Skip to content
Newbellevue.wiki — a field guide to every tower, park & landmark in Bellevue, from the same independent maker.Visit ↗
606Onni 606 · Bellevue
  • Live
  • Timelapse
  • News
  • Towers
  • Skyline
  • Location
  • Timeline
606

606 (& 620) 106th Ave NE, Bellevue, WA

An independent guide to the Onni 606 development.

Project

  • Overview
  • Live cam
  • Live data
  • Construction log
  • The Towers
  • Skyline & height
  • Timeline
  • Gallery

Context

  • History of the block
  • Location
  • Developer
  • All of Bellevue ↗

Help

  • FAQ
  • Glossary
  • Sources & press
  • Contact
  • Updates feed
  • Sitemap

This is an independent, informational fan site. It is not affiliated with, sponsored by, or endorsed by Onni Group. Figures are compiled from public reporting and are approximate and subject to change. Project names and trademarks belong to their respective owners.

© 2026 onni606.com — built by an enthusiast.

  1. Home
  2. /Construction log
  3. /Friday, June 12, 2026

Construction log

Friday, June 12, 2026

75 snapshots from the live camera.

Onni 606 · project recordDowntown Bellevue

AI digest

The remaining structure was significantly demolished, with the main excavator actively working on different sections throughout the day, and the central rubble pile visibly grew. Several dump trucks and a loader were active on site, moving material and exiting/entering the staging area.

▶ Play this day as a timelapse
  1. No construction activity — the site is quiet.
    11:00 PM PT

    No construction activity — the site is quiet.

  2. No construction activity — the site is quiet.
    10:00 PM PT

    No construction activity — the site is quiet.

  3. The demolition site appears quiet, with no clear shifts in the positions of machinery or the size of the debris pile.
    9:30 PM PT

    The demolition site appears quiet, with no clear shifts in the positions of machinery or the size of the debris pile.

  4. The scene remains largely static, with no noticeable changes in equipment positions or the rubble pile.
    9:15 PM PT

    The scene remains largely static, with no noticeable changes in equipment positions or the rubble pile.

  5. No construction activity — the site is quiet.
    9:00 PM PT

    No construction activity — the site is quiet.

  6. No construction activity — the site is quiet.
    8:45 PM PT

    No construction activity — the site is quiet.

  7. No construction activity — the site is quiet.
    8:30 PM PT

    No construction activity — the site is quiet.

  8. No construction activity — the site is quiet.
    8:15 PM PT

    No construction activity — the site is quiet.

  9. No construction activity — the site is quiet.
    8:00 PM PT

    No construction activity — the site is quiet.

  10. No construction activity — the site is quiet.
    7:45 PM PT

    No construction activity — the site is quiet.

  11. No construction activity — the site is quiet.
    7:30 PM PT

    No construction activity — the site is quiet.

  12. No construction activity — the site is quiet.
    7:15 PM PT

    No construction activity — the site is quiet.

  13. No construction activity — the site is quiet.
    7:00 PM PT

    No construction activity — the site is quiet.

  14. No visible changes have occurred across the site or staging area.
    6:45 PM PT

    No visible changes have occurred across the site or staging area.

  15. There’s a slight repositioning of materials in the upper-left staging area, with a loader now facing a different direction.
    6:30 PM PT

    There’s a slight repositioning of materials in the upper-left staging area, with a loader now facing a different direction.

  16. The rubble pile has visibly grown, with the excavator actively feeding it new debris from the remaining structure.
    6:15 PM PT

    The rubble pile has visibly grown, with the excavator actively feeding it new debris from the remaining structure.

  17. The site’s arrangement of equipment and debris remains consistent, showing no significant alterations in the last quarter hour.
    6:00 PM PT

    The site’s arrangement of equipment and debris remains consistent, showing no significant alterations in the last quarter hour.

  18. The demolition site appears stable, with no readily visible shifts in machinery or rubble distribution.
    5:45 PM PT

    The demolition site appears stable, with no readily visible shifts in machinery or rubble distribution.

  19. The site continues to show little to no demonstrable progress in the last fifteen minutes.
    5:30 PM PT

    The site continues to show little to no demonstrable progress in the last fifteen minutes.

  20. The scene is holding steady, with no noticeable alterations to the equipment layout or debris field.
    5:15 PM PT

    The scene is holding steady, with no noticeable alterations to the equipment layout or debris field.

  21. The scene remains largely unchanged, with equipment and debris appearing in similar arrangements as before.
    5:00 PM PT

    The scene remains largely unchanged, with equipment and debris appearing in similar arrangements as before.

  22. The site’s appearance is remarkably consistent, with no observable changes to the position of equipment or the size of the debris pile.
    4:45 PM PT

    The site’s appearance is remarkably consistent, with no observable changes to the position of equipment or the size of the debris pile.

  23. The overall scene presents a very similar picture, with no apparent shifts in equipment or demolition progress.
    4:30 PM PT

    The overall scene presents a very similar picture, with no apparent shifts in equipment or demolition progress.

