Skip to content
606Onni 606 · Bellevue
  • Live
  • Progress
  • Project
  • History
  • Search
606

606 (& 620) 106th Ave NE, Bellevue, WA

An independent guide to the Onni 606 development.

For the wider city, visit bellevue.wiki ↗

Project

  • Overview
  • Live cam
  • Latest progress
  • Construction log
  • News
  • Permit ledger
  • Construction impacts
  • The Towers
  • Skyline & height
  • Timeline
  • Gallery

Context

  • History of the block
  • Location
  • Developer

Help

  • Search the site
  • FAQ
  • Glossary
  • Sources & press
  • Contact
  • Updates feed
  • Sitemap

This is an independent, informational fan site. It is not affiliated with, sponsored by, or endorsed by Onni Group. Figures are compiled from public reporting and are approximate and subject to change. Project names and trademarks belong to their respective owners.

© 2026 onni606.com — built by an enthusiast.

  1. Home
  2. /Construction log
  3. /Sunday, August 9, 2026

Construction log

Sunday, August 9, 2026

70 snapshots from the live camera.


AI digest

The site was largely quiet, with equipment mostly holding position; a small pile of light-colored material grew near the lower-left excavator, and several smaller machines and vehicles shifted around the site. Compared with the week-earlier frame, the broad graded areas and overall layout appear much the same, with no substantial ground change visible today.

▶ Play this day as a timelapse
  1. Construction camera frame at 11:00 PM PT. No construction activity — the site is quiet.
    11:00 PM PT

    No construction activity — the site is quiet.

  2. 2 similar no-change frames9:00 PM–10:00 PM PT

    No visible change was reported between sampled frames; continuous inactivity cannot be inferred.

    1. Construction camera frame at 10:00 PM PT. No construction activity — the site is quiet.
      10:00 PM PT

      No construction activity — the site is quiet.

    2. Construction camera frame at 9:00 PM PT. No construction activity — the site is quiet.
      9:00 PM PT

      No construction activity — the site is quiet.

  3. Construction camera frame at 8:45 PM PT. The equipment layout across the site appears consistent between these views, with no noticeable repositioning of machinery or materials.
    8:45 PM PT

    The equipment layout across the site appears consistent between these views, with no noticeable repositioning of machinery or materials.

  4. Construction camera frame at 8:30 PM PT. The position of one of the excavators near the center of the site has shifted slightly, though the rest of the equipment and materials appear to remain in place.
    8:30 PM PT

    The position of one of the excavators near the center of the site has shifted slightly, though the rest of the equipment and materials appear to remain in place.

  5. Construction camera frame at 8:15 PM PT. The scene remains stable, with equipment and materials appearing in the same positions as they were a few minutes ago.
    8:15 PM PT

    The scene remains stable, with equipment and materials appearing in the same positions as they were a few minutes ago.

  6. Construction camera frame at 8:00 PM PT. A small, yellow machine has moved from the upper-left to a position near the center of the site, while the larger equipment remains in roughly the same spots.
    8:00 PM PT

    A small, yellow machine has moved from the upper-left to a position near the center of the site, while the larger equipment remains in roughly the same spots.

  7. Construction camera frame at 7:45 PM PT. The arrangement of equipment on site is holding steady, with no immediately apparent shifts in position over the last fifteen minutes.
    7:45 PM PT

    The arrangement of equipment on site is holding steady, with no immediately apparent shifts in position over the last fifteen minutes.

  8. Construction camera frame at 7:30 PM PT. A dark-colored pickup truck has moved from near the staging area in the southwest to a position closer to the center of the site. The rest of the equipment and material placement looks consistent with the prior view.
    7:30 PM PT

    A dark-colored pickup truck has moved from near the staging area in the southwest to a position closer to the center of the site. The rest of the equipment and material placement looks consistent with the prior view.

