606

606 (& 620) 106th Ave NE, Bellevue, WA

An independent guide to the Onni 606 development.

Project

  • Overview
  • Live cam
  • Live data
  • Construction log
  • The Towers
  • Skyline & height
  • Timeline
  • Gallery

Context

  • History of the block
  • Location
  • Developer
  • All of Bellevue ↗

Help

  • FAQ
  • Glossary
  • Sources & press
  • Contact
  • Updates feed
  • Sitemap

This is an independent, informational fan site. It is not affiliated with, sponsored by, or endorsed by Onni Group. Figures are compiled from public reporting and are approximate and subject to change. Project names and trademarks belong to their respective owners.

© 2026 onni606.com — built by an enthusiast.

  1. Home
  2. /Construction log
  3. /Saturday, June 27, 2026

Construction log

Saturday, June 27, 2026

74 snapshots from the live camera.

Onni 606 · project recordDowntown Bellevue

AI digest

A dump truck entered the site, and later the site became partially flooded, with a small excavator shifting position and operating within the flooded zone as the water began to recede.

▶ Play this day as a timelapse
  1. No construction activity — the site is quiet.
    11:00 PM PT

    No construction activity — the site is quiet.

  2. No construction activity — the site is quiet.
    10:00 PM PT

    No construction activity — the site is quiet.

  3. Visibility is low, but the site appears quiet with no noticeable alterations in the last quarter hour.
    9:30 PM PT

    Visibility is low, but the site appears quiet with no noticeable alterations in the last quarter hour.

  4. The site appears static, with no visible changes in equipment positioning or debris levels.
    9:15 PM PT

    The site appears static, with no visible changes in equipment positioning or debris levels.

  5. The scene remains largely unchanged, with equipment positioned as it was moments ago.
    9:00 PM PT

    The scene remains largely unchanged, with equipment positioned as it was moments ago.

  6. No construction activity — the site is quiet.
    8:45 PM PT

    No construction activity — the site is quiet.

  7. No construction activity — the site is quiet.
    8:30 PM PT

    No construction activity — the site is quiet.

  8. No construction activity — the site is quiet.
    8:15 PM PT

    No construction activity — the site is quiet.

  9. No construction activity — the site is quiet.
    8:00 PM PT

    No construction activity — the site is quiet.

  10. No construction activity — the site is quiet.
    7:45 PM PT

    No construction activity — the site is quiet.

  11. No construction activity — the site is quiet.
    7:30 PM PT

    No construction activity — the site is quiet.

  12. No construction activity — the site is quiet.
    7:15 PM PT

    No construction activity — the site is quiet.

  13. No construction activity — the site is quiet.
    7:00 PM PT

    No construction activity — the site is quiet.

  14. No construction activity — the site is quiet.
    6:45 PM PT

    No construction activity — the site is quiet.

  15. No construction activity — the site is quiet.
    6:30 PM PT

    No construction activity — the site is quiet.

  16. No construction activity — the site is quiet.
    6:15 PM PT

    No construction activity — the site is quiet.

  17. The scene presents a quiet stillness, with no discernible shifts in equipment placement or the debris accumulation.
    6:00 PM PT

    The scene presents a quiet stillness, with no discernible shifts in equipment placement or the debris accumulation.

  18. The demolition site appears largely unchanged, with equipment remaining in the same positions as before.
    5:45 PM PT

    The demolition site appears largely unchanged, with equipment remaining in the same positions as before.

  19. The excavator has rotated further to the right, now facing almost directly away from the camera.
    5:30 PM PT

    The excavator has rotated further to the right, now facing almost directly away from the camera.

  20. The site is holding steady, with no visible changes to the equipment or rubble pile over the last fifteen minutes.
    5:15 PM PT

    The site is holding steady, with no visible changes to the equipment or rubble pile over the last fifteen minutes.

  21. The excavator’s position within the flooded central area has shifted slightly, now angled more towards the lower-right corner of the debris.
    5:00 PM PT

    The excavator’s position within the flooded central area has shifted slightly, now angled more towards the lower-right corner of the debris.

  22. The scene remains remarkably consistent, with no apparent movement of machinery or significant alteration to the debris field.
    4:45 PM PT

    The scene remains remarkably consistent, with no apparent movement of machinery or significant alteration to the debris field.

  23. No new activity is visible across the lot or in the staging area.
    4:30 PM PT

    No new activity is visible across the lot or in the staging area.

  24. A red truck has entered the site via the service road on the right, parking near the staging area.
    4:15 PM PT

    A red truck has entered the site via the service road on the right, parking near the staging area.

