Skip to content
606Onni 606 · Bellevue
  • Live
  • Progress
  • Project
  • History
  • Search
606

606 (& 620) 106th Ave NE, Bellevue, WA

An independent guide to the Onni 606 development.

For the wider city, visit bellevue.wiki ↗

Project

  • Overview
  • Live cam
  • Latest progress
  • Construction log
  • News
  • Permit ledger
  • Construction impacts
  • The Towers
  • Skyline & height
  • Timeline
  • Gallery

Context

  • History of the block
  • Location
  • Developer

Help

  • Search the site
  • FAQ
  • Glossary
  • Sources & press
  • Contact
  • Updates feed
  • Sitemap

This is an independent, informational fan site. It is not affiliated with, sponsored by, or endorsed by Onni Group. Figures are compiled from public reporting and are approximate and subject to change. Project names and trademarks belong to their respective owners.

© 2026 onni606.com — built by an enthusiast.

  1. Home
  2. /Construction log
  3. /Thursday, June 25, 2026

Construction log

Thursday, June 25, 2026

72 snapshots from the live camera.


AI digest

The site was quiet overall, with no clear change to the ground or equipment layout; a truck and several smaller vehicles briefly moved through or repositioned near the staging area. Low light obscured detail, and the final view remains much like the first.

▶ Play this day as a timelapse
  1. Construction camera frame at 11:00 PM PT. No construction activity — the site is quiet.
    11:00 PM PT

    No construction activity — the site is quiet.

  2. 7 similar no-change frames8:00 PM–10:00 PM PT

    No visible change was reported between sampled frames; continuous inactivity cannot be inferred.

    1. Construction camera frame at 10:00 PM PT. No construction activity — the site is quiet.
      10:00 PM PT

      No construction activity — the site is quiet.

    2. Construction camera frame at 9:15 PM PT. No construction activity — the site is quiet.
      9:15 PM PT

      No construction activity — the site is quiet.

    3. Construction camera frame at 9:00 PM PT. No construction activity — the site is quiet.
      9:00 PM PT

      No construction activity — the site is quiet.

    4. Construction camera frame at 8:45 PM PT. No movement or progress is visible across the lot in this interval.
      8:45 PM PT

      No movement or progress is visible across the lot in this interval.

    5. Construction camera frame at 8:30 PM PT. The scene remains largely unchanged, though the lighting appears slightly different.
      8:30 PM PT

      The scene remains largely unchanged, though the lighting appears slightly different.

    6. Construction camera frame at 8:15 PM PT. The site looks much the same, with no noticeable shifts in the equipment or debris arrangement.
      8:15 PM PT

      The site looks much the same, with no noticeable shifts in the equipment or debris arrangement.

    7. Construction camera frame at 8:00 PM PT. The site maintains a consistent appearance, with no noticeable changes to equipment placement or demolition progress.
      8:00 PM PT

      The site maintains a consistent appearance, with no noticeable changes to equipment placement or demolition progress.

  3. Construction camera frame at 7:45 PM PT. The demolition site appears stable, with no readily apparent alterations in the positioning of equipment or the size of the rubble.
    7:45 PM PT

    The demolition site appears stable, with no readily apparent alterations in the positioning of equipment or the size of the rubble.

  4. Construction camera frame at 7:30 PM PT. The view is remarkably consistent, showing no clear progression in demolition or equipment repositioning.
    7:30 PM PT

    The view is remarkably consistent, showing no clear progression in demolition or equipment repositioning.

  5. Construction camera frame at 7:15 PM PT. The demolition site shows a nearly identical configuration to the previous view, with no apparent alterations in machinery or rubble.
    7:15 PM PT

    The demolition site shows a nearly identical configuration to the previous view, with no apparent alterations in machinery or rubble.

  6. Construction camera frame at 7:00 PM PT. The site presents a very similar view as before, with no obvious shifts in equipment or the extent of demolition debris.
    7:00 PM PT

    The site presents a very similar view as before, with no obvious shifts in equipment or the extent of demolition debris.

