Skip to content
606Onni 606 · Bellevue
  • Live
  • Progress
  • Project
  • History
  • Search
606

606 (& 620) 106th Ave NE, Bellevue, WA

An independent guide to the Onni 606 development.

For the wider city, visit bellevue.wiki ↗

Project

  • Overview
  • Live cam
  • Latest progress
  • Construction log
  • News
  • Permit ledger
  • Construction impacts
  • The Towers
  • Skyline & height
  • Timeline
  • Gallery

Context

  • History of the block
  • Location
  • Developer

Help

  • Search the site
  • FAQ
  • Glossary
  • Sources & press
  • Contact
  • Updates feed
  • Sitemap

This is an independent, informational fan site. It is not affiliated with, sponsored by, or endorsed by Onni Group. Figures are compiled from public reporting and are approximate and subject to change. Project names and trademarks belong to their respective owners.

© 2026 onni606.com — built by an enthusiast.

  1. Home
  2. /Construction log
  3. /Monday, June 29, 2026

Construction log

Monday, June 29, 2026

74 snapshots from the live camera.


AI digest

The site was mostly quiet, with only brief activity as the central excavator worked the material pile and a loader shifted material; a few vehicles arrived, but no substantial change to the ground or overall layout is evident by day’s end. Compared with June 22, the broad graded surface and equipment arrangement appear largely unchanged.

▶ Play this day as a timelapse
  1. Construction camera frame at 11:00 PM PT. No construction activity — the site is quiet.
    11:00 PM PT

    No construction activity — the site is quiet.

  2. 12 similar no-change frames7:00 PM–10:00 PM PT

    No visible change was reported between sampled frames; continuous inactivity cannot be inferred.

    1. Construction camera frame at 10:00 PM PT. No construction activity — the site is quiet.
      10:00 PM PT

      No construction activity — the site is quiet.

    2. Construction camera frame at 9:30 PM PT. The site remains in a holding pattern, with no visible activity or changes to the debris field.
      9:30 PM PT

      The site remains in a holding pattern, with no visible activity or changes to the debris field.

    3. Construction camera frame at 9:15 PM PT. The demolition area shows no discernible changes in the last fifteen minutes, with all equipment holding its position.
      9:15 PM PT

      The demolition area shows no discernible changes in the last fifteen minutes, with all equipment holding its position.

    4. Construction camera frame at 9:00 PM PT. The site continues in a stable state, with no apparent movement of machinery or increase in the debris field.
      9:00 PM PT

      The site continues in a stable state, with no apparent movement of machinery or increase in the debris field.

    5. Construction camera frame at 8:45 PM PT. The demolition site remains quiet, with no noticeable shifts in equipment or the size of the debris pile.
      8:45 PM PT

      The demolition site remains quiet, with no noticeable shifts in equipment or the size of the debris pile.

    6. Construction camera frame at 8:30 PM PT. The scene appears largely unchanged, with equipment remaining in the same positions and no visible progress on the rubble pile.
      8:30 PM PT

      The scene appears largely unchanged, with equipment remaining in the same positions and no visible progress on the rubble pile.

    7. Construction camera frame at 8:15 PM PT. No construction activity — the site is quiet.
      8:15 PM PT

      No construction activity — the site is quiet.

    8. Construction camera frame at 8:00 PM PT. No construction activity — the site is quiet.
      8:00 PM PT

      No construction activity — the site is quiet.

    9. Construction camera frame at 7:45 PM PT. No construction activity — the site is quiet.
      7:45 PM PT

      No construction activity — the site is quiet.

    10. Construction camera frame at 7:30 PM PT. No construction activity — the site is quiet.
      7:30 PM PT

      No construction activity — the site is quiet.

    11. Construction camera frame at 7:15 PM PT. No construction activity — the site is quiet.
      7:15 PM PT

      No construction activity — the site is quiet.

    12. Construction camera frame at 7:00 PM PT. The site remains stable, with no significant changes to the positioning of equipment or the size of the rubble pile.
      7:00 PM PT

      The site remains stable, with no significant changes to the positioning of equipment or the size of the rubble pile.

