Skip to content
606Onni 606 · Bellevue
  • Live
  • Progress
  • Project
  • History
  • Search
606

606 (& 620) 106th Ave NE, Bellevue, WA

An independent guide to the Onni 606 development.

For the wider city, visit bellevue.wiki ↗

Project

  • Overview
  • Live cam
  • Latest progress
  • Construction log
  • News
  • Permit ledger
  • Construction impacts
  • The Towers
  • Skyline & height
  • Timeline
  • Gallery

Context

  • History of the block
  • Location
  • Developer

Help

  • Search the site
  • FAQ
  • Glossary
  • Sources & press
  • Contact
  • Updates feed
  • Sitemap

This is an independent, informational fan site. It is not affiliated with, sponsored by, or endorsed by Onni Group. Figures are compiled from public reporting and are approximate and subject to change. Project names and trademarks belong to their respective owners.

© 2026 onni606.com — built by an enthusiast.

  1. Home
  2. /Construction log
  3. /Thursday, June 11, 2026

Construction log

Thursday, June 11, 2026

75 snapshots from the live camera.


AI digest

The debris field was noticeably rearranged during the day: the broad upper area appears clearer, while material is shifted around the central remaining structure. A white vehicle is parked beside it by the last frame; otherwise, visible activity was limited and no major change to the remaining structure is apparent.

▶ Play this day as a timelapse
  1. Construction camera frame at 11:00 PM PT. No construction activity — the site is quiet.
    11:00 PM PT

    No construction activity — the site is quiet.

  2. 12 similar no-change frames7:00 PM–10:00 PM PT

    No visible change was reported between sampled frames; continuous inactivity cannot be inferred.

    1. Construction camera frame at 10:00 PM PT. No construction activity — the site is quiet.
      10:00 PM PT

      No construction activity — the site is quiet.

    2. Construction camera frame at 9:30 PM PT. The demolition site appears largely unchanged over the last fifteen minutes.
      9:30 PM PT

      The demolition site appears largely unchanged over the last fifteen minutes.

    3. Construction camera frame at 9:15 PM PT. No construction activity — the site is quiet.
      9:15 PM PT

      No construction activity — the site is quiet.

    4. Construction camera frame at 9:00 PM PT. No construction activity — the site is quiet.
      9:00 PM PT

      No construction activity — the site is quiet.

    5. Construction camera frame at 8:45 PM PT. No construction activity — the site is quiet.
      8:45 PM PT

      No construction activity — the site is quiet.

    6. Construction camera frame at 8:30 PM PT. No construction activity — the site is quiet.
      8:30 PM PT

      No construction activity — the site is quiet.

    7. Construction camera frame at 8:15 PM PT. No construction activity — the site is quiet.
      8:15 PM PT

      No construction activity — the site is quiet.

    8. Construction camera frame at 8:00 PM PT. No construction activity — the site is quiet.
      8:00 PM PT

      No construction activity — the site is quiet.

    9. Construction camera frame at 7:45 PM PT. No construction activity — the site is quiet.
      7:45 PM PT

      No construction activity — the site is quiet.

    10. Construction camera frame at 7:30 PM PT. No construction activity — the site is quiet.
      7:30 PM PT

      No construction activity — the site is quiet.

    11. Construction camera frame at 7:15 PM PT. No construction activity — the site is quiet.
      7:15 PM PT

      No construction activity — the site is quiet.

    12. Construction camera frame at 7:00 PM PT. No construction activity — the site is quiet.
      7:00 PM PT

      No construction activity — the site is quiet.

  3. Construction camera frame at 6:45 PM PT. Activity is minimal, though the excavator appears to be working in a slightly different spot within the rubble.
    6:45 PM PT

    Activity is minimal, though the excavator appears to be working in a slightly different spot within the rubble.

  4. Construction camera frame at 6:30 PM PT. The scene remains steady, with no apparent shifts in equipment or the size of the debris pile.
    6:30 PM PT

    The scene remains steady, with no apparent shifts in equipment or the size of the debris pile.

  5. Construction camera frame at 6:15 PM PT. Dust is rising from the center of the site as the excavator continues to break down the remaining structure.
    6:15 PM PT

    Dust is rising from the center of the site as the excavator continues to break down the remaining structure.

