606

606 (& 620) 106th Ave NE, Bellevue, WA

An independent guide to the Onni 606 development.

For the wider city, visit bellevue.wiki ↗

Project

  • Overview
  • Live cam
  • Latest progress
  • Construction log
  • News
  • Permit ledger
  • Construction impacts
  • The Towers
  • Skyline & height
  • Timeline
  • Gallery

Context

  • History of the block
  • Location
  • Developer

Help

  • Search the site
  • FAQ
  • Glossary
  • Sources & press
  • Contact
  • Updates feed
  • Sitemap

This is an independent, informational fan site. It is not affiliated with, sponsored by, or endorsed by Onni Group. Figures are compiled from public reporting and are approximate and subject to change. Project names and trademarks belong to their respective owners.

© 2026 onni606.com — built by an enthusiast.

  1. Home
  2. /Construction log
  3. /Friday, June 12, 2026

Construction log

Friday, June 12, 2026

75 snapshots from the live camera.


AI digest

The remaining structure was further reduced over the week, with debris spread across the center of the site; during the day, the main excavator worked intermittently and added to the debris pile, while trucks and a loader shifted around the staging areas. Activity was mostly quiet later, with no major change visible between the day’s first and last frames.

▶ Play this day as a timelapse
  1. Construction camera frame at 11:00 PM PT. No construction activity — the site is quiet.
    11:00 PM PT

    No construction activity — the site is quiet.

  2. Construction camera frame at 10:00 PM PT. No construction activity — the site is quiet.
    10:00 PM PT

    No construction activity — the site is quiet.

  3. Construction camera frame at 9:30 PM PT. The demolition site appears quiet, with no clear shifts in the positions of machinery or the size of the debris pile.
    9:30 PM PT

    The demolition site appears quiet, with no clear shifts in the positions of machinery or the size of the debris pile.

  4. 11 similar no-change frames6:45 PM–9:15 PM PT

    No visible change was reported between sampled frames; continuous inactivity cannot be inferred.

    1. Construction camera frame at 9:15 PM PT. The scene remains largely static, with no noticeable changes in equipment positions or the rubble pile.
      9:15 PM PT

      The scene remains largely static, with no noticeable changes in equipment positions or the rubble pile.

    2. Construction camera frame at 9:00 PM PT. No construction activity — the site is quiet.
      9:00 PM PT

      No construction activity — the site is quiet.

    3. Construction camera frame at 8:45 PM PT. No construction activity — the site is quiet.
      8:45 PM PT

      No construction activity — the site is quiet.

    4. Construction camera frame at 8:30 PM PT. No construction activity — the site is quiet.
      8:30 PM PT

      No construction activity — the site is quiet.

    5. Construction camera frame at 8:15 PM PT. No construction activity — the site is quiet.
      8:15 PM PT

      No construction activity — the site is quiet.

    6. Construction camera frame at 8:00 PM PT. No construction activity — the site is quiet.
      8:00 PM PT

      No construction activity — the site is quiet.

    7. Construction camera frame at 7:45 PM PT. No construction activity — the site is quiet.
      7:45 PM PT

      No construction activity — the site is quiet.

    8. Construction camera frame at 7:30 PM PT. No construction activity — the site is quiet.
      7:30 PM PT

      No construction activity — the site is quiet.

    9. Construction camera frame at 7:15 PM PT. No construction activity — the site is quiet.
      7:15 PM PT

      No construction activity — the site is quiet.

    10. Construction camera frame at 7:00 PM PT. No construction activity — the site is quiet.
      7:00 PM PT

      No construction activity — the site is quiet.

    11. Construction camera frame at 6:45 PM PT. No visible changes have occurred across the site or staging area.
      6:45 PM PT

      No visible changes have occurred across the site or staging area.

  5. Construction camera frame at 6:30 PM PT. There’s a slight repositioning of materials in the upper-left staging area, with a loader now facing a different direction.
    6:30 PM PT

    There’s a slight repositioning of materials in the upper-left staging area, with a loader now facing a different direction.

  6. Construction camera frame at 6:15 PM PT. The rubble pile has visibly grown, with the excavator actively feeding it new debris from the remaining structure.
    6:15 PM PT

    The rubble pile has visibly grown, with the excavator actively feeding it new debris from the remaining structure.

  7. Construction camera frame at 6:00 PM PT. The site’s arrangement of equipment and debris remains consistent, showing no significant alterations in the last quarter hour.
    6:00 PM PT

    The site’s arrangement of equipment and debris remains consistent, showing no significant alterations in the last quarter hour.

  8. Construction camera frame at 5:45 PM PT. The demolition site appears stable, with no readily visible shifts in machinery or rubble distribution.
    5:45 PM PT

    The demolition site appears stable, with no readily visible shifts in machinery or rubble distribution.

