Skip to content
606Onni 606 · Bellevue
  • Live
  • Progress
  • Project
  • History
  • Search
606

606 (& 620) 106th Ave NE, Bellevue, WA

An independent guide to the Onni 606 development.

For the wider city, visit bellevue.wiki ↗

Project

  • Overview
  • Live cam
  • Latest progress
  • Construction log
  • News
  • Permit ledger
  • Construction impacts
  • The Towers
  • Skyline & height
  • Timeline
  • Gallery

Context

  • History of the block
  • Location
  • Developer

Help

  • Search the site
  • FAQ
  • Glossary
  • Sources & press
  • Contact
  • Updates feed
  • Sitemap

This is an independent, informational fan site. It is not affiliated with, sponsored by, or endorsed by Onni Group. Figures are compiled from public reporting and are approximate and subject to change. Project names and trademarks belong to their respective owners.

© 2026 onni606.com — built by an enthusiast.

  1. Home
  2. /Construction log
  3. /Sunday, June 28, 2026

Construction log

Sunday, June 28, 2026

74 snapshots from the live camera.


AI digest

The site remained largely unchanged through the day, with no clear change to the ground or material piles. A dump truck and pickup were briefly reported entering, and the loader shifted position, but no sustained work or substantial progress is visible.

▶ Play this day as a timelapse
  1. Construction camera frame at 11:00 PM PT. No construction activity — the site is quiet.
    11:00 PM PT

    No construction activity — the site is quiet.

  2. 13 similar no-change frames6:45 PM–10:00 PM PT

    No visible change was reported between sampled frames; continuous inactivity cannot be inferred.

    1. Construction camera frame at 10:00 PM PT. No construction activity — the site is quiet.
      10:00 PM PT

      No construction activity — the site is quiet.

    2. Construction camera frame at 9:30 PM PT. The scene remains largely unchanged, with equipment still in the same positions as before.
      9:30 PM PT

      The scene remains largely unchanged, with equipment still in the same positions as before.

    3. Construction camera frame at 9:15 PM PT. No construction activity — the site is quiet.
      9:15 PM PT

      No construction activity — the site is quiet.

    4. Construction camera frame at 9:00 PM PT. No construction activity — the site is quiet.
      9:00 PM PT

      No construction activity — the site is quiet.

    5. Construction camera frame at 8:45 PM PT. No construction activity — the site is quiet.
      8:45 PM PT

      No construction activity — the site is quiet.

    6. Construction camera frame at 8:30 PM PT. No construction activity — the site is quiet.
      8:30 PM PT

      No construction activity — the site is quiet.

    7. Construction camera frame at 8:15 PM PT. No construction activity — the site is quiet.
      8:15 PM PT

      No construction activity — the site is quiet.

    8. Construction camera frame at 8:00 PM PT. No construction activity — the site is quiet.
      8:00 PM PT

      No construction activity — the site is quiet.

    9. Construction camera frame at 7:45 PM PT. No construction activity — the site is quiet.
      7:45 PM PT

      No construction activity — the site is quiet.

    10. Construction camera frame at 7:30 PM PT. No construction activity — the site is quiet.
      7:30 PM PT

      No construction activity — the site is quiet.

    11. Construction camera frame at 7:15 PM PT. No construction activity — the site is quiet.
      7:15 PM PT

      No construction activity — the site is quiet.

    12. Construction camera frame at 7:00 PM PT. The site appears quiet, with no noticeable alterations to the equipment layout or debris field.
      7:00 PM PT

      The site appears quiet, with no noticeable alterations to the equipment layout or debris field.

    13. Construction camera frame at 6:45 PM PT. The demolition site appears unchanged, with equipment remaining in the same positions as before.
      6:45 PM PT

      The demolition site appears unchanged, with equipment remaining in the same positions as before.

  3. Construction camera frame at 6:30 PM PT. The loader in the upper-left staging area has shifted position, now facing more directly toward the rubble pile.
    6:30 PM PT

    The loader in the upper-left staging area has shifted position, now facing more directly toward the rubble pile.

  4. 7 similar no-change frames4:45 PM–6:15 PM PT

    No visible change was reported between sampled frames; continuous inactivity cannot be inferred.

    1. Construction camera frame at 6:15 PM PT. The scene remains largely static, with no apparent movement of machinery or significant changes to the rubble pile.
      6:15 PM PT

      The scene remains largely static, with no apparent movement of machinery or significant changes to the rubble pile.

    2. Construction camera frame at 6:00 PM PT. No construction activity — the site is quiet.
      6:00 PM PT

      No construction activity — the site is quiet.

    3. Construction camera frame at 5:45 PM PT. No construction activity — the site is quiet.
      5:45 PM PT

      No construction activity — the site is quiet.

    4. Construction camera frame at 5:30 PM PT. No construction activity — the site is quiet.
      5:30 PM PT

      No construction activity — the site is quiet.

    5. Construction camera frame at 5:15 PM PT. No construction activity — the site is quiet.
      5:15 PM PT

      No construction activity — the site is quiet.

