similar no-change frames6:15 PM–6:30 PM PT

    No visible change was reported between sampled frames; continuous inactivity cannot be inferred.

    1. Construction camera frame at 6:30 PM PT. The demolition site continues at a slow pace, with no noticeable changes in the position of equipment or the size of the debris pile.
      6:30 PM PT

      The demolition site continues at a slow pace, with no noticeable changes in the position of equipment or the size of the debris pile.

    2. Construction camera frame at 6:15 PM PT. The scene appears largely unchanged, with the machinery and debris maintaining their previous positions.
      6:15 PM PT

      The scene appears largely unchanged, with the machinery and debris maintaining their previous positions.

  7. Construction camera frame at 6:00 PM PT. The scene holds steady, with equipment and the debris pile appearing in the same configuration as before.
    6:00 PM PT

    The scene holds steady, with equipment and the debris pile appearing in the same configuration as before.

  8. Construction camera frame at 5:45 PM PT. The site presents a largely familiar view, with no significant shifts in equipment placement or debris levels apparent.
    5:45 PM PT

    The site presents a largely familiar view, with no significant shifts in equipment placement or debris levels apparent.

  9. Construction camera frame at 5:30 PM PT. The excavator is now positioned further into the remaining structure, actively working to dismantle a section of wall. Otherwise, the site shows little alteration from the previous view.
    5:30 PM PT

    The excavator is now positioned further into the remaining structure, actively working to dismantle a section of wall. Otherwise, the site shows little alteration from the previous view.

  10. Construction camera frame at 5:15 PM PT. The scene remains remarkably consistent, with the equipment and debris arrangement appearing unchanged from the last view.
    5:15 PM PT

    The scene remains remarkably consistent, with the equipment and debris arrangement appearing unchanged from the last view.

  11. Construction camera frame at 5:00 PM PT. The rubble pile has grown slightly, with the excavator continuing to feed it debris from the remaining structure. A white pickup truck has pulled into the staging area in the upper-left corner, near the crane.
    5:00 PM PT

    The rubble pile has grown slightly, with the excavator continuing to feed it debris from the remaining structure. A white pickup truck has pulled into the staging area in the upper-left corner, near the crane.

  12. Construction camera frame at 4:45 PM PT. There’s been no discernible change in the scene, as the equipment and debris field appear static.
    4:45 PM PT

    There’s been no discernible change in the scene, as the equipment and debris field appear static.

  13. Construction camera frame at 4:30 PM PT. The demolition site appears quiet, with equipment largely holding its positions from the previous view.
    4:30 PM PT

    The demolition site appears quiet, with equipment largely holding its positions from the previous view.

  14. 2 similar no-change frames4:00 PM–4:15 PM PT

    No visible change was reported between sampled frames; continuous inactivity cannot be inferred.

    1. Construction camera frame at 4:15 PM PT. The excavator appears to be working on a slightly different section of the rubble pile, though the overall debris field hasn’t changed significantly. Activity on site is minimal, with equipment remaining in mostly the same positions.
      4:15 PM PT

      The excavator appears to be working on a slightly different section of the rubble pile, though the overall debris field hasn’t changed significantly. Activity on site is minimal, with equipment remaining in mostly the same positions.

    2. Construction camera frame at 4:00 PM PT. The scene remains largely static, with no noticeable shifts in equipment positions or the size of the rubble pile.
      4:00 PM PT

      The scene remains largely static, with no noticeable shifts in equipment positions or the size of the rubble pile.

  15. Construction camera frame at 3:45 PM PT. The excavator is now focused on the western side of the remaining structure, and the rubble pile has visibly increased in size. A lone dump truck is positioned in the upper-left staging area, where previously there were two pickup trucks and a car.
    3:45 PM PT

    The excavator is now focused on the western side of the remaining structure, and the rubble pile has visibly increased in size. A lone dump truck is positioned in the upper-left staging area, where previously there were two pickup trucks and a car.