  25. The demolition site presents a largely unchanged view, with the excavator remaining in the same position within the flooded area.
    4:00 PM PT

    The demolition site presents a largely unchanged view, with the excavator remaining in the same position within the flooded area.

  26. Everything appears static, with no noticeable shifts in equipment or the extent of the flooding.
    3:45 PM PT

    Everything appears static, with no noticeable shifts in equipment or the extent of the flooding.

  27. The small excavator has paused its work in the flooded area and is now facing a slightly different direction.
    3:30 PM PT

    The small excavator has paused its work in the flooded area and is now facing a slightly different direction.

  28. The excavator is now actively digging in the flooded demolition zone, shifting debris around as it works.
    3:15 PM PT

    The excavator is now actively digging in the flooded demolition zone, shifting debris around as it works.

  29. The scene is holding steady, with no discernible alterations to the water level or equipment positions.
    3:00 PM PT

    The scene is holding steady, with no discernible alterations to the water level or equipment positions.

  30. The site remains in a holding pattern, with no apparent movement of machinery or significant changes to the water-covered demolition area.
    2:45 PM PT

    The site remains in a holding pattern, with no apparent movement of machinery or significant changes to the water-covered demolition area.

  31. The excavator in the flooded demolition zone has ceased operating and is now stationary.
    2:30 PM PT

    The excavator in the flooded demolition zone has ceased operating and is now stationary.

  32. The scene is largely unchanged, though the excavator in the flooded area appears to be operating now.
    2:15 PM PT

    The scene is largely unchanged, though the excavator in the flooded area appears to be operating now.

  33. The site appears very similar, though a small excavator has shifted position slightly within the flooded demolition zone.
    2:00 PM PT

    The site appears very similar, though a small excavator has shifted position slightly within the flooded demolition zone.

  34. The site shows minimal alteration, with the water level and debris arrangement appearing consistent with the previous view.
    1:45 PM PT

    The site shows minimal alteration, with the water level and debris arrangement appearing consistent with the previous view.

  35. The demolition site continues to present a similar appearance, with no obvious movement of equipment or change to the flooded area.
    1:30 PM PT

    The demolition site continues to present a similar appearance, with no obvious movement of equipment or change to the flooded area.

  36. The overall scene remains remarkably static, with no noticeable alterations to the debris or water levels.
    1:15 PM PT

    The overall scene remains remarkably static, with no noticeable alterations to the debris or water levels.

  37. The demolition site presents a consistent view, with no discernible alterations in water levels or debris placement.
    1:00 PM PT

    The demolition site presents a consistent view, with no discernible alterations in water levels or debris placement.

  38. The demolition area remains quite still, with no apparent shift in water levels or the arrangement of debris.
    12:45 PM PT

    The demolition area remains quite still, with no apparent shift in water levels or the arrangement of debris.

  39. The scene remains largely unchanged, with the water level holding steady across the demolition area.
    12:30 PM PT

    The scene remains largely unchanged, with the water level holding steady across the demolition area.

  40. The demolition site appears stable, with no significant changes to the water level or debris field.
    12:15 PM PT

    The demolition site appears stable, with no significant changes to the water level or debris field.

  41. The site shows minimal additional drying, though the exposed debris field remains largely the same.
    12:00 PM PT

    The site shows minimal additional drying, though the exposed debris field remains largely the same.

  42. The site continues to dry out, with noticeably more debris exposed as the water level drops.
    11:45 AM PT

    The site continues to dry out, with noticeably more debris exposed as the water level drops.

  43. The water continues to drain from the site, exposing more of the rubble and the ground underneath.
    11:30 AM PT

    The water continues to drain from the site, exposing more of the rubble and the ground underneath.

  44. The floodwaters have receded slightly, revealing more of the debris field and the base of the remaining structure.
    11:15 AM PT

    The floodwaters have receded slightly, revealing more of the debris field and the base of the remaining structure.

  45. The water level appears stable, with no noticeable recession of the flooding across the demolition zone.
    11:00 AM PT

    The water level appears stable, with no noticeable recession of the flooding across the demolition zone.

  46. The scene remains largely as it was, with the floodwaters still covering the demolition site.
    10:45 AM PT

    The scene remains largely as it was, with the floodwaters still covering the demolition site.

  47. The demolition site is now partially flooded, with standing water covering much of the lower areas.
    10:30 AM PT

    The demolition site is now partially flooded, with standing water covering much of the lower areas.