  9. Construction camera frame at 7:15 PM PT. A small, white van has entered the site via the driveway on the left and is now positioned near the equipment cluster in the upper-left quadrant. Otherwise, the arrangement of heavy machinery and materials remains largely unchanged.
    7:15 PM PT

    A small, white van has entered the site via the driveway on the left and is now positioned near the equipment cluster in the upper-left quadrant. Otherwise, the arrangement of heavy machinery and materials remains largely unchanged.

  10. Construction camera frame at 7:00 PM PT. The site appears quiet, with the arrangement of machines and materials holding relatively constant over the last quarter hour.
    7:00 PM PT

    The site appears quiet, with the arrangement of machines and materials holding relatively constant over the last quarter hour.

  11. Construction camera frame at 6:45 PM PT. The equipment layout is remarkably similar to the view from fifteen minutes ago, with no obvious repositioning of machines.
    6:45 PM PT

    The equipment layout is remarkably similar to the view from fifteen minutes ago, with no obvious repositioning of machines.

  12. Construction camera frame at 6:30 PM PT. The cluster of smaller machines near the center of the site has shifted slightly to the east. Otherwise, the overall layout of equipment and materials appears to be holding steady.
    6:30 PM PT

    The cluster of smaller machines near the center of the site has shifted slightly to the east. Otherwise, the overall layout of equipment and materials appears to be holding steady.

  13. 12 similar no-change frames3:30 PM–6:15 PM PT

    No visible change was reported between sampled frames; continuous inactivity cannot be inferred.

    1. Construction camera frame at 6:15 PM PT. The site shows no discernible alterations in the last fifteen minutes, with all visible machines holding their positions.
      6:15 PM PT

      The site shows no discernible alterations in the last fifteen minutes, with all visible machines holding their positions.

    2. Construction camera frame at 6:00 PM PT. The overall scene remains stable, with no apparent shifts in the location of machinery or stockpiled materials.
      6:00 PM PT

      The overall scene remains stable, with no apparent shifts in the location of machinery or stockpiled materials.

    3. Construction camera frame at 5:45 PM PT. The site presents a largely consistent picture, with equipment remaining in the same locations as observed previously.
      5:45 PM PT

      The site presents a largely consistent picture, with equipment remaining in the same locations as observed previously.

    4. Construction camera frame at 5:30 PM PT. The scene appears unchanged, with all machinery remaining in the same positions as fifteen minutes ago.
      5:30 PM PT

      The scene appears unchanged, with all machinery remaining in the same positions as fifteen minutes ago.

    5. Construction camera frame at 5:15 PM PT. The arrangement of equipment and materials remains consistent, showing no alterations in the last quarter hour.
      5:15 PM PT

      The arrangement of equipment and materials remains consistent, showing no alterations in the last quarter hour.

    6. Construction camera frame at 5:00 PM PT. Everything on site appears to be holding its place, with no visible changes in equipment positioning.
      5:00 PM PT

      Everything on site appears to be holding its place, with no visible changes in equipment positioning.

    7. Construction camera frame at 4:45 PM PT. The site remains quiet, with all visible equipment appearing in the same arrangement as before.
      4:45 PM PT

      The site remains quiet, with all visible equipment appearing in the same arrangement as before.

    8. Construction camera frame at 4:30 PM PT. The site maintains a static appearance, with no noticeable repositioning of any equipment or materials.
      4:30 PM PT

      The site maintains a static appearance, with no noticeable repositioning of any equipment or materials.

    9. Construction camera frame at 4:15 PM PT. The scene holds a familiar appearance, with no apparent movement of equipment or stockpiled materials.
      4:15 PM PT

      The scene holds a familiar appearance, with no apparent movement of equipment or stockpiled materials.

    10. Construction camera frame at 4:00 PM PT. Equipment across the site holds steady, with no discernible shifts in position over the last fifteen minutes.
      4:00 PM PT

      Equipment across the site holds steady, with no discernible shifts in position over the last fifteen minutes.