  16. Construction camera frame at 3:30 PM PT. The excavator is now working on the eastern edge of the rubble pile, and the debris field continues its slow expansion. A silver car has entered the site through the driveway on the left.
    3:30 PM PT

    The excavator is now working on the eastern edge of the rubble pile, and the debris field continues its slow expansion. A silver car has entered the site through the driveway on the left.

  17. Construction camera frame at 3:15 PM PT. The excavator is now working on a different section of the remaining structure, further to the left, and the rubble pile seems to have grown a bit more. A dark-colored pickup truck has joined the white one in the upper-left staging area.
    3:15 PM PT

    The excavator is now working on a different section of the remaining structure, further to the left, and the rubble pile seems to have grown a bit more. A dark-colored pickup truck has joined the white one in the upper-left staging area.

  18. Construction camera frame at 3:00 PM PT. The excavator has shifted its focus to the lower-right portion of the remaining structure, and the rubble pile appears slightly taller. A white pickup truck is now visible parked in the upper-left staging area.
    3:00 PM PT

    The excavator has shifted its focus to the lower-right portion of the remaining structure, and the rubble pile appears slightly taller. A white pickup truck is now visible parked in the upper-left staging area.

  19. Construction camera frame at 2:45 PM PT. The excavator is now positioned slightly further to the right within the rubble pile, and the debris field appears incrementally larger. Otherwise, the positions of equipment and parked vehicles have not shifted noticeably.
    2:45 PM PT

    The excavator is now positioned slightly further to the right within the rubble pile, and the debris field appears incrementally larger. Otherwise, the positions of equipment and parked vehicles have not shifted noticeably.

  20. 2 similar no-change frames2:15 PM–2:30 PM PT

    No visible change was reported between sampled frames; continuous inactivity cannot be inferred.

    1. Construction camera frame at 2:30 PM PT. The excavator is working further back into the debris field, and the rubble pile shows a slight increase in volume. Equipment in the upper staging area remains in the same positions.
      2:30 PM PT

      The excavator is working further back into the debris field, and the rubble pile shows a slight increase in volume. Equipment in the upper staging area remains in the same positions.

    2. Construction camera frame at 2:15 PM PT. A blue dump truck has entered the site from the service road on the right. The excavator continues to work on the central rubble pile, and the overall scene remains largely unchanged.
      2:15 PM PT

      A blue dump truck has entered the site from the service road on the right. The excavator continues to work on the central rubble pile, and the overall scene remains largely unchanged.

  21. Construction camera frame at 2:00 PM PT. The rubble pile has visibly grown, with the excavator continuing to break down the remaining structure. A small, orange mini-excavator is now visible working on the far right side of the debris field.
    2:00 PM PT

    The rubble pile has visibly grown, with the excavator continuing to break down the remaining structure. A small, orange mini-excavator is now visible working on the far right side of the debris field.

  22. Construction camera frame at 1:45 PM PT. The excavator appears to be working at a slightly lower level within the rubble pile now. Beyond that, the equipment and material arrangement looks largely the same as before.
    1:45 PM PT

    The excavator appears to be working at a slightly lower level within the rubble pile now. Beyond that, the equipment and material arrangement looks largely the same as before.

  23. Construction camera frame at 1:30 PM PT. The excavator is now focused on a different section of the remaining building, contributing to a gradual increase in the size of the rubble pile. Otherwise, the arrangement of vehicles and heavy machinery appears stable.
    1:30 PM PT

    The excavator is now focused on a different section of the remaining building, contributing to a gradual increase in the size of the rubble pile. Otherwise, the arrangement of vehicles and heavy machinery appears stable.

  24. Construction camera frame at 1:15 PM PT. A dump truck is exiting the site via the driveway on the left side of the frame. The rest of the scene, including the rubble pile and equipment positions, remains consistent.
    1:15 PM PT

    A dump truck is exiting the site via the driveway on the left side of the frame. The rest of the scene, including the rubble pile and equipment positions, remains consistent.

  25. 3 similar no-change frames12:30 PM–1:00 PM PT

    No visible change was reported between sampled frames; continuous inactivity cannot be inferred.