  6. Construction camera frame at 6:00 PM PT. The excavator has shifted slightly to the left, and the rubble pile seems a bit more dispersed.
    6:00 PM PT

    The excavator has shifted slightly to the left, and the rubble pile seems a bit more dispersed.

  7. Construction camera frame at 5:45 PM PT. The rubble pile has grown slightly, with the excavator continuing to work within it.
    5:45 PM PT

    The rubble pile has grown slightly, with the excavator continuing to work within it.

  8. Construction camera frame at 5:30 PM PT. The demolition site appears largely unchanged, with equipment remaining in the same positions as before.
    5:30 PM PT

    The demolition site appears largely unchanged, with equipment remaining in the same positions as before.

  9. Construction camera frame at 5:15 PM PT. The excavator is now positioned further to the right, actively digging into the central rubble pile.
    5:15 PM PT

    The excavator is now positioned further to the right, actively digging into the central rubble pile.

  10. Construction camera frame at 5:00 PM PT. A white pickup truck is now visible parked near the remaining structure, where none was present moments ago.
    5:00 PM PT

    A white pickup truck is now visible parked near the remaining structure, where none was present moments ago.

  11. Construction camera frame at 4:45 PM PT. Activity is quiet, though a white vehicle has entered the site from the driveway on the left.
    4:45 PM PT

    Activity is quiet, though a white vehicle has entered the site from the driveway on the left.

  12. Construction camera frame at 4:30 PM PT. The scene is remarkably consistent, with no readily apparent alterations to the layout of equipment or the size of the debris pile.
    4:30 PM PT

    The scene is remarkably consistent, with no readily apparent alterations to the layout of equipment or the size of the debris pile.

  13. Construction camera frame at 4:15 PM PT. The site is holding steady, with no noticeable shifts in equipment positions or debris accumulation.
    4:15 PM PT

    The site is holding steady, with no noticeable shifts in equipment positions or debris accumulation.

  14. Construction camera frame at 4:00 PM PT. A loader is now moving debris within the upper-left staging area, and a second dump truck has entered the site via the driveway on the left.
    4:00 PM PT

    A loader is now moving debris within the upper-left staging area, and a second dump truck has entered the site via the driveway on the left.

  15. 4 similar no-change frames3:00 PM–3:45 PM PT

    No visible change was reported between sampled frames; continuous inactivity cannot be inferred.

    1. Construction camera frame at 3:45 PM PT. The overall scene remains largely unchanged, though the excavator appears to be working at a slightly different angle within the rubble.
      3:45 PM PT

      The overall scene remains largely unchanged, though the excavator appears to be working at a slightly different angle within the rubble.

    2. Construction camera frame at 3:30 PM PT. The site presents a very similar view, with no apparent movement of equipment or significant changes to the debris field.
      3:30 PM PT

      The site presents a very similar view, with no apparent movement of equipment or significant changes to the debris field.

    3. Construction camera frame at 3:15 PM PT. The demolition site shows minimal variation, with equipment appearing to remain in the same locations.
      3:15 PM PT

      The demolition site shows minimal variation, with equipment appearing to remain in the same locations.

    4. Construction camera frame at 3:00 PM PT. The scene appears static, with all machinery and debris remaining in roughly the same positions as before.
      3:00 PM PT

      The scene appears static, with all machinery and debris remaining in roughly the same positions as before.

  16. Construction camera frame at 2:45 PM PT. The excavator is actively working on the remaining structure, now focusing on the western side, and a white pickup truck is parked in the staging area where no vehicle was visible before.
    2:45 PM PT

    The excavator is actively working on the remaining structure, now focusing on the western side, and a white pickup truck is parked in the staging area where no vehicle was visible before.

  17. Construction camera frame at 2:30 PM PT. The rubble pile appears slightly larger, with the excavator continuing to work within it, and a dump truck is now positioned along the service road on the right.
    2:30 PM PT

    The rubble pile appears slightly larger, with the excavator continuing to work within it, and a dump truck is now positioned along the service road on the right.

  18. Construction camera frame at 2:15 PM PT. A white car has appeared parked near the remaining structure, and the excavator continues working within the central rubble pile.
    2:15 PM PT

    A white car has appeared parked near the remaining structure, and the excavator continues working within the central rubble pile.