  7. Construction camera frame at 6:45 PM PT. The scene remains largely unchanged, with no discernible movement of machinery or growth of the debris pile.
    6:45 PM PT

    The scene remains largely unchanged, with no discernible movement of machinery or growth of the debris pile.

  8. Construction camera frame at 6:30 PM PT. Activity is minimal, though a small loader has shifted position slightly within the upper-left staging area.
    6:30 PM PT

    Activity is minimal, though a small loader has shifted position slightly within the upper-left staging area.

  9. Construction camera frame at 6:15 PM PT. The site appears quiet, with no noticeable changes to the equipment or debris arrangement over the last quarter hour.
    6:15 PM PT

    The site appears quiet, with no noticeable changes to the equipment or debris arrangement over the last quarter hour.

  10. Construction camera frame at 6:00 PM PT. The site maintains a stable appearance, lacking any significant alterations in equipment or debris arrangement.
    6:00 PM PT

    The site maintains a stable appearance, lacking any significant alterations in equipment or debris arrangement.

  11. Construction camera frame at 5:45 PM PT. The scene is remarkably consistent, showing no clear alterations to the equipment layout or the size of the rubble pile.
    5:45 PM PT

    The scene is remarkably consistent, showing no clear alterations to the equipment layout or the size of the rubble pile.

  12. Construction camera frame at 5:30 PM PT. The overall scene is holding steady, with no immediately apparent adjustments to the position of equipment or the debris field.
    5:30 PM PT

    The overall scene is holding steady, with no immediately apparent adjustments to the position of equipment or the debris field.

  13. Construction camera frame at 5:15 PM PT. The site presents a similar view as before, with no obvious shifts in equipment placement or debris accumulation.
    5:15 PM PT

    The site presents a similar view as before, with no obvious shifts in equipment placement or debris accumulation.

  14. 2 similar no-change frames4:45 PM–5:00 PM PT

    No visible change was reported between sampled frames; continuous inactivity cannot be inferred.

    1. Construction camera frame at 5:00 PM PT. The scene remains largely unchanged, with equipment and the debris pile holding their positions.
      5:00 PM PT

      The scene remains largely unchanged, with equipment and the debris pile holding their positions.

    2. Construction camera frame at 4:45 PM PT. The demolition site shows little discernible difference from the previous view, with equipment and debris remaining in roughly the same locations.
      4:45 PM PT

      The demolition site shows little discernible difference from the previous view, with equipment and debris remaining in roughly the same locations.

  15. Construction camera frame at 4:30 PM PT. The site appears quiet, with no readily visible changes to the positioning of machinery or the extent of the rubble.
    4:30 PM PT

    The site appears quiet, with no readily visible changes to the positioning of machinery or the extent of the rubble.

  16. 6 similar no-change frames2:30 PM–4:15 PM PT

    No visible change was reported between sampled frames; continuous inactivity cannot be inferred.

    1. Construction camera frame at 4:15 PM PT. The site remains stable, with no significant movement of equipment or noticeable increase in the debris pile since the last view.
      4:15 PM PT

      The site remains stable, with no significant movement of equipment or noticeable increase in the debris pile since the last view.

    2. Construction camera frame at 4:00 PM PT. A white van has entered the site via the driveway on the left, and is now parked near the staging area. Otherwise, the demolition site maintains a steady state with no apparent alterations to equipment or debris.
      4:00 PM PT

      A white van has entered the site via the driveway on the left, and is now parked near the staging area. Otherwise, the demolition site maintains a steady state with no apparent alterations to equipment or debris.

    3. Construction camera frame at 3:45 PM PT. The demolition progresses at a measured pace, with no significant changes to the equipment or debris field apparent in the latest view.
      3:45 PM PT

      The demolition progresses at a measured pace, with no significant changes to the equipment or debris field apparent in the latest view.

    4. Construction camera frame at 3:00 PM PT. The overall layout of the demolition site is consistent, with no noticeable shifts in equipment or debris levels.
      3:00 PM PT

      The overall layout of the demolition site is consistent, with no noticeable shifts in equipment or debris levels.