  3. Construction camera frame at 6:45 PM PT. Everything on site remains in roughly the same configuration as before.
    6:45 PM PT

    Everything on site remains in roughly the same configuration as before.

  4. 6 similar no-change frames5:15 PM–6:30 PM PT

    No visible change was reported between sampled frames; continuous inactivity cannot be inferred.

    1. Construction camera frame at 6:30 PM PT. The demolition site presents a familiar view, with no apparent movement of equipment or growth of the debris pile.
      6:30 PM PT

      The demolition site presents a familiar view, with no apparent movement of equipment or growth of the debris pile.

    2. Construction camera frame at 6:15 PM PT. The site appears quiet, with no discernible alterations to the equipment or rubble since the previous view.
      6:15 PM PT

      The site appears quiet, with no discernible alterations to the equipment or rubble since the previous view.

    3. Construction camera frame at 6:00 PM PT. The scene is holding steady, with no visible movement of machinery or substantial change to the debris field.
      6:00 PM PT

      The scene is holding steady, with no visible movement of machinery or substantial change to the debris field.

    4. Construction camera frame at 5:45 PM PT. The demolition zone remains largely unchanged, with equipment and debris appearing in consistent positions.
      5:45 PM PT

      The demolition zone remains largely unchanged, with equipment and debris appearing in consistent positions.

    5. Construction camera frame at 5:30 PM PT. The site maintains a steady state, with no noticeable shifts in equipment or debris since the last check.
      5:30 PM PT

      The site maintains a steady state, with no noticeable shifts in equipment or debris since the last check.

    6. Construction camera frame at 5:15 PM PT. The demolition site continues at a similar pace, showing no significant alterations in equipment placement or debris levels.
      5:15 PM PT

      The demolition site continues at a similar pace, showing no significant alterations in equipment placement or debris levels.

  5. Construction camera frame at 5:00 PM PT. The site is stable, with no readily apparent changes in the placement of equipment or the volume of rubble.
    5:00 PM PT

    The site is stable, with no readily apparent changes in the placement of equipment or the volume of rubble.

  6. Construction camera frame at 4:45 PM PT. The scene presents a remarkably consistent view, with no apparent adjustments to the positioning of equipment or the extent of the debris.
    4:45 PM PT

    The scene presents a remarkably consistent view, with no apparent adjustments to the positioning of equipment or the extent of the debris.

  7. Construction camera frame at 4:30 PM PT. The site appears quiet, with no immediately visible alterations to the positioning of machinery or the size of the debris.
    4:30 PM PT

    The site appears quiet, with no immediately visible alterations to the positioning of machinery or the size of the debris.

  8. Construction camera frame at 4:15 PM PT. The scene shows little discernible difference from the previous view, with equipment and debris remaining in the same positions.
    4:15 PM PT

    The scene shows little discernible difference from the previous view, with equipment and debris remaining in the same positions.

  9. Construction camera frame at 4:00 PM PT. The site remains largely as it was, with no obvious shifts in the equipment or debris arrangement.
    4:00 PM PT

    The site remains largely as it was, with no obvious shifts in the equipment or debris arrangement.

  10. 4 similar no-change frames3:00 PM–3:45 PM PT

    No visible change was reported between sampled frames; continuous inactivity cannot be inferred.

    1. Construction camera frame at 3:45 PM PT. The scene is holding steady, with no noticeable movement of equipment or alteration of the debris field.
      3:45 PM PT

      The scene is holding steady, with no noticeable movement of equipment or alteration of the debris field.

    2. Construction camera frame at 3:30 PM PT. The demolition site remains relatively static, showing no major changes in equipment placement or debris accumulation.
      3:30 PM PT

      The demolition site remains relatively static, showing no major changes in equipment placement or debris accumulation.

    3. Construction camera frame at 3:15 PM PT. A yellow loader is now moving debris within the central rubble pile, shifting material from one section to another. Otherwise, the layout of equipment and the overall scene remain essentially unchanged.
      3:15 PM PT

      A yellow loader is now moving debris within the central rubble pile, shifting material from one section to another. Otherwise, the layout of equipment and the overall scene remain essentially unchanged.