  48. A dump truck has entered the site via the driveway on the left, and is maneuvering towards the staging area.
    10:15 AM PT

    A dump truck has entered the site via the driveway on the left, and is maneuvering towards the staging area.

  49. The site holds steady, with equipment and the debris pile appearing in the same configuration as before.
    10:00 AM PT

    The site holds steady, with equipment and the debris pile appearing in the same configuration as before.

  50. The site presents a familiar view, with no discernible changes in equipment placement or debris accumulation.
    9:45 AM PT

    The site presents a familiar view, with no discernible changes in equipment placement or debris accumulation.

  51. The site maintains a quiet status, with no readily apparent movement of machinery or changes to the rubble.
    9:30 AM PT

    The site maintains a quiet status, with no readily apparent movement of machinery or changes to the rubble.

  52. The layout of the site is unchanged, with all equipment and the debris pile remaining in the same positions.
    9:15 AM PT

    The layout of the site is unchanged, with all equipment and the debris pile remaining in the same positions.

  53. Everything appears to be in the same place, with no immediate changes to the equipment or the growing debris pile.
    9:00 AM PT

    Everything appears to be in the same place, with no immediate changes to the equipment or the growing debris pile.

  54. The site’s appearance is remarkably stable, showing no significant shifts in machinery or the debris field over the last fifteen minutes.
    8:45 AM PT

    The site’s appearance is remarkably stable, showing no significant shifts in machinery or the debris field over the last fifteen minutes.

  55. The scene remains largely consistent, with no noticeable alterations to the position of equipment or the size of the debris pile.
    8:30 AM PT

    The scene remains largely consistent, with no noticeable alterations to the position of equipment or the size of the debris pile.

  56. The scene is holding steady, with equipment and the debris pile appearing in the same arrangement as fifteen minutes ago.
    8:15 AM PT

    The scene is holding steady, with equipment and the debris pile appearing in the same arrangement as fifteen minutes ago.

  57. The demolition site presents a similar view as before, with no obvious shifts in equipment or debris accumulation.
    8:00 AM PT

    The demolition site presents a similar view as before, with no obvious shifts in equipment or debris accumulation.

  58. The site continues to show no discernible changes in equipment positioning or debris levels.
    7:45 AM PT

    The site continues to show no discernible changes in equipment positioning or debris levels.

  59. The scene remains static, with no apparent movement of equipment or significant changes to the debris field.
    7:30 AM PT

    The scene remains static, with no apparent movement of equipment or significant changes to the debris field.

  60. The site appears unchanged, with all machinery and debris remaining in the same locations as before.
    7:15 AM PT

    The site appears unchanged, with all machinery and debris remaining in the same locations as before.

  61. Everything on site remains in the same position, and the rubble pile hasn't noticeably grown in the last fifteen minutes.
    7:00 AM PT

    Everything on site remains in the same position, and the rubble pile hasn't noticeably grown in the last fifteen minutes.

  62. No construction activity — the site is quiet.
    6:45 AM PT

    No construction activity — the site is quiet.

  63. No construction activity — the site is quiet.
    6:30 AM PT

    No construction activity — the site is quiet.

  64. No construction activity — the site is quiet.
    6:15 AM PT

    No construction activity — the site is quiet.

  65. No construction activity — the site is quiet.
    6:00 AM PT

    No construction activity — the site is quiet.

  66. The scene remains largely static, with equipment holding its positions and no noticeable alterations to the debris field.
    5:45 AM PT

    The scene remains largely static, with equipment holding its positions and no noticeable alterations to the debris field.

  67. The demolition site appears much the same as before, with no visible movement of equipment or changes to the rubble pile.
    5:30 AM PT

    The demolition site appears much the same as before, with no visible movement of equipment or changes to the rubble pile.

  68. The site remains still and quiet under the evening lights.
    5:15 AM PT

    The site remains still and quiet under the evening lights.

  69. Visibility has improved, revealing a largely unchanged site with the same equipment parked in the staging area.
    5:00 AM PT

    Visibility has improved, revealing a largely unchanged site with the same equipment parked in the staging area.

  70. No construction activity — the site is quiet.
    4:00 AM PT

    No construction activity — the site is quiet.

  71. No construction activity — the site is quiet.
    3:00 AM PT

    No construction activity — the site is quiet.

  72. No construction activity — the site is quiet.
    2:00 AM PT

    No construction activity — the site is quiet.

  73. No construction activity — the site is quiet.
    1:00 AM PT

    No construction activity — the site is quiet.

  74. No construction activity — the site is quiet.
    12:00 AM PT

    No construction activity — the site is quiet.