606

606 (& 620) 106th Ave NE, Bellevue, WA

An independent guide to the Onni 606 development.

Project

  • Overview
  • Live cam
  • Live data
  • Construction log
  • The Towers
  • Skyline & height
  • Timeline
  • Gallery

Context

  • History of the block
  • Location
  • Developer
  • All of Bellevue ↗

Help

  • FAQ
  • Glossary
  • Sources & press
  • Contact
  • Updates feed
  • Sitemap

This is an independent, informational fan site. It is not affiliated with, sponsored by, or endorsed by Onni Group. Figures are compiled from public reporting and are approximate and subject to change. Project names and trademarks belong to their respective owners.

© 2026 onni606.com — built by an enthusiast.

  1. Home
  2. /Construction log
  3. /Wednesday, June 24, 2026

Construction log

Wednesday, June 24, 2026

74 snapshots from the live camera.

Onni 606 · project recordDowntown Bellevue

AI digest

The rubble pile grew slightly throughout the day, with a white box truck, a dump truck, and two red vehicles entering and maneuvering around the site.

▶ Play this day as a timelapse
  1. No construction activity — the site is quiet.
    11:00 PM PT

    No construction activity — the site is quiet.

  2. No construction activity — the site is quiet.
    10:00 PM PT

    No construction activity — the site is quiet.

  3. No construction activity — the site is quiet.
    9:30 PM PT

    No construction activity — the site is quiet.

  4. No construction activity — the site is quiet.
    9:15 PM PT

    No construction activity — the site is quiet.

  5. No construction activity — the site is quiet.
    9:00 PM PT

    No construction activity — the site is quiet.

  6. No construction activity — the site is quiet.
    8:45 PM PT

    No construction activity — the site is quiet.

  7. No construction activity — the site is quiet.
    8:30 PM PT

    No construction activity — the site is quiet.

  8. No construction activity — the site is quiet.
    8:15 PM PT

    No construction activity — the site is quiet.

  9. No construction activity — the site is quiet.
    8:00 PM PT

    No construction activity — the site is quiet.

  10. No construction activity — the site is quiet.
    7:45 PM PT

    No construction activity — the site is quiet.

  11. No construction activity — the site is quiet.
    7:30 PM PT

    No construction activity — the site is quiet.

  12. No construction activity — the site is quiet.
    7:15 PM PT

    No construction activity — the site is quiet.

  13. No construction activity — the site is quiet.
    7:00 PM PT

    No construction activity — the site is quiet.

  14. The scene is holding steady, with no noticeable alterations to the equipment or the debris field.
    6:45 PM PT

    The scene is holding steady, with no noticeable alterations to the equipment or the debris field.

  15. The site presents a remarkably similar view to the last check, with no discernible shifts in equipment placement or debris accumulation.
    6:30 PM PT

    The site presents a remarkably similar view to the last check, with no discernible shifts in equipment placement or debris accumulation.

  16. The site remains largely unchanged, with equipment and the rubble pile holding their positions.
    6:15 PM PT

    The site remains largely unchanged, with equipment and the rubble pile holding their positions.

  17. The overall layout of the site remains consistent, though a small loader has moved slightly within the upper-left staging area.
    6:00 PM PT

    The overall layout of the site remains consistent, though a small loader has moved slightly within the upper-left staging area.

  18. The site shows very little difference from the previous view, with all equipment and the debris pile remaining in the same positions.
    5:45 PM PT

    The site shows very little difference from the previous view, with all equipment and the debris pile remaining in the same positions.

  19. The scene appears stable, with no readily apparent alterations to the arrangement of equipment or the size of the debris pile.
    5:30 PM PT

    The scene appears stable, with no readily apparent alterations to the arrangement of equipment or the size of the debris pile.

  20. The demolition site maintains its current state, with no apparent movement of equipment or substantial changes to the debris.
    5:15 PM PT

    The demolition site maintains its current state, with no apparent movement of equipment or substantial changes to the debris.

  21. The demolition site continues at the same pace, showing no significant shifts in the position of equipment or the volume of debris.
    5:00 PM PT

    The demolition site continues at the same pace, showing no significant shifts in the position of equipment or the volume of debris.

  22. The site presents a similar view as before, with no obvious movement of machinery or significant changes to the debris.
    4:45 PM PT

    The site presents a similar view as before, with no obvious movement of machinery or significant changes to the debris.

  23. The scene remains largely unchanged, with the equipment and debris field holding their previous positions.
    4:30 PM PT

    The scene remains largely unchanged, with the equipment and debris field holding their previous positions.

  24. The site is holding steady, with no immediately visible adjustments to the equipment or debris layout.
    4:15 PM PT

    The site is holding steady, with no immediately visible adjustments to the equipment or debris layout.

  25. The demolition site shows minimal variation, with everything appearing to remain in the same location as before.
    4:00 PM PT

    The demolition site shows minimal variation, with everything appearing to remain in the same location as before.