    6. Construction camera frame at 5:00 PM PT. No construction activity — the site is quiet.
      5:00 PM PT

      No construction activity — the site is quiet.

    7. Construction camera frame at 4:45 PM PT. No construction activity — the site is quiet.
      4:45 PM PT

      No construction activity — the site is quiet.

  5. Construction camera frame at 4:30 PM PT. The overall layout of the site appears consistent, with no immediate and obvious shifts in activity or debris levels.
    4:30 PM PT

    The overall layout of the site appears consistent, with no immediate and obvious shifts in activity or debris levels.

  6. Construction camera frame at 4:15 PM PT. The site holds steady, with no discernible changes to equipment or the growing debris field.
    4:15 PM PT

    The site holds steady, with no discernible changes to equipment or the growing debris field.

  7. Construction camera frame at 4:00 PM PT. The demolition site appears quiet, with no readily apparent shifts in the position of machinery or the size of the rubble pile.
    4:00 PM PT

    The demolition site appears quiet, with no readily apparent shifts in the position of machinery or the size of the rubble pile.

  8. Construction camera frame at 3:45 PM PT. The scene remains largely unchanged, with equipment and debris holding their positions.
    3:45 PM PT

    The scene remains largely unchanged, with equipment and debris holding their positions.

  9. Construction camera frame at 3:30 PM PT. The yellow loader in the upper-left corner has shifted position, now facing toward the central rubble pile.
    3:30 PM PT

    The yellow loader in the upper-left corner has shifted position, now facing toward the central rubble pile.

  10. Construction camera frame at 3:15 PM PT. A dark-colored pickup truck has entered the site via the driveway on the left.
    3:15 PM PT

    A dark-colored pickup truck has entered the site via the driveway on the left.

  11. Construction camera frame at 3:00 PM PT. The site is remarkably still, showing no clear adjustments in equipment placement or debris accumulation.
    3:00 PM PT

    The site is remarkably still, showing no clear adjustments in equipment placement or debris accumulation.

  12. 3 similar no-change frames2:15 PM–2:45 PM PT

    No visible change was reported between sampled frames; continuous inactivity cannot be inferred.

    1. Construction camera frame at 2:45 PM PT. The site presents a consistent picture, with no noticeable movement of equipment or changes to the debris.
      2:45 PM PT

      The site presents a consistent picture, with no noticeable movement of equipment or changes to the debris.

    2. Construction camera frame at 2:30 PM PT. Everything appears static, with the same arrangement of machinery and debris as a few moments ago.
      2:30 PM PT

      Everything appears static, with the same arrangement of machinery and debris as a few moments ago.

    3. Construction camera frame at 2:15 PM PT. The site holds steady, with no discernible alterations in machinery or the debris field.
      2:15 PM PT

      The site holds steady, with no discernible alterations in machinery or the debris field.

  13. Construction camera frame at 2:00 PM PT. The demolition site appears much the same as before, with no obvious shifts in equipment or debris.
    2:00 PM PT

    The demolition site appears much the same as before, with no obvious shifts in equipment or debris.

  14. 41 similar no-change frames12:00 AM–1:45 PM PT

    No visible change was reported between sampled frames; continuous inactivity cannot be inferred.

    1. Construction camera frame at 1:45 PM PT. The scene remains largely unchanged, with equipment positioned as before.
      1:45 PM PT

      The scene remains largely unchanged, with equipment positioned as before.

    2. Construction camera frame at 1:30 PM PT. No construction activity — the site is quiet.
      1:30 PM PT

      No construction activity — the site is quiet.

    3. Construction camera frame at 1:15 PM PT. No construction activity — the site is quiet.
      1:15 PM PT

      No construction activity — the site is quiet.

    4. Construction camera frame at 1:00 PM PT. No construction activity — the site is quiet.
      1:00 PM PT

      No construction activity — the site is quiet.

    5. Construction camera frame at 12:45 PM PT. No construction activity — the site is quiet.
      12:45 PM PT

      No construction activity — the site is quiet.

    6. Construction camera frame at 12:30 PM PT. No construction activity — the site is quiet.
      12:30 PM PT

      No construction activity — the site is quiet.

    7. Construction camera frame at 12:15 PM PT. No construction activity — the site is quiet.
      12:15 PM PT

      No construction activity — the site is quiet.

    8. Construction camera frame at 12:00 PM PT. The demolition site presents a remarkably similar view to the last check, with no apparent movement of machinery or alteration of the debris.
      12:00 PM PT

      The demolition site presents a remarkably similar view to the last check, with no apparent movement of machinery or alteration of the debris.

    9. Construction camera frame at 11:45 AM PT. The scene holds steady, with no noticeable shifts in equipment or the debris field.
      11:45 AM PT

      The scene holds steady, with no noticeable shifts in equipment or the debris field.

    10. Construction camera frame at 11:30 AM PT. The scene appears stable, with equipment and debris remaining in roughly the same positions as before.
      11:30 AM PT

      The scene appears stable, with equipment and debris remaining in roughly the same positions as before.