  9. Construction camera frame at 5:30 PM PT. The site continues to show little to no demonstrable progress in the last fifteen minutes.
    5:30 PM PT

    The site continues to show little to no demonstrable progress in the last fifteen minutes.

  10. 7 similar no-change frames3:45 PM–5:15 PM PT

    No visible change was reported between sampled frames; continuous inactivity cannot be inferred.

    1. Construction camera frame at 5:15 PM PT. The scene is holding steady, with no noticeable alterations to the equipment layout or debris field.
      5:15 PM PT

      The scene is holding steady, with no noticeable alterations to the equipment layout or debris field.

    2. Construction camera frame at 5:00 PM PT. The scene remains largely unchanged, with equipment and debris appearing in similar arrangements as before.
      5:00 PM PT

      The scene remains largely unchanged, with equipment and debris appearing in similar arrangements as before.

    3. Construction camera frame at 4:45 PM PT. The site’s appearance is remarkably consistent, with no observable changes to the position of equipment or the size of the debris pile.
      4:45 PM PT

      The site’s appearance is remarkably consistent, with no observable changes to the position of equipment or the size of the debris pile.

    4. Construction camera frame at 4:30 PM PT. The overall scene presents a very similar picture, with no apparent shifts in equipment or demolition progress.
      4:30 PM PT

      The overall scene presents a very similar picture, with no apparent shifts in equipment or demolition progress.

    5. Construction camera frame at 4:15 PM PT. The site shows minimal movement, with all machinery appearing to remain in the same locations.
      4:15 PM PT

      The site shows minimal movement, with all machinery appearing to remain in the same locations.

    6. Construction camera frame at 4:00 PM PT. The demolition site appears static, with no discernible adjustments to machinery or debris piles over the last quarter hour.
      4:00 PM PT

      The demolition site appears static, with no discernible adjustments to machinery or debris piles over the last quarter hour.

    7. Construction camera frame at 3:45 PM PT. Equipment remains in largely the same positions, though the excavator now appears to be slightly lower to the ground.
      3:45 PM PT

      Equipment remains in largely the same positions, though the excavator now appears to be slightly lower to the ground.

  11. Construction camera frame at 3:30 PM PT. The site maintains a consistent appearance, with no obvious alterations to equipment positions or the demolition progress.
    3:30 PM PT

    The site maintains a consistent appearance, with no obvious alterations to equipment positions or the demolition progress.

  12. 2 similar no-change frames3:00 PM–3:15 PM PT

    No visible change was reported between sampled frames; continuous inactivity cannot be inferred.

    1. Construction camera frame at 3:15 PM PT. The scene remains largely unchanged, with the excavator still positioned over the rubble pile.
      3:15 PM PT

      The scene remains largely unchanged, with the excavator still positioned over the rubble pile.

    2. Construction camera frame at 3:00 PM PT. No new activity is visible across the site or in the staging area.
      3:00 PM PT

      No new activity is visible across the site or in the staging area.

  13. Construction camera frame at 2:45 PM PT. The excavator has paused its work, now stationary above the growing central rubble pile.
    2:45 PM PT

    The excavator has paused its work, now stationary above the growing central rubble pile.

  14. Construction camera frame at 2:30 PM PT. The staging area shows a slight shift, with a loader now positioned closer to the driveway on the left.
    2:30 PM PT

    The staging area shows a slight shift, with a loader now positioned closer to the driveway on the left.

  15. Construction camera frame at 2:15 PM PT. The site appears static, with no discernible movement of equipment or change in the debris field over the last quarter hour.
    2:15 PM PT

    The site appears static, with no discernible movement of equipment or change in the debris field over the last quarter hour.

  16. Construction camera frame at 2:00 PM PT. The debris pile has visibly increased in size, as the excavator continues to break down the remaining structure.
    2:00 PM PT

    The debris pile has visibly increased in size, as the excavator continues to break down the remaining structure.

  17. Construction camera frame at 1:45 PM PT. The excavator near the remaining structure is now digging at a slightly lower level, and the debris pile appears incrementally larger.
    1:45 PM PT

    The excavator near the remaining structure is now digging at a slightly lower level, and the debris pile appears incrementally larger.

  18. Construction camera frame at 1:30 PM PT. The scene remains largely unchanged, with equipment positioned as it was moments ago.
    1:30 PM PT

    The scene remains largely unchanged, with equipment positioned as it was moments ago.

  19. Construction camera frame at 1:15 PM PT. The main excavator appears to have shifted its focus again, now working on the lower section of the remaining structure.
    1:15 PM PT

    The main excavator appears to have shifted its focus again, now working on the lower section of the remaining structure.

