Skip to content
606Onni 606 · Bellevue
  • Live
  • Progress
  • Project
  • History
  • Search
606

606 (& 620) 106th Ave NE, Bellevue, WA

An independent guide to the Onni 606 development.

For the wider city, visit bellevue.wiki ↗

Project

  • Overview
  • Live cam
  • Latest progress
  • Construction log
  • News
  • Permit ledger
  • Construction impacts
  • The Towers
  • Skyline & height
  • Timeline
  • Gallery

Context

  • History of the block
  • Location
  • Developer

Help

  • Search the site
  • FAQ
  • Glossary
  • Sources & press
  • Contact
  • Updates feed
  • Sitemap

This is an independent, informational fan site. It is not affiliated with, sponsored by, or endorsed by Onni Group. Figures are compiled from public reporting and are approximate and subject to change. Project names and trademarks belong to their respective owners.

© 2026 onni606.com — built by an enthusiast.

  1. Home
  2. /Construction log
  3. /Friday, June 26, 2026

Construction log

Friday, June 26, 2026

73 snapshots from the live camera.


AI digest

The site remained largely quiet, with no clear change in the ground or equipment layout between the day’s frames and the week-earlier view. Vehicles came and went and machinery shifted briefly, but no substantial site progress is visible.

▶ Play this day as a timelapse
  1. Construction camera frame at 11:00 PM PT. No construction activity — the site is quiet.
    11:00 PM PT

    No construction activity — the site is quiet.

  2. 2 similar no-change frames9:30 PM–10:00 PM PT

    No visible change was reported between sampled frames; continuous inactivity cannot be inferred.

    1. Construction camera frame at 10:00 PM PT. No construction activity — the site is quiet.
      10:00 PM PT

      No construction activity — the site is quiet.

    2. Construction camera frame at 9:30 PM PT. Everything is still on site, and there is no visible movement in the staging area or the main lot.
      9:30 PM PT

      Everything is still on site, and there is no visible movement in the staging area or the main lot.

  3. Construction camera frame at 9:15 PM PT. Activity on site is minimal, and the layout of equipment and debris remains consistent.
    9:15 PM PT

    Activity on site is minimal, and the layout of equipment and debris remains consistent.

  4. 9 similar no-change frames7:00 PM–9:00 PM PT

    No visible change was reported between sampled frames; continuous inactivity cannot be inferred.

    1. Construction camera frame at 9:00 PM PT. The site appears unchanged, with equipment remaining in the same positions as before.
      9:00 PM PT

      The site appears unchanged, with equipment remaining in the same positions as before.

    2. Construction camera frame at 8:45 PM PT. The scene remains largely static, with no significant changes in equipment position or debris removal.
      8:45 PM PT

      The scene remains largely static, with no significant changes in equipment position or debris removal.

    3. Construction camera frame at 8:30 PM PT. No construction activity — the site is quiet.
      8:30 PM PT

      No construction activity — the site is quiet.

    4. Construction camera frame at 8:15 PM PT. No construction activity — the site is quiet.
      8:15 PM PT

      No construction activity — the site is quiet.

    5. Construction camera frame at 8:00 PM PT. No construction activity — the site is quiet.
      8:00 PM PT

      No construction activity — the site is quiet.

    6. Construction camera frame at 7:45 PM PT. No construction activity — the site is quiet.
      7:45 PM PT

      No construction activity — the site is quiet.

    7. Construction camera frame at 7:30 PM PT. No construction activity — the site is quiet.
      7:30 PM PT

      No construction activity — the site is quiet.

    8. Construction camera frame at 7:15 PM PT. No construction activity — the site is quiet.
      7:15 PM PT

      No construction activity — the site is quiet.

    9. Construction camera frame at 7:00 PM PT. No construction activity — the site is quiet.
      7:00 PM PT

      No construction activity — the site is quiet.