  24. The site shows minimal movement, with all machinery appearing to remain in the same locations.
    4:15 PM PT

    The site shows minimal movement, with all machinery appearing to remain in the same locations.

  25. The demolition site appears static, with no discernible adjustments to machinery or debris piles over the last quarter hour.
    4:00 PM PT

    The demolition site appears static, with no discernible adjustments to machinery or debris piles over the last quarter hour.

  26. Equipment remains in largely the same positions, though the excavator now appears to be slightly lower to the ground.
    3:45 PM PT

    Equipment remains in largely the same positions, though the excavator now appears to be slightly lower to the ground.

  27. The site maintains a consistent appearance, with no obvious alterations to equipment positions or the demolition progress.
    3:30 PM PT

    The site maintains a consistent appearance, with no obvious alterations to equipment positions or the demolition progress.

  28. The scene remains largely unchanged, with the excavator still positioned over the rubble pile.
    3:15 PM PT

    The scene remains largely unchanged, with the excavator still positioned over the rubble pile.

  29. No new activity is visible across the site or in the staging area.
    3:00 PM PT

    No new activity is visible across the site or in the staging area.

  30. The excavator has paused its work, now stationary above the growing central rubble pile.
    2:45 PM PT

    The excavator has paused its work, now stationary above the growing central rubble pile.

  31. The staging area shows a slight shift, with a loader now positioned closer to the driveway on the left.
    2:30 PM PT

    The staging area shows a slight shift, with a loader now positioned closer to the driveway on the left.

  32. The site appears static, with no discernible movement of equipment or change in the debris field over the last quarter hour.
    2:15 PM PT

    The site appears static, with no discernible movement of equipment or change in the debris field over the last quarter hour.

  33. The debris pile has visibly increased in size, as the excavator continues to break down the remaining structure.
    2:00 PM PT

    The debris pile has visibly increased in size, as the excavator continues to break down the remaining structure.

  34. The excavator near the remaining structure is now digging at a slightly lower level, and the debris pile appears incrementally larger.
    1:45 PM PT

    The excavator near the remaining structure is now digging at a slightly lower level, and the debris pile appears incrementally larger.

  35. The scene remains largely unchanged, with equipment positioned as it was moments ago.
    1:30 PM PT

    The scene remains largely unchanged, with equipment positioned as it was moments ago.

  36. The main excavator appears to have shifted its focus again, now working on the lower section of the remaining structure.
    1:15 PM PT

    The main excavator appears to have shifted its focus again, now working on the lower section of the remaining structure.

  37. Demolition work continues, with the main excavator now concentrating its efforts on a different section of the building’s remains.
    1:00 PM PT

    Demolition work continues, with the main excavator now concentrating its efforts on a different section of the building’s remains.

  38. A dump truck is exiting the job site via the service road on the right side of the frame.
    12:45 PM PT

    A dump truck is exiting the job site via the service road on the right side of the frame.

  39. The excavator is now positioned slightly differently, working on a new part of the structure, and the debris pile has grown a bit more.
    12:30 PM PT

    The excavator is now positioned slightly differently, working on a new part of the structure, and the debris pile has grown a bit more.

  40. The loader in the upper-left staging area is now actively moving debris, and a second, smaller excavator is visible near the rubble pile.
    12:15 PM PT

    The loader in the upper-left staging area is now actively moving debris, and a second, smaller excavator is visible near the rubble pile.

  41. The excavator now appears to be focused on a different section of the remaining building, and the rubble pile has visibly expanded.
    12:00 PM PT

    The excavator now appears to be focused on a different section of the remaining building, and the rubble pile has visibly expanded.

  42. A white pickup truck has appeared near the driveway on the left side of the frame.
    11:45 AM PT

    A white pickup truck has appeared near the driveway on the left side of the frame.

  43. The scene appears largely unchanged, though the rubble pile has grown slightly as demolition continues.
    11:30 AM PT

    The scene appears largely unchanged, though the rubble pile has grown slightly as demolition continues.

  44. Activity on site remains steady, with the excavator continuing to dismantle the structure and the rubble pile growing incrementally.
    11:15 AM PT

    Activity on site remains steady, with the excavator continuing to dismantle the structure and the rubble pile growing incrementally.

  45. A blue dump truck has entered the site via the service road on the right, positioning itself near the staging area.
    11:00 AM PT

    A blue dump truck has entered the site via the service road on the right, positioning itself near the staging area.

  46. The excavator has shifted position again, now working on the far side of the remaining structure, and the rubble pile continues to accumulate.
    10:45 AM PT

    The excavator has shifted position again, now working on the far side of the remaining structure, and the rubble pile continues to accumulate.

  47. A dump truck is now positioned in the staging area, receiving debris from the excavator.
    10:30 AM PT

    A dump truck is now positioned in the staging area, receiving debris from the excavator.