  19. Construction camera frame at 2:00 PM PT. The scene remains largely unchanged, with equipment holding its positions and no significant progress visible in the demolition.
    2:00 PM PT

    The scene remains largely unchanged, with equipment holding its positions and no significant progress visible in the demolition.

  20. Construction camera frame at 1:45 PM PT. The excavator’s position has shifted slightly, now working on the eastern side of the remaining structure, and a small loader is moving materials within the upper-left staging area.
    1:45 PM PT

    The excavator’s position has shifted slightly, now working on the eastern side of the remaining structure, and a small loader is moving materials within the upper-left staging area.

  21. Construction camera frame at 1:30 PM PT. The excavator is now positioned further into the remaining structure, working on the central section of the building, and a white van has entered the site through the driveway on the left.
    1:30 PM PT

    The excavator is now positioned further into the remaining structure, working on the central section of the building, and a white van has entered the site through the driveway on the left.

  22. Construction camera frame at 1:15 PM PT. A red dump truck now sits in the staging area, having entered via the driveway on the left, and the excavator is working slightly further into the remaining structure.
    1:15 PM PT

    A red dump truck now sits in the staging area, having entered via the driveway on the left, and the excavator is working slightly further into the remaining structure.

  23. Construction camera frame at 1:00 PM PT. The excavator has moved further into the structure, now working on the western side of what remains, and a dump truck is pulling out of the driveway on the left.
    1:00 PM PT

    The excavator has moved further into the structure, now working on the western side of what remains, and a dump truck is pulling out of the driveway on the left.

  24. Construction camera frame at 12:45 PM PT. The excavator now appears to be working further back into the rubble pile, and a white vehicle has pulled into the staging area off the street on the left.
    12:45 PM PT

    The excavator now appears to be working further back into the rubble pile, and a white vehicle has pulled into the staging area off the street on the left.

  25. Construction camera frame at 12:30 PM PT. The rubble pile has visibly grown, with the excavator now focused on a different section of the remaining structure.
    12:30 PM PT

    The rubble pile has visibly grown, with the excavator now focused on a different section of the remaining structure.

  26. Construction camera frame at 12:15 PM PT. It appears a white pickup truck has entered the site via the service road on the right.
    12:15 PM PT

    It appears a white pickup truck has entered the site via the service road on the right.

  27. Construction camera frame at 12:00 PM PT. The excavator has shifted position again, now working on the eastern side of the rubble pile, and a small excavator is visible working near the remaining wall on the lower right.
    12:00 PM PT

    The excavator has shifted position again, now working on the eastern side of the rubble pile, and a small excavator is visible working near the remaining wall on the lower right.

  28. Construction camera frame at 11:45 AM PT. The scene remains largely unchanged, though the excavator appears to be working at a slightly different angle within the rubble.
    11:45 AM PT

    The scene remains largely unchanged, though the excavator appears to be working at a slightly different angle within the rubble.

  29. Construction camera frame at 11:30 AM PT. The excavator is now positioned on top of the rubble pile, and a loader is actively moving debris in the upper-left staging area.
    11:30 AM PT

    The excavator is now positioned on top of the rubble pile, and a loader is actively moving debris in the upper-left staging area.

  30. Construction camera frame at 11:15 AM PT. A second dump truck is now visible pulling onto the site from the driveway on the left, joining the one that arrived earlier.
    11:15 AM PT

    A second dump truck is now visible pulling onto the site from the driveway on the left, joining the one that arrived earlier.

  31. Construction camera frame at 11:00 AM PT. The scene appears steady, with the excavator maintaining its position as it works through the rubble.
    11:00 AM PT

    The scene appears steady, with the excavator maintaining its position as it works through the rubble.

  32. Construction camera frame at 10:45 AM PT. Activity is minimal, though the excavator appears to be working a different section of the rubble pile than before.
    10:45 AM PT

    Activity is minimal, though the excavator appears to be working a different section of the rubble pile than before.

  33. Construction camera frame at 10:30 AM PT. The excavator is now working further into the center of the demolition zone, and a white pickup truck has entered the site from the driveway on the left.
    10:30 AM PT

    The excavator is now working further into the center of the demolition zone, and a white pickup truck has entered the site from the driveway on the left.