  5. Construction camera frame at 6:45 PM PT. A red loader is now visible moving along the service road on the right side of the frame.
    6:45 PM PT

    A red loader is now visible moving along the service road on the right side of the frame.

  6. Construction camera frame at 6:30 PM PT. The overall scene remains quite similar, although a white pickup truck has appeared near the driveway on the left side of the frame.
    6:30 PM PT

    The overall scene remains quite similar, although a white pickup truck has appeared near the driveway on the left side of the frame.

  7. 2 similar no-change frames6:00 PM–6:15 PM PT

    No visible change was reported between sampled frames; continuous inactivity cannot be inferred.

    1. Construction camera frame at 6:15 PM PT. The demolition site maintains a consistent appearance, with no apparent shifts in equipment or rubble accumulation.
      6:15 PM PT

      The demolition site maintains a consistent appearance, with no apparent shifts in equipment or rubble accumulation.

    2. Construction camera frame at 6:00 PM PT. The scene appears remarkably consistent, with no discernible alterations to the site's layout or equipment positions.
      6:00 PM PT

      The scene appears remarkably consistent, with no discernible alterations to the site's layout or equipment positions.

  8. Construction camera frame at 5:45 PM PT. A large dump truck is now exiting the site via the service road on the right.
    5:45 PM PT

    A large dump truck is now exiting the site via the service road on the right.

  9. 2 similar no-change frames5:15 PM–5:30 PM PT

    No visible change was reported between sampled frames; continuous inactivity cannot be inferred.

    1. Construction camera frame at 5:30 PM PT. The demolition site looks largely unchanged, though the excavator in the center appears to have shifted slightly to the right.
      5:30 PM PT

      The demolition site looks largely unchanged, though the excavator in the center appears to have shifted slightly to the right.

    2. Construction camera frame at 5:15 PM PT. The site presents a static view, with no obvious movement of machinery or growth of the debris pile.
      5:15 PM PT

      The site presents a static view, with no obvious movement of machinery or growth of the debris pile.

  10. Construction camera frame at 5:00 PM PT. The site's appearance is stable, with no readily visible changes to the equipment or the rubble pile's size.
    5:00 PM PT

    The site's appearance is stable, with no readily visible changes to the equipment or the rubble pile's size.

  11. Construction camera frame at 4:45 PM PT. Activity remains minimal, though a white vehicle has entered the site via the driveway on the left.
    4:45 PM PT

    Activity remains minimal, though a white vehicle has entered the site via the driveway on the left.

  12. 5 similar no-change frames3:30 PM–4:30 PM PT

    No visible change was reported between sampled frames; continuous inactivity cannot be inferred.

    1. Construction camera frame at 4:30 PM PT. The demolition site maintains its current appearance, with no apparent shifts in equipment or debris arrangement.
      4:30 PM PT

      The demolition site maintains its current appearance, with no apparent shifts in equipment or debris arrangement.

    2. Construction camera frame at 4:15 PM PT. The scene shows a continuation of the previous state, with no discernible alterations in equipment placement or the debris field.
      4:15 PM PT

      The scene shows a continuation of the previous state, with no discernible alterations in equipment placement or the debris field.

    3. Construction camera frame at 4:00 PM PT. The scene appears remarkably consistent, showing no noticeable alteration in the position of machinery or the extent of the debris.
      4:00 PM PT

      The scene appears remarkably consistent, showing no noticeable alteration in the position of machinery or the extent of the debris.

    4. Construction camera frame at 3:45 PM PT. The scene remains largely unchanged, with equipment holding its positions and the debris pile appearing stable.
      3:45 PM PT

      The scene remains largely unchanged, with equipment holding its positions and the debris pile appearing stable.

    5. Construction camera frame at 3:30 PM PT. The site presents a static view, with no immediately obvious movement of equipment or changes to the debris.
      3:30 PM PT

      The site presents a static view, with no immediately obvious movement of equipment or changes to the debris.