    4. Construction camera frame at 3:00 PM PT. The demolition area appears stable, with no apparent shifts in the positioning of equipment or the size of the rubble pile.
      3:00 PM PT

      The demolition area appears stable, with no apparent shifts in the positioning of equipment or the size of the rubble pile.

  11. Construction camera frame at 2:45 PM PT. A small group of people are now visible near the center of the site, apparently inspecting the rubble. Otherwise, the demolition area presents a similar picture to the last check, with equipment and debris largely unmoved.
    2:45 PM PT

    A small group of people are now visible near the center of the site, apparently inspecting the rubble. Otherwise, the demolition area presents a similar picture to the last check, with equipment and debris largely unmoved.

  12. Construction camera frame at 2:30 PM PT. The site shows no significant alterations, with machinery and debris remaining in the same positions.
    2:30 PM PT

    The site shows no significant alterations, with machinery and debris remaining in the same positions.

  13. Construction camera frame at 2:15 PM PT. The site’s configuration seems consistent, with no immediately visible alterations to machinery or the rubble’s extent.
    2:15 PM PT

    The site’s configuration seems consistent, with no immediately visible alterations to machinery or the rubble’s extent.

  14. Construction camera frame at 2:00 PM PT. The scene holds steady, with no discernible adjustments to the equipment or the growing debris pile.
    2:00 PM PT

    The scene holds steady, with no discernible adjustments to the equipment or the growing debris pile.

  15. Construction camera frame at 1:45 PM PT. The demolition site remains largely as it was, with no clear movement of equipment or significant changes to the debris field.
    1:45 PM PT

    The demolition site remains largely as it was, with no clear movement of equipment or significant changes to the debris field.

  16. 5 similar no-change frames12:30 PM–1:30 PM PT

    No visible change was reported between sampled frames; continuous inactivity cannot be inferred.

    1. Construction camera frame at 1:30 PM PT. The site appears quiet, with no noticeable alterations to the position of machinery or the extent of the rubble.
      1:30 PM PT

      The site appears quiet, with no noticeable alterations to the position of machinery or the extent of the rubble.

    2. Construction camera frame at 1:15 PM PT. The site maintains a stable appearance, with no apparent changes in equipment placement or debris accumulation.
      1:15 PM PT

      The site maintains a stable appearance, with no apparent changes in equipment placement or debris accumulation.

    3. Construction camera frame at 1:00 PM PT. The job site presents a familiar view, with no apparent shifts in equipment or the debris pile.
      1:00 PM PT

      The job site presents a familiar view, with no apparent shifts in equipment or the debris pile.

    4. Construction camera frame at 12:45 PM PT. The scene is remarkably unchanged, with all equipment and debris appearing to remain in place.
      12:45 PM PT

      The scene is remarkably unchanged, with all equipment and debris appearing to remain in place.

    5. Construction camera frame at 12:30 PM PT. The site’s layout is consistent between views, showing no significant movement of equipment or material.
      12:30 PM PT

      The site’s layout is consistent between views, showing no significant movement of equipment or material.

  17. Construction camera frame at 12:15 PM PT. Everything on site appears to be holding its position, with no immediately obvious shifts in equipment or debris.
    12:15 PM PT

    Everything on site appears to be holding its position, with no immediately obvious shifts in equipment or debris.

  18. 2 similar no-change frames11:45 AM–12:00 PM PT

    No visible change was reported between sampled frames; continuous inactivity cannot be inferred.

    1. Construction camera frame at 12:00 PM PT. The demolition site shows little discernible difference, with machinery and debris remaining in the same general positions.
      12:00 PM PT

      The demolition site shows little discernible difference, with machinery and debris remaining in the same general positions.

    2. Construction camera frame at 11:45 AM PT. The scene remains steady, with no noticeable alterations to the equipment positions or debris field over the last quarter hour.
      11:45 AM PT

      The scene remains steady, with no noticeable alterations to the equipment positions or debris field over the last quarter hour.