  34. Construction camera frame at 10:15 AM PT. The rubble pile appears slightly smaller, as the excavator continues to redistribute debris within the demolition zone.
    10:15 AM PT

    The rubble pile appears slightly smaller, as the excavator continues to redistribute debris within the demolition zone.

  35. Construction camera frame at 10:00 AM PT. The excavator has shifted its focus again, now working on the western edge of the rubble pile, and a dump truck is exiting the site via the service road on the right.
    10:00 AM PT

    The excavator has shifted its focus again, now working on the western edge of the rubble pile, and a dump truck is exiting the site via the service road on the right.

  36. Construction camera frame at 9:45 AM PT. The scene remains largely unchanged, with the excavator continuing to work the central rubble pile at a similar pace.
    9:45 AM PT

    The scene remains largely unchanged, with the excavator continuing to work the central rubble pile at a similar pace.

  37. Construction camera frame at 9:30 AM PT. The excavator is now positioned slightly further back from the rubble pile, and a small loader is maneuvering around the equipment in the upper-left staging area.
    9:30 AM PT

    The excavator is now positioned slightly further back from the rubble pile, and a small loader is maneuvering around the equipment in the upper-left staging area.

  38. Construction camera frame at 9:15 AM PT. The excavator is actively reshaping the rubble pile, and a dark-colored dump truck has pulled into the staging area from the left.
    9:15 AM PT

    The excavator is actively reshaping the rubble pile, and a dark-colored dump truck has pulled into the staging area from the left.

  39. Construction camera frame at 9:00 AM PT. The excavator is now focused on a different area of the rubble, and a second dump truck is visible entering the site from the driveway on the left.
    9:00 AM PT

    The excavator is now focused on a different area of the rubble, and a second dump truck is visible entering the site from the driveway on the left.

  40. Construction camera frame at 8:45 AM PT. A white pickup truck is now visible parked in the upper-left staging area, near the other vehicles, and the excavator appears to be working a different section of the rubble pile.
    8:45 AM PT

    A white pickup truck is now visible parked in the upper-left staging area, near the other vehicles, and the excavator appears to be working a different section of the rubble pile.

  41. Construction camera frame at 8:30 AM PT. The demolition site is holding steady, with no discernible shifts in equipment or the rubble's size.
    8:30 AM PT

    The demolition site is holding steady, with no discernible shifts in equipment or the rubble's size.

  42. Construction camera frame at 8:15 AM PT. The rubble pile appears slightly larger, though the change is incremental, and a white truck has entered the site via the driveway on the left.
    8:15 AM PT

    The rubble pile appears slightly larger, though the change is incremental, and a white truck has entered the site via the driveway on the left.

  43. 2 similar no-change frames7:45 AM–8:00 AM PT

    No visible change was reported between sampled frames; continuous inactivity cannot be inferred.

    1. Construction camera frame at 8:00 AM PT. The staging area shows a loader now actively moving debris, and a dump truck is pulling out onto the service road on the right. Otherwise, the site maintains a consistent appearance, with the rubble pile and remaining structure showing no major alterations.
      8:00 AM PT

      The staging area shows a loader now actively moving debris, and a dump truck is pulling out onto the service road on the right. Otherwise, the site maintains a consistent appearance, with the rubble pile and remaining structure showing no major alterations.

    2. Construction camera frame at 7:45 AM PT. The scene remains relatively static, with no significant changes to equipment positions or the size of the rubble pile.
      7:45 AM PT

      The scene remains relatively static, with no significant changes to equipment positions or the size of the rubble pile.

  44. Construction camera frame at 7:30 AM PT. The excavator in the center of the site is now positioned slightly differently, having shifted further onto the rubble pile. Otherwise, the scene remains stable, with equipment and materials holding their positions.
    7:30 AM PT

    The excavator in the center of the site is now positioned slightly differently, having shifted further onto the rubble pile. Otherwise, the scene remains stable, with equipment and materials holding their positions.

  45. 6 similar no-change frames6:00 AM–7:15 AM PT

    No visible change was reported between sampled frames; continuous inactivity cannot be inferred.