  48. The excavator is working at the base of the remaining structure, and the rubble pile shows a slight increase in size.
    10:15 AM PT

    The excavator is working at the base of the remaining structure, and the rubble pile shows a slight increase in size.

  49. The excavator is now positioned slightly further to the right, continuing to break down the remaining structure, and the rubble pile appears a bit larger.
    10:00 AM PT

    The excavator is now positioned slightly further to the right, continuing to break down the remaining structure, and the rubble pile appears a bit larger.

  50. The excavator appears to be working a different section of the remaining structure, and the rubble pile has expanded slightly.
    9:45 AM PT

    The excavator appears to be working a different section of the remaining structure, and the rubble pile has expanded slightly.

  51. The rubble pile has grown noticeably, with the excavator continuing to deposit debris into it.
    9:30 AM PT

    The rubble pile has grown noticeably, with the excavator continuing to deposit debris into it.

  52. The excavator is actively working, and a noticeable amount of debris has been added to the central rubble pile.
    9:15 AM PT

    The excavator is actively working, and a noticeable amount of debris has been added to the central rubble pile.

  53. A dump truck is exiting the site via the driveway on the left.
    9:00 AM PT

    A dump truck is exiting the site via the driveway on the left.

  54. The scene remains largely unchanged, with equipment holding its positions and no visible demolition progress.
    8:45 AM PT

    The scene remains largely unchanged, with equipment holding its positions and no visible demolition progress.

  55. The excavator is actively feeding material into the growing rubble pile, and a dump truck is now positioned in the upper-left staging area.
    8:30 AM PT

    The excavator is actively feeding material into the growing rubble pile, and a dump truck is now positioned in the upper-left staging area.

  56. The excavator continues to work at the rubble pile, though the debris field doesn't appear to have changed significantly.
    8:15 AM PT

    The excavator continues to work at the rubble pile, though the debris field doesn't appear to have changed significantly.

  57. The excavator is still working at the rubble pile, and the debris field appears slightly larger.
    8:00 AM PT

    The excavator is still working at the rubble pile, and the debris field appears slightly larger.

  58. The rubble pile has visibly grown as the excavator continues to dismantle the remaining structure.
    7:45 AM PT

    The rubble pile has visibly grown as the excavator continues to dismantle the remaining structure.

  59. A small loader has moved from the upper-left staging area and is now positioned near the rubble pile.
    7:30 AM PT

    A small loader has moved from the upper-left staging area and is now positioned near the rubble pile.

  60. An excavator is now active in the center of the frame, working on the remaining walls of the structure.
    7:15 AM PT

    An excavator is now active in the center of the frame, working on the remaining walls of the structure.

  61. No visible changes have occurred across the site or in the staging area.
    7:00 AM PT

    No visible changes have occurred across the site or in the staging area.

  62. No construction activity — the site is quiet.
    6:45 AM PT

    No construction activity — the site is quiet.

  63. The site maintains a steady appearance, with no significant alterations to the debris or equipment arrangement.
    6:30 AM PT

    The site maintains a steady appearance, with no significant alterations to the debris or equipment arrangement.

  64. The demolition site presents a largely consistent view, with equipment and the debris pile holding their positions.
    6:15 AM PT

    The demolition site presents a largely consistent view, with equipment and the debris pile holding their positions.

  65. The site looks quite static, with machinery and debris remaining in roughly the same arrangement.
    6:00 AM PT

    The site looks quite static, with machinery and debris remaining in roughly the same arrangement.

  66. Several white service vehicles are now parked in the upper-left staging area, near the fencing.
    5:45 AM PT

    Several white service vehicles are now parked in the upper-left staging area, near the fencing.

  67. The demolition site remains in a similar state, with no obvious shifts in equipment or debris.
    5:30 AM PT

    The demolition site remains in a similar state, with no obvious shifts in equipment or debris.

  68. The scene appears largely unchanged, with equipment remaining in the same positions as before.
    5:15 AM PT

    The scene appears largely unchanged, with equipment remaining in the same positions as before.

  69. The rubble pile has visibly grown, with more debris now scattered across the center of the site.
    5:00 AM PT

    The rubble pile has visibly grown, with more debris now scattered across the center of the site.

  70. Visibility has improved, revealing the dark demolition site and surrounding streets.
    4:45 AM PT

    Visibility has improved, revealing the dark demolition site and surrounding streets.

  71. No construction activity — the site is quiet.
    4:00 AM PT

    No construction activity — the site is quiet.

  72. No construction activity — the site is quiet.
    3:00 AM PT

    No construction activity — the site is quiet.

  73. No construction activity — the site is quiet.
    2:00 AM PT

    No construction activity — the site is quiet.

  74. No construction activity — the site is quiet.
    1:00 AM PT

    No construction activity — the site is quiet.

  75. No construction activity — the site is quiet.
    12:00 AM PT

    No construction activity — the site is quiet.