  19. Construction camera frame at 11:30 AM PT. The site’s appearance is largely the same as before, with equipment remaining in consistent positions.
    11:30 AM PT

    The site’s appearance is largely the same as before, with equipment remaining in consistent positions.

  20. 6 similar no-change frames10:00 AM–11:15 AM PT

    No visible change was reported between sampled frames; continuous inactivity cannot be inferred.

    1. Construction camera frame at 11:15 AM PT. The site continues to present a familiar view, with no new activity readily apparent.
      11:15 AM PT

      The site continues to present a familiar view, with no new activity readily apparent.

    2. Construction camera frame at 11:00 AM PT. The demolition site remains remarkably unchanged, with all equipment and the debris pile holding their previous positions.
      11:00 AM PT

      The demolition site remains remarkably unchanged, with all equipment and the debris pile holding their previous positions.

    3. Construction camera frame at 10:45 AM PT. The scene appears consistent, with no visible changes to the equipment or debris layout in the past fifteen minutes.
      10:45 AM PT

      The scene appears consistent, with no visible changes to the equipment or debris layout in the past fifteen minutes.

    4. Construction camera frame at 10:30 AM PT. The site holds a stable picture, with no discernible shifts in the arrangement of machinery or the size of the rubble pile.
      10:30 AM PT

      The site holds a stable picture, with no discernible shifts in the arrangement of machinery or the size of the rubble pile.

    5. Construction camera frame at 10:15 AM PT. The demolition site presents a largely static view, with no apparent equipment shifts or debris removal in the last fifteen minutes.
      10:15 AM PT

      The demolition site presents a largely static view, with no apparent equipment shifts or debris removal in the last fifteen minutes.

    6. Construction camera frame at 10:00 AM PT. The overall scene remains steady, with no noticeable movement of equipment or significant changes to the debris field.
      10:00 AM PT

      The overall scene remains steady, with no noticeable movement of equipment or significant changes to the debris field.

  21. Construction camera frame at 9:45 AM PT. The site shows minimal alteration, with the equipment and debris remaining largely as they were.
    9:45 AM PT

    The site shows minimal alteration, with the equipment and debris remaining largely as they were.

  22. 2 similar no-change frames9:15 AM–9:30 AM PT

    No visible change was reported between sampled frames; continuous inactivity cannot be inferred.

    1. Construction camera frame at 9:30 AM PT. The site maintains a consistent appearance, with equipment and debris remaining in the same positions.
      9:30 AM PT

      The site maintains a consistent appearance, with equipment and debris remaining in the same positions.

    2. Construction camera frame at 9:15 AM PT. The demolition site remains remarkably unchanged over the last quarter hour.
      9:15 AM PT

      The demolition site remains remarkably unchanged over the last quarter hour.

  23. Construction camera frame at 9:00 AM PT. The scene appears quite similar to the last check-in, with no immediately visible shifts in equipment positioning or debris levels.
    9:00 AM PT

    The scene appears quite similar to the last check-in, with no immediately visible shifts in equipment positioning or debris levels.

  24. Construction camera frame at 8:45 AM PT. A white van has entered the site from the street on the left and is now parked in the upper-left staging area.
    8:45 AM PT

    A white van has entered the site from the street on the left and is now parked in the upper-left staging area.

  25. Construction camera frame at 8:30 AM PT. The excavator in the center of the site is now actively digging into the rubble pile.
    8:30 AM PT

    The excavator in the center of the site is now actively digging into the rubble pile.

  26. Construction camera frame at 8:15 AM PT. The job site presents a static view, with no apparent movement of machinery or changes to the debris field.
    8:15 AM PT

    The job site presents a static view, with no apparent movement of machinery or changes to the debris field.

  27. Construction camera frame at 8:00 AM PT. A red vehicle has pulled into the site off the street on the left. Otherwise, the scene remains largely as it was fifteen minutes ago.
    8:00 AM PT

    A red vehicle has pulled into the site off the street on the left. Otherwise, the scene remains largely as it was fifteen minutes ago.