  20. Construction camera frame at 1:00 PM PT. Demolition work continues, with the main excavator now concentrating its efforts on a different section of the building’s remains.
    1:00 PM PT

    Demolition work continues, with the main excavator now concentrating its efforts on a different section of the building’s remains.

  21. Construction camera frame at 12:45 PM PT. A dump truck is exiting the job site via the service road on the right side of the frame.
    12:45 PM PT

    A dump truck is exiting the job site via the service road on the right side of the frame.

  22. Construction camera frame at 12:30 PM PT. The excavator is now positioned slightly differently, working on a new part of the structure, and the debris pile has grown a bit more.
    12:30 PM PT

    The excavator is now positioned slightly differently, working on a new part of the structure, and the debris pile has grown a bit more.

  23. Construction camera frame at 12:15 PM PT. The loader in the upper-left staging area is now actively moving debris, and a second, smaller excavator is visible near the rubble pile.
    12:15 PM PT

    The loader in the upper-left staging area is now actively moving debris, and a second, smaller excavator is visible near the rubble pile.

  24. Construction camera frame at 12:00 PM PT. The excavator now appears to be focused on a different section of the remaining building, and the rubble pile has visibly expanded.
    12:00 PM PT

    The excavator now appears to be focused on a different section of the remaining building, and the rubble pile has visibly expanded.

  25. Construction camera frame at 11:45 AM PT. A white pickup truck has appeared near the driveway on the left side of the frame.
    11:45 AM PT

    A white pickup truck has appeared near the driveway on the left side of the frame.

  26. Construction camera frame at 11:30 AM PT. The scene appears largely unchanged, though the rubble pile has grown slightly as demolition continues.
    11:30 AM PT

    The scene appears largely unchanged, though the rubble pile has grown slightly as demolition continues.

  27. Construction camera frame at 11:15 AM PT. Activity on site remains steady, with the excavator continuing to dismantle the structure and the rubble pile growing incrementally.
    11:15 AM PT

    Activity on site remains steady, with the excavator continuing to dismantle the structure and the rubble pile growing incrementally.

  28. Construction camera frame at 11:00 AM PT. A blue dump truck has entered the site via the service road on the right, positioning itself near the staging area.
    11:00 AM PT

    A blue dump truck has entered the site via the service road on the right, positioning itself near the staging area.

  29. Construction camera frame at 10:45 AM PT. The excavator has shifted position again, now working on the far side of the remaining structure, and the rubble pile continues to accumulate.
    10:45 AM PT

    The excavator has shifted position again, now working on the far side of the remaining structure, and the rubble pile continues to accumulate.

  30. Construction camera frame at 10:30 AM PT. A dump truck is now positioned in the staging area, receiving debris from the excavator.
    10:30 AM PT

    A dump truck is now positioned in the staging area, receiving debris from the excavator.

  31. Construction camera frame at 10:15 AM PT. The excavator is working at the base of the remaining structure, and the rubble pile shows a slight increase in size.
    10:15 AM PT

    The excavator is working at the base of the remaining structure, and the rubble pile shows a slight increase in size.

  32. Construction camera frame at 10:00 AM PT. The excavator is now positioned slightly further to the right, continuing to break down the remaining structure, and the rubble pile appears a bit larger.
    10:00 AM PT

    The excavator is now positioned slightly further to the right, continuing to break down the remaining structure, and the rubble pile appears a bit larger.

  33. Construction camera frame at 9:45 AM PT. The excavator appears to be working a different section of the remaining structure, and the rubble pile has expanded slightly.
    9:45 AM PT

    The excavator appears to be working a different section of the remaining structure, and the rubble pile has expanded slightly.

  34. Construction camera frame at 9:30 AM PT. The rubble pile has grown noticeably, with the excavator continuing to deposit debris into it.
    9:30 AM PT

    The rubble pile has grown noticeably, with the excavator continuing to deposit debris into it.

  35. Construction camera frame at 9:15 AM PT. The excavator is actively working, and a noticeable amount of debris has been added to the central rubble pile.
    9:15 AM PT

    The excavator is actively working, and a noticeable amount of debris has been added to the central rubble pile.

  36. Construction camera frame at 9:00 AM PT. A dump truck is exiting the site via the driveway on the left.
    9:00 AM PT

    A dump truck is exiting the site via the driveway on the left.

  37. Construction camera frame at 8:45 AM PT. The scene remains largely unchanged, with equipment holding its positions and no visible demolition progress.
    8:45 AM PT

    The scene remains largely unchanged, with equipment holding its positions and no visible demolition progress.