    11. Construction camera frame at 3:45 PM PT. The site appears unchanged, with all visible machinery and materials staying in the same locations.
      3:45 PM PT

      The site appears unchanged, with all visible machinery and materials staying in the same locations.

    12. Construction camera frame at 3:30 PM PT. The site presents a consistent view, with all equipment and materials remaining in the same positions.
      3:30 PM PT

      The site presents a consistent view, with all equipment and materials remaining in the same positions.

  14. Construction camera frame at 3:15 PM PT. The scene is remarkably still, with equipment and materials holding their positions across the site.
    3:15 PM PT

    The scene is remarkably still, with equipment and materials holding their positions across the site.

  15. Construction camera frame at 3:00 PM PT. The site remains largely as it was, with no visible changes in the positions of equipment or materials.
    3:00 PM PT

    The site remains largely as it was, with no visible changes in the positions of equipment or materials.

  16. Construction camera frame at 2:45 PM PT. The site displays a stable picture, with all visible machines and materials maintaining their locations.
    2:45 PM PT

    The site displays a stable picture, with all visible machines and materials maintaining their locations.

  17. 2 similar no-change frames2:15 PM–2:30 PM PT

    No visible change was reported between sampled frames; continuous inactivity cannot be inferred.

    1. Construction camera frame at 2:30 PM PT. The arrangement of heavy equipment across the site remains consistent, with no apparent movement or changes in position.
      2:30 PM PT

      The arrangement of heavy equipment across the site remains consistent, with no apparent movement or changes in position.

    2. Construction camera frame at 2:15 PM PT. The equipment arrangement across the site holds steady, showing no alterations in position or visible activity.
      2:15 PM PT

      The equipment arrangement across the site holds steady, showing no alterations in position or visible activity.

  18. Construction camera frame at 2:00 PM PT. NoSlight variations in lighting occur, but all machinery and materials remain stationary.
    2:00 PM PT

    NoSlight variations in lighting occur, but all machinery and materials remain stationary.

  19. Construction camera frame at 1:45 PM PT. The layout of equipment across the site appears unchanged, with no noticeable shifts in position.
    1:45 PM PT

    The layout of equipment across the site appears unchanged, with no noticeable shifts in position.

  20. Construction camera frame at 1:30 PM PT. The scene presents a consistent appearance, with all visible equipment and materials holding their positions.
    1:30 PM PT

    The scene presents a consistent appearance, with all visible equipment and materials holding their positions.

  21. Construction camera frame at 1:15 PM PT. Everything on the site isS remains in place, with no newL visible activity between frames.
    1:15 PM PT

    Everything on the site isS remains in place, with no newL visible activity between frames.

  22. Construction camera frame at 1:00 PM PT. The site remains largely static, with no discernible change in equipment positions or materials.
    1:00 PM PT

    The site remains largely static, with no discernible change in equipment positions or materials.

  23. Construction camera frame at 12:45 PM PT. The yellow machine previously in the lower center has shifted slightly toward the lower right corner of the graded area.
    12:45 PM PT

    The yellow machine previously in the lower center has shifted slightly toward the lower right corner of the graded area.

  24. Construction camera frame at 12:30 PM PT. A small yellow machine has moved into the lowerC center of the lower graded area.
    12:30 PM PT

    A small yellow machine has moved into the lowerC center of the lower graded area.

  25. Construction camera frame at 12:15 PM PT. No movement is visible across the block, as all machinery and materials remain exactly where they were.
    12:15 PM PT

    No movement is visible across the block, as all machinery and materials remain exactly where they were.

  26. Construction camera frame at 12:00 PM PT. The site shows a continued stillness, with equipment and materials holding their positions from the previous view.
    12:00 PM PT

    The site shows a continued stillness, with equipment and materials holding their positions from the previous view.

  27. 3 similar no-change frames11:15 AM–11:45 AM PT

    No visible change was reported between sampled frames; continuous inactivity cannot be inferred.