    5. Construction camera frame at 2:45 PM PT. The scene appears largely unchanged, with equipment and debris remaining in similar positions as before.
      2:45 PM PT

      The scene appears largely unchanged, with equipment and debris remaining in similar positions as before.

    6. Construction camera frame at 2:30 PM PT. The demolition site continues at a similar state, with no discernible alterations to the equipment or debris arrangement.
      2:30 PM PT

      The demolition site continues at a similar state, with no discernible alterations to the equipment or debris arrangement.

  17. Construction camera frame at 2:15 PM PT. The site’s appearance is remarkably consistent, showing no substantial changes in equipment positions or debris accumulation over the last quarter hour.
    2:15 PM PT

    The site’s appearance is remarkably consistent, showing no substantial changes in equipment positions or debris accumulation over the last quarter hour.

  18. Construction camera frame at 2:00 PM PT. The scene remains quite similar, with no immediate shifts in equipment placement or the size of the rubble.
    2:00 PM PT

    The scene remains quite similar, with no immediate shifts in equipment placement or the size of the rubble.

  19. Construction camera frame at 1:45 PM PT. The site holds steady, with no readily visible changes in machinery or the debris pile’s form.
    1:45 PM PT

    The site holds steady, with no readily visible changes in machinery or the debris pile’s form.

  20. Construction camera frame at 1:30 PM PT. A dark pickup truck has entered the site via the driveway on the left, parking near the staging area, and a small black car is now present on the service road along the right.
    1:30 PM PT

    A dark pickup truck has entered the site via the driveway on the left, parking near the staging area, and a small black car is now present on the service road along the right.

  21. Construction camera frame at 1:15 PM PT. The site presents a static view, with no obvious adjustments to the location of equipment or the rubble’s extent.
    1:15 PM PT

    The site presents a static view, with no obvious adjustments to the location of equipment or the rubble’s extent.

  22. Construction camera frame at 1:00 PM PT. The site appears largely as it was before, with no immediately noticeable movement of equipment or significant alteration of the debris field.
    1:00 PM PT

    The site appears largely as it was before, with no immediately noticeable movement of equipment or significant alteration of the debris field.

  23. Construction camera frame at 12:45 PM PT. The staging area shows a slight rearrangement of dumpsters and materials, but the overall layout of the site remains largely unchanged.
    12:45 PM PT

    The staging area shows a slight rearrangement of dumpsters and materials, but the overall layout of the site remains largely unchanged.

  24. Construction camera frame at 12:30 PM PT. The overall scene is remarkably consistent, showing no discernible adjustments in the positioning of machinery or the size of the debris pile.
    12:30 PM PT

    The overall scene is remarkably consistent, showing no discernible adjustments in the positioning of machinery or the size of the debris pile.

  25. Construction camera frame at 12:15 PM PT. The scene remains stable, with no apparent shifts in equipment placement or debris accumulation.
    12:15 PM PT

    The scene remains stable, with no apparent shifts in equipment placement or debris accumulation.

  26. Construction camera frame at 12:00 PM PT. A white dump truck has pulled away from the left-side driveway and is now visible further down the street, while a dark-colored sedan has entered the lot from the same entrance.
    12:00 PM PT

    A white dump truck has pulled away from the left-side driveway and is now visible further down the street, while a dark-colored sedan has entered the lot from the same entrance.

  27. 2 similar no-change frames11:30 AM–11:45 AM PT

    No visible change was reported between sampled frames; continuous inactivity cannot be inferred.

    1. Construction camera frame at 11:45 AM PT. EverythingL laอีก No activity is visible across the lot or staging area, and the site相同的 layout persists.
      11:45 AM PT

      EverythingL laอีก No activity is visible across the lot or staging area, and the site相同的 layout persists.

    2. Construction camera frame at 11:30 AM PT. The demolition site shows no significant differences from the last check, with all equipment remaining in the same positions.
      11:30 AM PT

      The demolition site shows no significant differences from the last check, with all equipment remaining in the same positions.

  28. Construction camera frame at 11:15 AM PT. The site continues in a similar condition, with no clear alterations to the position of equipment or the amount of debris.
    11:15 AM PT

    The site continues in a similar condition, with no clear alterations to the position of equipment or the amount of debris.