  13. Construction camera frame at 3:15 PM PT. The rubble pile appears slightly larger, with a noticeable increase in debris accumulation over the last fifteen minutes.
    3:15 PM PT

    The rubble pile appears slightly larger, with a noticeable increase in debris accumulation over the last fifteen minutes.

  14. Construction camera frame at 3:00 PM PT. A dark-colored pickup truck has entered the site via the driveway on the left and is now parked in the upper-left staging area.
    3:00 PM PT

    A dark-colored pickup truck has entered the site via the driveway on the left and is now parked in the upper-left staging area.

  15. Construction camera frame at 2:45 PM PT. A small excavator has shifted position within the main rubble pile, now facing a different direction.
    2:45 PM PT

    A small excavator has shifted position within the main rubble pile, now facing a different direction.

  16. 3 similar no-change frames2:00 PM–2:30 PM PT

    No visible change was reported between sampled frames; continuous inactivity cannot be inferred.

    1. Construction camera frame at 2:30 PM PT. The layout of the site remains consistent, with no apparent shifts in equipment or debris accumulation.
      2:30 PM PT

      The layout of the site remains consistent, with no apparent shifts in equipment or debris accumulation.

    2. Construction camera frame at 2:15 PM PT. The demolition site appears quiet, with no discernible alterations to the equipment layout or the size of the debris field.
      2:15 PM PT

      The demolition site appears quiet, with no discernible alterations to the equipment layout or the size of the debris field.

    3. Construction camera frame at 2:00 PM PT. The scene remains largely unchanged, with equipment and debris appearing in the same positions as before.
      2:00 PM PT

      The scene remains largely unchanged, with equipment and debris appearing in the same positions as before.

  17. Construction camera frame at 1:45 PM PT. The staging area now hosts a white pickup truck that wasn't present in the previous view.
    1:45 PM PT

    The staging area now hosts a white pickup truck that wasn't present in the previous view.

  18. 2 similar no-change frames1:15 PM–1:30 PM PT

    No visible change was reported between sampled frames; continuous inactivity cannot be inferred.

    1. Construction camera frame at 1:30 PM PT. The site presents a static view, with no obvious movement of equipment or increase in the debris pile.
      1:30 PM PT

      The site presents a static view, with no obvious movement of equipment or increase in the debris pile.

    2. Construction camera frame at 1:15 PM PT. The overall scene is consistent, with no noticeable changes to the rubble pile or equipment positions.
      1:15 PM PT

      The overall scene is consistent, with no noticeable changes to the rubble pile or equipment positions.

  19. Construction camera frame at 1:00 PM PT. A small, yellow loader is now visible moving debris within the main demolition area.
    1:00 PM PT

    A small, yellow loader is now visible moving debris within the main demolition area.

  20. Construction camera frame at 12:45 PM PT. The site shows minimal variation, with everything appearing to be in the same location as before.
    12:45 PM PT

    The site shows minimal variation, with everything appearing to be in the same location as before.

  21. 4 similar no-change frames11:45 AM–12:30 PM PT

    No visible change was reported between sampled frames; continuous inactivity cannot be inferred.

    1. Construction camera frame at 12:30 PM PT. The site’s configuration is consistent, showing no significant alterations in the position of equipment or the debris accumulation.
      12:30 PM PT

      The site’s configuration is consistent, showing no significant alterations in the position of equipment or the debris accumulation.

    2. Construction camera frame at 12:15 PM PT. The scene remains remarkably stable, with no discernible shifts in the placement of machinery or the extent of the debris.
      12:15 PM PT

      The scene remains remarkably stable, with no discernible shifts in the placement of machinery or the extent of the debris.

    3. Construction camera frame at 12:00 PM PT. The demolition site appears largely unchanged, with equipment and debris remaining in the same positions.
      12:00 PM PT

      The demolition site appears largely unchanged, with equipment and debris remaining in the same positions.