    1. Construction camera frame at 1:00 PM PT. The overall scene is remarkably similar to the previous view, with no apparent shifts in equipment positions or debris accumulation.
      1:00 PM PT

      The overall scene is remarkably similar to the previous view, with no apparent shifts in equipment positions or debris accumulation.

    2. Construction camera frame at 12:45 PM PT. The scene presents a familiar tableau, with the positions of equipment and the debris pile appearing static.
      12:45 PM PT

      The scene presents a familiar tableau, with the positions of equipment and the debris pile appearing static.

    3. Construction camera frame at 12:30 PM PT. The scene remains largely unchanged, with equipment positioned as before and no significant alteration to the debris pile.
      12:30 PM PT

      The scene remains largely unchanged, with equipment positioned as before and no significant alteration to the debris pile.

  26. Construction camera frame at 12:15 PM PT. The rubble pile has visibly grown, with the excavator continuing to dismantle the remaining sections of the building. Apart from that, the arrangement of machinery and parked vehicles appears consistent.
    12:15 PM PT

    The rubble pile has visibly grown, with the excavator continuing to dismantle the remaining sections of the building. Apart from that, the arrangement of machinery and parked vehicles appears consistent.

  27. Construction camera frame at 12:00 PM PT. The excavator in the center of the frame is now actively working on the remaining structure, visibly removing sections of wall. Otherwise, the layout of equipment and the debris field appear consistent.
    12:00 PM PT

    The excavator in the center of the frame is now actively working on the remaining structure, visibly removing sections of wall. Otherwise, the layout of equipment and the debris field appear consistent.

  28. Construction camera frame at 11:45 AM PT. A yellow loader has moved from the far upper-left corner of the staging area toward the center, near the rubble pile. The overall scene otherwise appears largely as it was.
    11:45 AM PT

    A yellow loader has moved from the far upper-left corner of the staging area toward the center, near the rubble pile. The overall scene otherwise appears largely as it was.

  29. Construction camera frame at 11:30 AM PT. The site’s appearance is stable, showing no clear movement of equipment or substantial alteration to the debris.
    11:30 AM PT

    The site’s appearance is stable, showing no clear movement of equipment or substantial alteration to the debris.

  30. Construction camera frame at 11:15 AM PT. The site maintains its current appearance, with no obvious shifts in the location of machinery or the size of the debris pile.
    11:15 AM PT

    The site maintains its current appearance, with no obvious shifts in the location of machinery or the size of the debris pile.

  31. 2 similar no-change frames10:45 AM–11:00 AM PT

    No visible change was reported between sampled frames; continuous inactivity cannot be inferred.

    1. Construction camera frame at 11:00 AM PT. The scene presents a consistent picture, with no noticeable changes to the equipment layout or debris field.
      11:00 AM PT

      The scene presents a consistent picture, with no noticeable changes to the equipment layout or debris field.

    2. Construction camera frame at 10:45 AM PT. The scene remains remarkably unchanged, with equipment and debris largely holding their positions from the previous view.
      10:45 AM PT

      The scene remains remarkably unchanged, with equipment and debris largely holding their positions from the previous view.

  32. Construction camera frame at 10:30 AM PT. The central rubble pile has visibly grown, with a more substantial accumulation of debris now present. Otherwise, the equipment and vehicle arrangement appears consistent with the previous view.
    10:30 AM PT

    The central rubble pile has visibly grown, with a more substantial accumulation of debris now present. Otherwise, the equipment and vehicle arrangement appears consistent with the previous view.

  33. 3 similar no-change frames9:45 AM–10:15 AM PT

    No visible change was reported between sampled frames; continuous inactivity cannot be inferred.

    1. Construction camera frame at 10:15 AM PT. A dump truck is positioned in the staging area, having moved from the service road on the right into the upper-left corner of the lot. The rest of the site shows no significant alterations in equipment or debris.
      10:15 AM PT

      A dump truck is positioned in the staging area, having moved from the service road on the right into the upper-left corner of the lot. The rest of the site shows no significant alterations in equipment or debris.