  29. 3 similar no-change frames10:30 AM–11:00 AM PT

    No visible change was reported between sampled frames; continuous inactivity cannot be inferred.

    1. Construction camera frame at 11:00 AM PT. The site appears largely unchanged, maintaining the same arrangement of equipment and debris as before.
      11:00 AM PT

      The site appears largely unchanged, maintaining the same arrangement of equipment and debris as before.

    2. Construction camera frame at 10:45 AM PT. The site presents a remarkably similar appearance to the previous view, with no discernible movement of equipment or changes to the debris field.
      10:45 AM PT

      The site presents a remarkably similar appearance to the previous view, with no discernible movement of equipment or changes to the debris field.

    3. Construction camera frame at 10:30 AM PT. The demolition site is holding steady, with no visible shifts in equipment or debris accumulation.
      10:30 AM PT

      The demolition site is holding steady, with no visible shifts in equipment or debris accumulation.

  30. Construction camera frame at 10:15 AM PT. The scene remains stable, with no noticeable adjustments to the positioning of equipment or the size of the debris pile.
    10:15 AM PT

    The scene remains stable, with no noticeable adjustments to the positioning of equipment or the size of the debris pile.

  31. Construction camera frame at 10:00 AM PT. The site maintains its current state, with no readily apparent changes in the location of machinery or the accumulation of debris.
    10:00 AM PT

    The site maintains its current state, with no readily apparent changes in the location of machinery or the accumulation of debris.

  32. 4 similar no-change frames9:00 AM–9:45 AM PT

    No visible change was reported between sampled frames; continuous inactivity cannot be inferred.

    1. Construction camera frame at 9:45 AM PT. The view remains consistent, showing no significant alterations in equipment placement or the volume of rubble.
      9:45 AM PT

      The view remains consistent, showing no significant alterations in equipment placement or the volume of rubble.

    2. Construction camera frame at 9:30 AM PT. The demolition site shows no appreciable difference from the last check-in, with all equipment and debris remaining static.
      9:30 AM PT

      The demolition site shows no appreciable difference from the last check-in, with all equipment and debris remaining static.

    3. Construction camera frame at 9:15 AM PT. The site appears largely unchanged, with equipment and debris remaining in the same positions as before.
      9:15 AM PT

      The site appears largely unchanged, with equipment and debris remaining in the same positions as before.

    4. Construction camera frame at 9:00 AM PT. The site presents a nearly identical view, with no discernible movement of equipment or alterations to the debris.
      9:00 AM PT

      The site presents a nearly identical view, with no discernible movement of equipment or alterations to the debris.

  33. Construction camera frame at 8:45 AM PT. The scene is holding steady, with no obvious changes to the equipment layout or the extent of the demolition debris.
    8:45 AM PT

    The scene is holding steady, with no obvious changes to the equipment layout or the extent of the demolition debris.

  34. Construction camera frame at 8:30 AM PT. The demolition site remains remarkably consistent, with no immediately noticeable shifts in the positioning of equipment or the size of the debris field.
    8:30 AM PT

    The demolition site remains remarkably consistent, with no immediately noticeable shifts in the positioning of equipment or the size of the debris field.

  35. Construction camera frame at 8:15 AM PT. The staging area shows a slight rearrangement of equipment, with a loader now positioned closer to the central rubble pile.
    8:15 AM PT

    The staging area shows a slight rearrangement of equipment, with a loader now positioned closer to the central rubble pile.

  36. Construction camera frame at 8:00 AM PT. The site continues without significant alteration, maintaining its current arrangement of equipment and debris.
    8:00 AM PT

    The site continues without significant alteration, maintaining its current arrangement of equipment and debris.

  37. Construction camera frame at 7:45 AM PT. Everything on site appears to be holding its position, with no readily visible alterations to the debris or machinery.
    7:45 AM PT

    Everything on site appears to be holding its position, with no readily visible alterations to the debris or machinery.

  38. 2 similar no-change frames7:15 AM–7:30 AM PT

    No visible change was reported between sampled frames; continuous inactivity cannot be inferred.