    4. Construction camera frame at 11:45 AM PT. The site maintains a steady state, with no apparent changes in equipment or the size of the debris pile.
      11:45 AM PT

      The site maintains a steady state, with no apparent changes in equipment or the size of the debris pile.

  22. Construction camera frame at 11:15 AM PT. The rubble pile appears slightly larger, with more debris concentrated in the center of the demolition zone.
    11:15 AM PT

    The rubble pile appears slightly larger, with more debris concentrated in the center of the demolition zone.

  23. Construction camera frame at 11:00 AM PT. The demolition site continues to present a familiar view, with no noticeable movement of equipment or changes to the debris field.
    11:00 AM PT

    The demolition site continues to present a familiar view, with no noticeable movement of equipment or changes to the debris field.

  24. Construction camera frame at 10:45 AM PT. The demolition site shows minimal difference between these views, with the same equipment and debris arrangement visible.
    10:45 AM PT

    The demolition site shows minimal difference between these views, with the same equipment and debris arrangement visible.

  25. Construction camera frame at 10:30 AM PT. The overall scene presents a consistent appearance, with no obvious alterations to equipment positioning or debris levels.
    10:30 AM PT

    The overall scene presents a consistent appearance, with no obvious alterations to equipment positioning or debris levels.

  26. 2 similar no-change frames10:00 AM–10:15 AM PT

    No visible change was reported between sampled frames; continuous inactivity cannot be inferred.

    1. Construction camera frame at 10:15 AM PT. The scene remains remarkably static, with no discernible shifts in equipment or debris placement.
      10:15 AM PT

      The scene remains remarkably static, with no discernible shifts in equipment or debris placement.

    2. Construction camera frame at 10:00 AM PT. The site appears largely unchanged, with equipment and debris remaining in consistent locations.
      10:00 AM PT

      The site appears largely unchanged, with equipment and debris remaining in consistent locations.

  27. Construction camera frame at 9:45 AM PT. The staging area now contains an additional white vehicle, parked near the other trucks and equipment.
    9:45 AM PT

    The staging area now contains an additional white vehicle, parked near the other trucks and equipment.

  28. Construction camera frame at 9:30 AM PT. A gray pickup truck has entered the site from the driveway on the left and is now parked near the staging area, adjacent to the white vehicle.
    9:30 AM PT

    A gray pickup truck has entered the site from the driveway on the left and is now parked near the staging area, adjacent to the white vehicle.

  29. Construction camera frame at 9:15 AM PT. A white vehicle, possibly a van, has moved from the staging area and is now positioned closer to the driveway exit on the left.
    9:15 AM PT

    A white vehicle, possibly a van, has moved from the staging area and is now positioned closer to the driveway exit on the left.

  30. Construction camera frame at 9:00 AM PT. The demolition site continues to show minimal variation, with the equipment and debris remaining largely in the same positions.
    9:00 AM PT

    The demolition site continues to show minimal variation, with the equipment and debris remaining largely in the same positions.

  31. Construction camera frame at 8:45 AM PT. Several workers are now visible near the center of the site, and a yellow excavator seems to be repositioning itself amongst the rubble.
    8:45 AM PT

    Several workers are now visible near the center of the site, and a yellow excavator seems to be repositioning itself amongst the rubble.

  32. Construction camera frame at 8:30 AM PT. A dark-colored sedan has pulled onto the service road on the right side of the frame.
    8:30 AM PT

    A dark-colored sedan has pulled onto the service road on the right side of the frame.

  33. Construction camera frame at 8:15 AM PT. The scene presents a static view, with no apparent changes in equipment or debris arrangement.
    8:15 AM PT

    The scene presents a static view, with no apparent changes in equipment or debris arrangement.

  34. Construction camera frame at 8:00 AM PT. A white pickup truck has entered the site via the driveway on the left and is now parked near the staging area.
    8:00 AM PT

    A white pickup truck has entered the site via the driveway on the left and is now parked near the staging area.