  26. The site appears quiet, with no noticeable alterations in the arrangement of equipment or the size of the rubble pile.
    3:45 PM PT

    The site appears quiet, with no noticeable alterations in the arrangement of equipment or the size of the rubble pile.

  27. The site maintains a steady state, with no discernible changes in equipment or debris arrangement.
    3:30 PM PT

    The site maintains a steady state, with no discernible changes in equipment or debris arrangement.

  28. Nothing has shifted across the site since the last update.
    3:15 PM PT

    Nothing has shifted across the site since the last update.

  29. The demolition site presents a remarkably stable picture, with no obvious shifts in the positions of machinery or debris.
    3:00 PM PT

    The demolition site presents a remarkably stable picture, with no obvious shifts in the positions of machinery or debris.

  30. The scene remains largely consistent, with no immediately apparent alterations to the site’s layout or equipment positioning.
    2:45 PM PT

    The scene remains largely consistent, with no immediately apparent alterations to the site’s layout or equipment positioning.

  31. The overall layout of the demolition site appears unchanged, with equipment remaining in the same positions.
    2:30 PM PT

    The overall layout of the demolition site appears unchanged, with equipment remaining in the same positions.

  32. A red vehicle has exited the site via the right-side service road, now visible parked along the curb outside the fenced perimeter.
    2:15 PM PT

    A red vehicle has exited the site via the right-side service road, now visible parked along the curb outside the fenced perimeter.

  33. A red vehicle has pulled forward from the staging area and is now positioned closer to the central demolition zone.
    2:00 PM PT

    A red vehicle has pulled forward from the staging area and is now positioned closer to the central demolition zone.

  34. A small red piece of machinery has moved from the upper-left staging area and is now positioned near the center of the demolition zone.
    1:45 PM PT

    A small red piece of machinery has moved from the upper-left staging area and is now positioned near the center of the demolition zone.

  35. The site continues to display a consistent scene, with no discernible changes in equipment or debris levels.
    1:30 PM PT

    The site continues to display a consistent scene, with no discernible changes in equipment or debris levels.

  36. The site’s appearance is remarkably stable, showing no obvious shifts in equipment placement or debris accumulation.
    1:15 PM PT

    The site’s appearance is remarkably stable, showing no obvious shifts in equipment placement or debris accumulation.

  37. The scene remains largely consistent, with no notable movement of equipment or significant changes to the debris field.
    1:00 PM PT

    The scene remains largely consistent, with no notable movement of equipment or significant changes to the debris field.

  38. The overall layout of the demolition site appears unchanged, with machinery and the debris pile holding their positions.
    12:45 PM PT

    The overall layout of the demolition site appears unchanged, with machinery and the debris pile holding their positions.

  39. A yellow dump truck has entered the site via the service road on the right and is maneuvering toward the staging area.
    12:30 PM PT

    A yellow dump truck has entered the site via the service road on the right and is maneuvering toward the staging area.

  40. The site presents a static view, with no apparent shifts in the location of machinery or the size of the debris pile.
    12:15 PM PT

    The site presents a static view, with no apparent shifts in the location of machinery or the size of the debris pile.

  41. The demolition site shows minimal alteration, with equipment and debris remaining in roughly the same positions.
    12:00 PM PT

    The demolition site shows minimal alteration, with equipment and debris remaining in roughly the same positions.

  42. The two red vehicles previously near the staging area have moved further into the demolition zone.
    11:45 AM PT

    The two red vehicles previously near the staging area have moved further into the demolition zone.

  43. Two red vehicles have entered the site via the driveway on the left, and are now positioned near the staging area.
    11:30 AM PT

    Two red vehicles have entered the site via the driveway on the left, and are now positioned near the staging area.

  44. The scene remains largely as it was, showing no significant movement of equipment or visible changes to the debris.
    11:15 AM PT

    The scene remains largely as it was, showing no significant movement of equipment or visible changes to the debris.

  45. The overall layout of the demolition site is consistent, with no immediately visible alterations in equipment or debris.
    11:00 AM PT

    The overall layout of the demolition site is consistent, with no immediately visible alterations in equipment or debris.

  46. The scene appears remarkably stable, with no noticeable shifts in equipment placement or debris accumulation.
    10:45 AM PT

    The scene appears remarkably stable, with no noticeable shifts in equipment placement or debris accumulation.

  47. The site presents a largely static view, with the equipment and debris arrangement appearing unchanged from the previous frame.
    10:30 AM PT

    The site presents a largely static view, with the equipment and debris arrangement appearing unchanged from the previous frame.

  48. The rubble pile appears slightly larger, with more debris accumulated in the center of the site.
    10:15 AM PT

    The rubble pile appears slightly larger, with more debris accumulated in the center of the site.