  28. Construction camera frame at 7:45 AM PT. The site holds steady, with equipment and the debris pile maintaining their previous positions.
    7:45 AM PT

    The site holds steady, with equipment and the debris pile maintaining their previous positions.

  29. Construction camera frame at 7:30 AM PT. The demolition zone remains stable, with no noticeable alterations to the layout of equipment or the debris pile.
    7:30 AM PT

    The demolition zone remains stable, with no noticeable alterations to the layout of equipment or the debris pile.

  30. Construction camera frame at 7:15 AM PT. A white box truck has entered the site via the driveway on the left.
    7:15 AM PT

    A white box truck has entered the site via the driveway on the left.

  31. 2 similar no-change frames6:45 AM–7:00 AM PT

    No visible change was reported between sampled frames; continuous inactivity cannot be inferred.

    1. Construction camera frame at 7:00 AM PT. The scene appears unchanged, with all equipment and debris remaining in the same positions as before.
      7:00 AM PT

      The scene appears unchanged, with all equipment and debris remaining in the same positions as before.

    2. Construction camera frame at 6:45 AM PT. The site’s appearance is remarkably consistent, showing no significant changes in the past fifteen minutes.
      6:45 AM PT

      The site’s appearance is remarkably consistent, showing no significant changes in the past fifteen minutes.

  32. Construction camera frame at 6:30 AM PT. A small orange traffic cone has appeared near the service road entrance on the right side of the frame.
    6:30 AM PT

    A small orange traffic cone has appeared near the service road entrance on the right side of the frame.

  33. Construction camera frame at 6:15 AM PT. The demolition site presents a consistent appearance, with no obvious changes to the equipment or debris field.
    6:15 AM PT

    The demolition site presents a consistent appearance, with no obvious changes to the equipment or debris field.

  34. 4 similar no-change frames5:15 AM–6:00 AM PT

    No visible change was reported between sampled frames; continuous inactivity cannot be inferred.

    1. Construction camera frame at 6:00 AM PT. The site holds steady, with no discernible shifts in equipment or debris arrangement over the last quarter hour.
      6:00 AM PT

      The site holds steady, with no discernible shifts in equipment or debris arrangement over the last quarter hour.

    2. Construction camera frame at 5:45 AM PT. The site continues in a stable state, with no noticeable alterations to equipment positioning or debris levels.
      5:45 AM PT

      The site continues in a stable state, with no noticeable alterations to equipment positioning or debris levels.

    3. Construction camera frame at 5:30 AM PT. The site remains quiet, with no apparent movement of machinery or materials in the last fifteen minutes.
      5:30 AM PT

      The site remains quiet, with no apparent movement of machinery or materials in the last fifteen minutes.

    4. Construction camera frame at 5:15 AM PT. The scene appears largely unchanged, though the lighting has shifted slightly.
      5:15 AM PT

      The scene appears largely unchanged, though the lighting has shifted slightly.

  35. Construction camera frame at 5:00 AM PT. Visibility remains low, although the site is a bit brighter now than it was fifteen minutes ago.
    5:00 AM PT

    Visibility remains low, although the site is a bit brighter now than it was fifteen minutes ago.

  36. 5 similar no-change frames12:00 AM–4:00 AM PT

    No visible change was reported between sampled frames; continuous inactivity cannot be inferred.

    1. Construction camera frame at 4:00 AM PT. No construction activity — the site is quiet.
      4:00 AM PT

      No construction activity — the site is quiet.

    2. Construction camera frame at 3:00 AM PT. No construction activity — the site is quiet.
      3:00 AM PT

      No construction activity — the site is quiet.

    3. Construction camera frame at 2:00 AM PT. No construction activity — the site is quiet.
      2:00 AM PT

      No construction activity — the site is quiet.

    4. Construction camera frame at 1:00 AM PT. No construction activity — the site is quiet.
      1:00 AM PT

      No construction activity — the site is quiet.

    5. Construction camera frame at 12:00 AM PT. No construction activity — the site is quiet.
      12:00 AM PT

      No construction activity — the site is quiet.

← Jun 28All daysJun 30 →