  35. Construction camera frame at 7:45 AM PT. The site’s layout remains consistent, with no visible movement of vehicles or equipment during this interval.
    7:45 AM PT

    The site’s layout remains consistent, with no visible movement of vehicles or equipment during this interval.

  36. Construction camera frame at 7:30 AM PT. The site appears stable, with no immediately noticeable adjustments to the equipment or the growing debris pile.
    7:30 AM PT

    The site appears stable, with no immediately noticeable adjustments to the equipment or the growing debris pile.

  37. Construction camera frame at 7:15 AM PT. The scene remains largely unchanged, with equipment and debris appearing in the same positions as before.
    7:15 AM PT

    The scene remains largely unchanged, with equipment and debris appearing in the same positions as before.

  38. Construction camera frame at 7:00 AM PT. The demolition site shows no discernible differences from the previous view.
    7:00 AM PT

    The demolition site shows no discernible differences from the previous view.

  39. Construction camera frame at 6:45 AM PT. The site's overall configuration appears to be holding, with no observable shifts in equipment placement or rubble accumulation.
    6:45 AM PT

    The site's overall configuration appears to be holding, with no observable shifts in equipment placement or rubble accumulation.

  40. Construction camera frame at 6:30 AM PT. The site maintains a consistent appearance, showing no immediate alterations in the positioning of machinery or the debris field.
    6:30 AM PT

    The site maintains a consistent appearance, showing no immediate alterations in the positioning of machinery or the debris field.

  41. Construction camera frame at 6:15 AM PT. The site presents a similar view as before, with no readily apparent changes in equipment or debris levels.
    6:15 AM PT

    The site presents a similar view as before, with no readily apparent changes in equipment or debris levels.

  42. Construction camera frame at 6:00 AM PT. The scene holds steady, with no discernible alterations to the layout or equipment positions.
    6:00 AM PT

    The scene holds steady, with no discernible alterations to the layout or equipment positions.

  43. Construction camera frame at 5:45 AM PT. The demolition site appears stable, with no immediately noticeable shifts in activity or the size of the rubble pile.
    5:45 AM PT

    The demolition site appears stable, with no immediately noticeable shifts in activity or the size of the rubble pile.

  44. 8 similar no-change frames12:00 AM–5:30 AM PT

    No visible change was reported between sampled frames; continuous inactivity cannot be inferred.

    1. Construction camera frame at 5:30 AM PT. The site remains largely unchanged, with no obvious movement of equipment or significant alterations to the debris pile.
      5:30 AM PT

      The site remains largely unchanged, with no obvious movement of equipment or significant alterations to the debris pile.

    2. Construction camera frame at 5:15 AM PT. Visibility remains low, and the site appears quiet with no discernible changes.
      5:15 AM PT

      Visibility remains low, and the site appears quiet with no discernible changes.

    3. Construction camera frame at 5:00 AM PT. No construction activity — the site is quiet.
      5:00 AM PT

      No construction activity — the site is quiet.

    4. Construction camera frame at 4:00 AM PT. No construction activity — the site is quiet.
      4:00 AM PT

      No construction activity — the site is quiet.

    5. Construction camera frame at 3:00 AM PT. No construction activity — the site is quiet.
      3:00 AM PT

      No construction activity — the site is quiet.

    6. Construction camera frame at 2:00 AM PT. No construction activity — the site is quiet.
      2:00 AM PT

      No construction activity — the site is quiet.

    7. Construction camera frame at 1:00 AM PT. No construction activity — the site is quiet.
      1:00 AM PT

      No construction activity — the site is quiet.

    8. Construction camera frame at 12:00 AM PT. No construction activity — the site is quiet.
      12:00 AM PT

      No construction activity — the site is quiet.

← Jun 25All daysJun 27 →