  49. A yellow loader has moved further into the staging area in the upper-left, near the parked dump trucks. Otherwise, the site's arrangement of equipment and debris appears to be holding steady.
    10:00 AM PT

    A yellow loader has moved further into the staging area in the upper-left, near the parked dump trucks. Otherwise, the site's arrangement of equipment and debris appears to be holding steady.

  50. The demolition site remains quiet, showing no discernible alterations in the positioning of machinery or the size of the debris pile.
    9:45 AM PT

    The demolition site remains quiet, showing no discernible alterations in the positioning of machinery or the size of the debris pile.

  51. The site maintains a consistent appearance, with no readily apparent movement of equipment or changes to the debris.
    9:30 AM PT

    The site maintains a consistent appearance, with no readily apparent movement of equipment or changes to the debris.

  52. A lone dump truck has entered the site via the service road on the right. Otherwise, the overall scene remains consistent, with the equipment and debris maintaining their previous arrangement.
    9:15 AM PT

    A lone dump truck has entered the site via the service road on the right. Otherwise, the overall scene remains consistent, with the equipment and debris maintaining their previous arrangement.

  53. The scene appears largely unchanged, with equipment and the rubble pile maintaining their previous positions.
    9:00 AM PT

    The scene appears largely unchanged, with equipment and the rubble pile maintaining their previous positions.

  54. The scene is holding a stable configuration, with no obvious shifts in equipment or the debris field.
    8:45 AM PT

    The scene is holding a stable configuration, with no obvious shifts in equipment or the debris field.

  55. The demolition site presents a similar view as before, with no significant alterations to the equipment or debris arrangement.
    8:30 AM PT

    The demolition site presents a similar view as before, with no significant alterations to the equipment or debris arrangement.

  56. The staging area shows a slight rearrangement, with a dark-colored loader now positioned closer to the driveway.
    8:15 AM PT

    The staging area shows a slight rearrangement, with a dark-colored loader now positioned closer to the driveway.

  57. The rubble pile seems to have grown slightly, with a more defined shape emerging in the center of the site.
    8:00 AM PT

    The rubble pile seems to have grown slightly, with a more defined shape emerging in the center of the site.

  58. The site remains remarkably consistent, showing no detectable changes in equipment positioning or the size of the debris pile.
    7:45 AM PT

    The site remains remarkably consistent, showing no detectable changes in equipment positioning or the size of the debris pile.

  59. The site holds a steady appearance, with equipment and rubble remaining in the same positions.
    7:30 AM PT

    The site holds a steady appearance, with equipment and rubble remaining in the same positions.

  60. The site appears largely unchanged, maintaining the same arrangement of equipment and debris.
    7:15 AM PT

    The site appears largely unchanged, maintaining the same arrangement of equipment and debris.

  61. The scene remains static, with no apparent movement of machinery or changes to the debris field.
    7:00 AM PT

    The scene remains static, with no apparent movement of machinery or changes to the debris field.

  62. A white box truck has entered the site via the driveway on the left, parking near the staging area.
    6:45 AM PT

    A white box truck has entered the site via the driveway on the left, parking near the staging area.

  63. The site presents a consistent view, with no noticeable shifts in equipment or debris accumulation.
    6:30 AM PT

    The site presents a consistent view, with no noticeable shifts in equipment or debris accumulation.

  64. The demolition site continues in a quiet state, showing no discernible alterations in equipment placement or debris levels.
    6:15 AM PT

    The demolition site continues in a quiet state, showing no discernible alterations in equipment placement or debris levels.

  65. No observable activity or changes have occurred across the site.
    6:00 AM PT

    No observable activity or changes have occurred across the site.

  66. Nothing has moved across the site since the last update.
    5:45 AM PT

    Nothing has moved across the site since the last update.

  67. The site appears remarkably unchanged, with equipment remaining in the same positions as before.
    5:30 AM PT

    The site appears remarkably unchanged, with equipment remaining in the same positions as before.

  68. The scene remains largely static, with no immediately apparent changes to the rubble pile or equipment positions.
    5:15 AM PT

    The scene remains largely static, with no immediately apparent changes to the rubble pile or equipment positions.

  69. Visibility has improved dramatically, revealing the full extent of the demolition site now bathed in light. The rubble pile appears slightly larger, and more of the lower levels are now exposed within the demolition zone.
    5:00 AM PT

    Visibility has improved dramatically, revealing the full extent of the demolition site now bathed in light. The rubble pile appears slightly larger, and more of the lower levels are now exposed within the demolition zone.

  70. No construction activity — the site is quiet.
    4:00 AM PT

    No construction activity — the site is quiet.

  71. No construction activity — the site is quiet.
    3:00 AM PT

    No construction activity — the site is quiet.

  72. No construction activity — the site is quiet.
    2:00 AM PT

    No construction activity — the site is quiet.

  73. No construction activity — the site is quiet.
    1:00 AM PT

    No construction activity — the site is quiet.

  74. No construction activity — the site is quiet.
    12:00 AM PT

    No construction activity — the site is quiet.

← Jun 23All daysJun 25 →