    2. Construction camera frame at 10:00 AM PT. The demolition site appears largely static, with no readily apparent movement of equipment or increase in the debris volume.
      10:00 AM PT

      The demolition site appears largely static, with no readily apparent movement of equipment or increase in the debris volume.

    3. Construction camera frame at 9:45 AM PT. A dark-colored dump truck has entered the site using the service road on the right. The rest of the demolition area appears stable, with no major shifts in debris or equipment positioning.
      9:45 AM PT

      A dark-colored dump truck has entered the site using the service road on the right. The rest of the demolition area appears stable, with no major shifts in debris or equipment positioning.

  34. Construction camera frame at 9:30 AM PT. A dump truck is currently exiting the site via the driveway on the left. Beyond that, the demolition scene appears to be holding steady with its previous configuration.
    9:30 AM PT

    A dump truck is currently exiting the site via the driveway on the left. Beyond that, the demolition scene appears to be holding steady with its previous configuration.

  35. Construction camera frame at 9:15 AM PT. The rubble pile appears slightly larger, with more debris visible in the central area of the site. Otherwise, the arrangement of machinery and materials remains largely unchanged.
    9:15 AM PT

    The rubble pile appears slightly larger, with more debris visible in the central area of the site. Otherwise, the arrangement of machinery and materials remains largely unchanged.

  36. Construction camera frame at 9:00 AM PT. The staging area shows a noticeable addition: a bright orange excavator now sits among the other equipment and materials in the upper-left corner. Otherwise, the demolition site maintains its current appearance.
    9:00 AM PT

    The staging area shows a noticeable addition: a bright orange excavator now sits among the other equipment and materials in the upper-left corner. Otherwise, the demolition site maintains its current appearance.

  37. Construction camera frame at 8:45 AM PT. The scene remains strikingly similar, with no obvious alterations to the position of machinery or the size of the debris pile.
    8:45 AM PT

    The scene remains strikingly similar, with no obvious alterations to the position of machinery or the size of the debris pile.

  38. Construction camera frame at 8:30 AM PT. The site presents a familiar view, with no significant shifts in equipment or the debris field apparent.
    8:30 AM PT

    The site presents a familiar view, with no significant shifts in equipment or the debris field apparent.

  39. Construction camera frame at 8:15 AM PT. The excavator has shifted position again, now working on the far left side of the rubble pile. Apart from that, the site’s arrangement of equipment and materials remains consistent.
    8:15 AM PT

    The excavator has shifted position again, now working on the far left side of the rubble pile. Apart from that, the site’s arrangement of equipment and materials remains consistent.

  40. Construction camera frame at 8:00 AM PT. A small loader is now visible moving along the service road on the right side of the frame, heading towards the staging area. The rest of the site appears remarkably consistent with the previous view.
    8:00 AM PT

    A small loader is now visible moving along the service road on the right side of the frame, heading towards the staging area. The rest of the site appears remarkably consistent with the previous view.

  41. Construction camera frame at 7:45 AM PT. The scene holds steady, with equipment and the debris pile appearing in roughly the same configuration as before.
    7:45 AM PT

    The scene holds steady, with equipment and the debris pile appearing in roughly the same configuration as before.

  42. 2 similar no-change frames7:15 AM–7:30 AM PT

    No visible change was reported between sampled frames; continuous inactivity cannot be inferred.

    1. Construction camera frame at 7:30 AM PT. The excavator is now positioned further to the right within the rubble pile, seemingly focusing on a different section of the debris. The overall scene otherwise appears largely unchanged.
      7:30 AM PT

      The excavator is now positioned further to the right within the rubble pile, seemingly focusing on a different section of the debris. The overall scene otherwise appears largely unchanged.

    2. Construction camera frame at 7:15 AM PT. The rubble pile appears a bit more dispersed, with the excavator continuing to sort through the debris. All other equipment and vehicles remain in the same positions as previously observed.
      7:15 AM PT

      The rubble pile appears a bit more dispersed, with the excavator continuing to sort through the debris. All other equipment and vehicles remain in the same positions as previously observed.