    1. Construction camera frame at 7:30 AM PT. The demolition site appears largely static, with the position of machinery and the debris pile remaining consistent.
      7:30 AM PT

      The demolition site appears largely static, with the position of machinery and the debris pile remaining consistent.

    2. Construction camera frame at 7:15 AM PT. The demolition site presents a largely unchanged view, with equipment and debris remaining in similar positions.
      7:15 AM PT

      The demolition site presents a largely unchanged view, with equipment and debris remaining in similar positions.

  39. Construction camera frame at 7:00 AM PT. The scene holds steady, with no obvious adjustments to equipment placement or the accumulation of debris.
    7:00 AM PT

    The scene holds steady, with no obvious adjustments to equipment placement or the accumulation of debris.

  40. Construction camera frame at 6:45 AM PT. A single dump truck has entered the site via the driveway on the left, and is now maneuvering in the upper staging area.
    6:45 AM PT

    A single dump truck has entered the site via the driveway on the left, and is now maneuvering in the upper staging area.

  41. Construction camera frame at 6:30 AM PT. The site remains remarkably consistent, exhibiting no noticeable changes in the position of equipment or the amount of rubble.
    6:30 AM PT

    The site remains remarkably consistent, exhibiting no noticeable changes in the position of equipment or the amount of rubble.

  42. Construction camera frame at 6:15 AM PT. The staging area shows a slight reshuffling of materials, with a couple of dumpsters now positioned closer to the service road.
    6:15 AM PT

    The staging area shows a slight reshuffling of materials, with a couple of dumpsters now positioned closer to the service road.

  43. Construction camera frame at 6:00 AM PT. The scene continues without significant alteration, maintaining the same arrangement of equipment and debris.
    6:00 AM PT

    The scene continues without significant alteration, maintaining the same arrangement of equipment and debris.

  44. 2 similar no-change frames5:30 AM–5:45 AM PT

    No visible change was reported between sampled frames; continuous inactivity cannot be inferred.

    1. Construction camera frame at 5:45 AM PT. The site appears stable, with no discernible movement of machinery or significant alteration of the debris field.
      5:45 AM PT

      The site appears stable, with no discernible movement of machinery or significant alteration of the debris field.

    2. Construction camera frame at 5:30 AM PT. The demolition site presents a still picture, with no apparent shifts in equipment positioning or debris levels.
      5:30 AM PT

      The demolition site presents a still picture, with no apparent shifts in equipment positioning or debris levels.

  45. Construction camera frame at 5:15 AM PT. The scene is holding steady, with no immediately noticeable changes in equipment or the rubble pile.
    5:15 AM PT

    The scene is holding steady, with no immediately noticeable changes in equipment or the rubble pile.

  46. Construction camera frame at 5:00 AM PT. The site remains largely unchanged, with darkness obscuring detailed activity.
    5:00 AM PT

    The site remains largely unchanged, with darkness obscuring detailed activity.

  47. Construction camera frame at 4:45 AM PT. Visibility remains limited, but the site appears quiet with low light levels.
    4:45 AM PT

    Visibility remains limited, but the site appears quiet with low light levels.

  48. 5 similar no-change frames12:00 AM–4:00 AM PT

    No visible change was reported between sampled frames; continuous inactivity cannot be inferred.

    1. Construction camera frame at 4:00 AM PT. No construction activity — the site is quiet.
      4:00 AM PT

      No construction activity — the site is quiet.

    2. Construction camera frame at 3:00 AM PT. No construction activity — the site is quiet.
      3:00 AM PT

      No construction activity — the site is quiet.

    3. Construction camera frame at 2:00 AM PT. No construction activity — the site is quiet.
      2:00 AM PT

      No construction activity — the site is quiet.

    4. Construction camera frame at 1:00 AM PT. No construction activity — the site is quiet.
      1:00 AM PT

      No construction activity — the site is quiet.

    5. Construction camera frame at 12:00 AM PT. No construction activity — the site is quiet.
      12:00 AM PT

      No construction activity — the site is quiet.

← Jun 24All daysJun 26 →