  38. Construction camera frame at 8:30 AM PT. The excavator is actively feeding material into the growing rubble pile, and a dump truck is now positioned in the upper-left staging area.
    8:30 AM PT

    The excavator is actively feeding material into the growing rubble pile, and a dump truck is now positioned in the upper-left staging area.

  39. Construction camera frame at 8:15 AM PT. The excavator continues to work at the rubble pile, though the debris field doesn't appear to have changed significantly.
    8:15 AM PT

    The excavator continues to work at the rubble pile, though the debris field doesn't appear to have changed significantly.

  40. Construction camera frame at 8:00 AM PT. The excavator is still working at the rubble pile, and the debris field appears slightly larger.
    8:00 AM PT

    The excavator is still working at the rubble pile, and the debris field appears slightly larger.

  41. Construction camera frame at 7:45 AM PT. The rubble pile has visibly grown as the excavator continues to dismantle the remaining structure.
    7:45 AM PT

    The rubble pile has visibly grown as the excavator continues to dismantle the remaining structure.

  42. Construction camera frame at 7:30 AM PT. A small loader has moved from the upper-left staging area and is now positioned near the rubble pile.
    7:30 AM PT

    A small loader has moved from the upper-left staging area and is now positioned near the rubble pile.

  43. Construction camera frame at 7:15 AM PT. An excavator is now active in the center of the frame, working on the remaining walls of the structure.
    7:15 AM PT

    An excavator is now active in the center of the frame, working on the remaining walls of the structure.

  44. 3 similar no-change frames6:30 AM–7:00 AM PT

    No visible change was reported between sampled frames; continuous inactivity cannot be inferred.

    1. Construction camera frame at 7:00 AM PT. No visible changes have occurred across the site or in the staging area.
      7:00 AM PT

      No visible changes have occurred across the site or in the staging area.

    2. Construction camera frame at 6:45 AM PT. No construction activity — the site is quiet.
      6:45 AM PT

      No construction activity — the site is quiet.

    3. Construction camera frame at 6:30 AM PT. The site maintains a steady appearance, with no significant alterations to the debris or equipment arrangement.
      6:30 AM PT

      The site maintains a steady appearance, with no significant alterations to the debris or equipment arrangement.

  45. Construction camera frame at 6:15 AM PT. The demolition site presents a largely consistent view, with equipment and the debris pile holding their positions.
    6:15 AM PT

    The demolition site presents a largely consistent view, with equipment and the debris pile holding their positions.

  46. Construction camera frame at 6:00 AM PT. The site looks quite static, with machinery and debris remaining in roughly the same arrangement.
    6:00 AM PT

    The site looks quite static, with machinery and debris remaining in roughly the same arrangement.

  47. Construction camera frame at 5:45 AM PT. Several white service vehicles are now parked in the upper-left staging area, near the fencing.
    5:45 AM PT

    Several white service vehicles are now parked in the upper-left staging area, near the fencing.

  48. Construction camera frame at 5:30 AM PT. The demolition site remains in a similar state, with no obvious shifts in equipment or debris.
    5:30 AM PT

    The demolition site remains in a similar state, with no obvious shifts in equipment or debris.

  49. Construction camera frame at 5:15 AM PT. The scene appears largely unchanged, with equipment remaining in the same positions as before.
    5:15 AM PT

    The scene appears largely unchanged, with equipment remaining in the same positions as before.

  50. Construction camera frame at 5:00 AM PT. The rubble pile has visibly grown, with more debris now scattered across the center of the site.
    5:00 AM PT

    The rubble pile has visibly grown, with more debris now scattered across the center of the site.

  51. Construction camera frame at 4:45 AM PT. Visibility has improved, revealing the dark demolition site and surrounding streets.
    4:45 AM PT

    Visibility has improved, revealing the dark demolition site and surrounding streets.

  52. 5 similar no-change frames12:00 AM–4:00 AM PT

    No visible change was reported between sampled frames; continuous inactivity cannot be inferred.

    1. Construction camera frame at 4:00 AM PT. No construction activity — the site is quiet.
      4:00 AM PT

      No construction activity — the site is quiet.

    2. Construction camera frame at 3:00 AM PT. No construction activity — the site is quiet.
      3:00 AM PT

      No construction activity — the site is quiet.

    3. Construction camera frame at 2:00 AM PT. No construction activity — the site is quiet.
      2:00 AM PT

      No construction activity — the site is quiet.

    4. Construction camera frame at 1:00 AM PT. No construction activity — the site is quiet.
      1:00 AM PT

      No construction activity — the site is quiet.

    5. Construction camera frame at 12:00 AM PT. No construction activity — the site is quiet.
      12:00 AM PT

      No construction activity — the site is quiet.

← Jun 11All daysJun 13 →