  43. Construction camera frame at 7:00 AM PT. The demolition site remains in a holding pattern, with no obvious changes to the rubble or the positioning of machinery.
    7:00 AM PT

    The demolition site remains in a holding pattern, with no obvious changes to the rubble or the positioning of machinery.

  44. Construction camera frame at 6:45 AM PT. The staging area shows a slight shift, as a loader has moved from the far upper-left corner towards the center of that area. Otherwise, the scene presents a familiar arrangement of equipment and debris.
    6:45 AM PT

    The staging area shows a slight shift, as a loader has moved from the far upper-left corner towards the center of that area. Otherwise, the scene presents a familiar arrangement of equipment and debris.

  45. Construction camera frame at 6:30 AM PT. A dump truck has entered the site via the service road on the right, and is maneuvering into the staging area. Otherwise, the demolition site maintains a steady state, with no significant alterations to the rubble or equipment positions.
    6:30 AM PT

    A dump truck has entered the site via the service road on the right, and is maneuvering into the staging area. Otherwise, the demolition site maintains a steady state, with no significant alterations to the rubble or equipment positions.

  46. Construction camera frame at 6:15 AM PT. The excavator appears to be working at a slightly different angle within the rubble, though the overall debris field looks similar to before.
    6:15 AM PT

    The excavator appears to be working at a slightly different angle within the rubble, though the overall debris field looks similar to before.

  47. Construction camera frame at 6:00 AM PT. The scene is remarkably consistent, with the same equipment and rubble configuration visible as before.
    6:00 AM PT

    The scene is remarkably consistent, with the same equipment and rubble configuration visible as before.

  48. 2 similar no-change frames5:30 AM–5:45 AM PT

    No visible change was reported between sampled frames; continuous inactivity cannot be inferred.

    1. Construction camera frame at 5:45 AM PT. The excavator in the center of the rubble pile is now digging at a different location, shifting debris around. Otherwise, the scene remains relatively static, with the same equipment positioned throughout the site.
      5:45 AM PT

      The excavator in the center of the rubble pile is now digging at a different location, shifting debris around. Otherwise, the scene remains relatively static, with the same equipment positioned throughout the site.

    2. Construction camera frame at 5:30 AM PT. The scene appears largely unchanged, with equipment holding its positions and no visible additions to the rubble pile.
      5:30 AM PT

      The scene appears largely unchanged, with equipment holding its positions and no visible additions to the rubble pile.

  49. Construction camera frame at 5:15 AM PT. The rubble pile has noticeably grown, with more of the central structure now reduced to debris. A large dump truck is exiting the site via the driveway on the left.
    5:15 AM PT

    The rubble pile has noticeably grown, with more of the central structure now reduced to debris. A large dump truck is exiting the site via the driveway on the left.

  50. Construction camera frame at 5:00 AM PT. The site is now brightly lit, revealing significant progress in the demolition; a large section of the building has been reduced to rubble. Activity is visible throughout the staging area, with several pieces of heavy machinery repositioned since the last check-in.
    5:00 AM PT

    The site is now brightly lit, revealing significant progress in the demolition; a large section of the building has been reduced to rubble. Activity is visible throughout the staging area, with several pieces of heavy machinery repositioned since the last check-in.

  51. 5 similar no-change frames12:00 AM–4:00 AM PT

    No visible change was reported between sampled frames; continuous inactivity cannot be inferred.

    1. Construction camera frame at 4:00 AM PT. No construction activity — the site is quiet.
      4:00 AM PT

      No construction activity — the site is quiet.

    2. Construction camera frame at 3:00 AM PT. No construction activity — the site is quiet.
      3:00 AM PT

      No construction activity — the site is quiet.

    3. Construction camera frame at 2:00 AM PT. No construction activity — the site is quiet.
      2:00 AM PT

      No construction activity — the site is quiet.

    4. Construction camera frame at 1:00 AM PT. No construction activity — the site is quiet.
      1:00 AM PT

      No construction activity — the site is quiet.

    5. Construction camera frame at 12:00 AM PT. No construction activity — the site is quiet.
      12:00 AM PT

      No construction activity — the site is quiet.