    11. Construction camera frame at 11:15 AM PT. A dump truck has entered the site via the service road on the right and is positioning itself near the rubble pile. Otherwise, the scene remains largely as it was, with no significant alterations to the debris or equipment placement.
      11:15 AM PT

      A dump truck has entered the site via the service road on the right and is positioning itself near the rubble pile. Otherwise, the scene remains largely as it was, with no significant alterations to the debris or equipment placement.

    12. Construction camera frame at 11:00 AM PT. No construction activity — the site is quiet.
      11:00 AM PT

      No construction activity — the site is quiet.

    13. Construction camera frame at 10:45 AM PT. No construction activity — the site is quiet.
      10:45 AM PT

      No construction activity — the site is quiet.

    14. Construction camera frame at 10:30 AM PT. No construction activity — the site is quiet.
      10:30 AM PT

      No construction activity — the site is quiet.

    15. Construction camera frame at 10:15 AM PT. No construction activity — the site is quiet.
      10:15 AM PT

      No construction activity — the site is quiet.

    16. Construction camera frame at 10:00 AM PT. No construction activity — the site is quiet.
      10:00 AM PT

      No construction activity — the site is quiet.

    17. Construction camera frame at 9:45 AM PT. No construction activity — the site is quiet.
      9:45 AM PT

      No construction activity — the site is quiet.

    18. Construction camera frame at 9:30 AM PT. No construction activity — the site is quiet.
      9:30 AM PT

      No construction activity — the site is quiet.

    19. Construction camera frame at 9:15 AM PT. No construction activity — the site is quiet.
      9:15 AM PT

      No construction activity — the site is quiet.

    20. Construction camera frame at 9:00 AM PT. No construction activity — the site is quiet.
      9:00 AM PT

      No construction activity — the site is quiet.

    21. Construction camera frame at 8:45 AM PT. No construction activity — the site is quiet.
      8:45 AM PT

      No construction activity — the site is quiet.

    22. Construction camera frame at 8:30 AM PT. No construction activity — the site is quiet.
      8:30 AM PT

      No construction activity — the site is quiet.

    23. Construction camera frame at 8:15 AM PT. No construction activity — the site is quiet.
      8:15 AM PT

      No construction activity — the site is quiet.

    24. Construction camera frame at 8:00 AM PT. No construction activity — the site is quiet.
      8:00 AM PT

      No construction activity — the site is quiet.

    25. Construction camera frame at 7:45 AM PT. No construction activity — the site is quiet.
      7:45 AM PT

      No construction activity — the site is quiet.

    26. Construction camera frame at 7:30 AM PT. No construction activity — the site is quiet.
      7:30 AM PT

      No construction activity — the site is quiet.

    27. Construction camera frame at 7:15 AM PT. No construction activity — the site is quiet.
      7:15 AM PT

      No construction activity — the site is quiet.

    28. Construction camera frame at 7:00 AM PT. No construction activity — the site is quiet.
      7:00 AM PT

      No construction activity — the site is quiet.

    29. Construction camera frame at 6:45 AM PT. No construction activity — the site is quiet.
      6:45 AM PT

      No construction activity — the site is quiet.

    30. Construction camera frame at 6:30 AM PT. No construction activity — the site is quiet.
      6:30 AM PT

      No construction activity — the site is quiet.

    31. Construction camera frame at 6:15 AM PT. No construction activity — the site is quiet.
      6:15 AM PT

      No construction activity — the site is quiet.

    32. Construction camera frame at 6:00 AM PT. No construction activity — the site is quiet.
      6:00 AM PT

      No construction activity — the site is quiet.

    33. Construction camera frame at 5:45 AM PT. No construction activity — the site is quiet.
      5:45 AM PT

      No construction activity — the site is quiet.

    34. Construction camera frame at 5:30 AM PT. No construction activity — the site is quiet.
      5:30 AM PT

      No construction activity — the site is quiet.

    35. Construction camera frame at 5:15 AM PT. No construction activity — the site is quiet.
      5:15 AM PT

      No construction activity — the site is quiet.

    36. Construction camera frame at 5:00 AM PT. No construction activity — the site is quiet.
      5:00 AM PT

      No construction activity — the site is quiet.

    37. Construction camera frame at 4:00 AM PT. No construction activity — the site is quiet.
      4:00 AM PT

      No construction activity — the site is quiet.

    38. Construction camera frame at 3:00 AM PT. No construction activity — the site is quiet.
      3:00 AM PT

      No construction activity — the site is quiet.

    39. Construction camera frame at 2:00 AM PT. No construction activity — the site is quiet.
      2:00 AM PT

      No construction activity — the site is quiet.

    40. Construction camera frame at 1:00 AM PT. No construction activity — the site is quiet.
      1:00 AM PT

      No construction activity — the site is quiet.

    41. Construction camera frame at 12:00 AM PT. No construction activity — the site is quiet.
      12:00 AM PT

      No construction activity — the site is quiet.

← Jun 27All daysJun 29 →