    1. Construction camera frame at 7:15 AM PT. The rubble pile has visibly grown, with more debris now accumulated in the center of the site. Otherwise, the equipment and vehicles remain in roughly the same positions as before.
      7:15 AM PT

      The rubble pile has visibly grown, with more debris now accumulated in the center of the site. Otherwise, the equipment and vehicles remain in roughly the same positions as before.

    2. Construction camera frame at 7:00 AM PT. Several workers are now visible near the staging area in the upper-left, and a new pile of debris has accumulated at the base of the remaining structure. Otherwise, the site appears largely unchanged from the last check-in.
      7:00 AM PT

      Several workers are now visible near the staging area in the upper-left, and a new pile of debris has accumulated at the base of the remaining structure. Otherwise, the site appears largely unchanged from the last check-in.

    3. Construction camera frame at 6:45 AM PT. No construction activity — the site is quiet.
      6:45 AM PT

      No construction activity — the site is quiet.

    4. Construction camera frame at 6:30 AM PT. No construction activity — the site is quiet.
      6:30 AM PT

      No construction activity — the site is quiet.

    5. Construction camera frame at 6:15 AM PT. No construction activity — the site is quiet.
      6:15 AM PT

      No construction activity — the site is quiet.

    6. Construction camera frame at 6:00 AM PT. No construction activity — the site is quiet.
      6:00 AM PT

      No construction activity — the site is quiet.

  46. Construction camera frame at 5:45 AM PT. A white van has entered the site via the driveway on the left, and is now parked near the staging area. Apart from that, the demolition site maintains the same appearance as before.
    5:45 AM PT

    A white van has entered the site via the driveway on the left, and is now parked near the staging area. Apart from that, the demolition site maintains the same appearance as before.

  47. 2 similar no-change frames5:15 AM–5:30 AM PT

    No visible change was reported between sampled frames; continuous inactivity cannot be inferred.

    1. Construction camera frame at 5:30 AM PT. The scene is holding steady, with no discernible shifts in equipment or the rubble’s shape.
      5:30 AM PT

      The scene is holding steady, with no discernible shifts in equipment or the rubble’s shape.

    2. Construction camera frame at 5:15 AM PT. The staging area shows a noticeable shift, with a loader now positioned closer to the rubble pile. Otherwise, the scene remains largely unchanged, and visibility is still limited by the evening light.
      5:15 AM PT

      The staging area shows a noticeable shift, with a loader now positioned closer to the rubble pile. Otherwise, the scene remains largely unchanged, and visibility is still limited by the evening light.

  48. Construction camera frame at 5:00 AM PT. The rubble pile appears slightly more defined, though no significant demolition activity is visible. Conditions remain quiet with limited visibility due to the darkness.
    5:00 AM PT

    The rubble pile appears slightly more defined, though no significant demolition activity is visible. Conditions remain quiet with limited visibility due to the darkness.

  49. Construction camera frame at 4:45 AM PT. The site appears brighter now, and a clearer view reveals more of the rubble pile has been rearranged. Visibility remains low, but there's no apparent change in vehicle or machinery positions.
    4:45 AM PT

    The site appears brighter now, and a clearer view reveals more of the rubble pile has been rearranged. Visibility remains low, but there's no apparent change in vehicle or machinery positions.

  50. 5 similar no-change frames12:00 AM–4:00 AM PT

    No visible change was reported between sampled frames; continuous inactivity cannot be inferred.

    1. Construction camera frame at 4:00 AM PT. No construction activity — the site is quiet.
      4:00 AM PT

      No construction activity — the site is quiet.

    2. Construction camera frame at 3:00 AM PT. No construction activity — the site is quiet.
      3:00 AM PT

      No construction activity — the site is quiet.

    3. Construction camera frame at 2:00 AM PT. No construction activity — the site is quiet.
      2:00 AM PT

      No construction activity — the site is quiet.

    4. Construction camera frame at 1:00 AM PT. No construction activity — the site is quiet.
      1:00 AM PT

      No construction activity — the site is quiet.

    5. Construction camera frame at 12:00 AM PT. No construction activity — the site is quiet.
      12:00 AM PT

      No construction activity — the site is quiet.

← Jun 10All daysJun 12 →