    1. Construction camera frame at 11:45 AM PT. The large equipment remains in the same locations, though a slight shift in the shadows suggests the sun continues its arc across the sky.
      11:45 AM PT

      The large equipment remains in the same locations, though a slight shift in the shadows suggests the sun continues its arc across the sky.

    2. Construction camera frame at 11:30 AM PT. The positions of the equipment and materials appear unchanged, though the sunlight continues to shift across the site.
      11:30 AM PT

      The positions of the equipment and materials appear unchanged, though the sunlight continues to shift across the site.

    3. Construction camera frame at 11:15 AM PT. The scene presents a consistent picture, with no noticeable movement of equipment or materials during this interval.
      11:15 AM PT

      The scene presents a consistent picture, with no noticeable movement of equipment or materials during this interval.

  28. Construction camera frame at 11:00 AM PT. Across the site, the arrangement of the machinery and stockpiles appears stable, with only minor shifts in shadow patterns.
    11:00 AM PT

    Across the site, the arrangement of the machinery and stockpiles appears stable, with only minor shifts in shadow patterns.

  29. 2 similar no-change frames10:30 AM–10:45 AM PT

    No visible change was reported between sampled frames; continuous inactivity cannot be inferred.

    1. Construction camera frame at 10:45 AM PT. The site remains quiet, with no discernible shift in the positions of the machines or materials between these views.
      10:45 AM PT

      The site remains quiet, with no discernible shift in the positions of the machines or materials between these views.

    2. Construction camera frame at 10:30 AM PT. The arrangement of heavy equipment across the site appears static, though the pattern of sunlight and shadow continues to evolve.
      10:30 AM PT

      The arrangement of heavy equipment across the site appears static, though the pattern of sunlight and shadow continues to evolve.

  30. Construction camera frame at 10:15 AM PT. The layout of equipment on site remains consistent, though the shadows cast across the graded area have shifted slightly.
    10:15 AM PT

    The layout of equipment on site remains consistent, though the shadows cast across the graded area have shifted slightly.

  31. Construction camera frame at 10:00 AM PT. The scene is holding remarkably still, with no obvious alterations in the arrangement of equipment or materials.
    10:00 AM PT

    The scene is holding remarkably still, with no obvious alterations in the arrangement of equipment or materials.

  32. Construction camera frame at 9:45 AM PT. The site appears largely unchanged, though shadows have shifted slightly with the sun’s movement.
    9:45 AM PT

    The site appears largely unchanged, though shadows have shifted slightly with the sun’s movement.

  33. Construction camera frame at 9:30 AM PT. The shadows have lengthened across the site, but the positions of the machines and stockpiled material remain consistent.
    9:30 AM PT

    The shadows have lengthened across the site, but the positions of the machines and stockpiled material remain consistent.

  34. 2 similar no-change frames9:00 AM–9:15 AM PT

    No visible change was reported between sampled frames; continuous inactivity cannot be inferred.

    1. Construction camera frame at 9:15 AM PT. No movement or changes are visible across the site between these two frames.
      9:15 AM PT

      No movement or changes are visible across the site between these two frames.

    2. Construction camera frame at 9:00 AM PT. The scene holds steady, with no discernible shifts in equipment positions or material arrangement over the last quarter-hour.
      9:00 AM PT

      The scene holds steady, with no discernible shifts in equipment positions or material arrangement over the last quarter-hour.

  35. Construction camera frame at 8:45 AM PT. The light has subtly shifted across the site, but the positions of equipment and materials appear to be consistent.
    8:45 AM PT

    The light has subtly shifted across the site, but the positions of equipment and materials appear to be consistent.

  36. Construction camera frame at 8:30 AM PT. A small piece of equipment has moved from the center of the site toward the lower-right corner. Otherwise, the scene remains very similar to fifteen minutes ago.
    8:30 AM PT

    A small piece of equipment has moved from the center of the site toward the lower-right corner. Otherwise, the scene remains very similar to fifteen minutes ago.

  37. Construction camera frame at 8:15 AM PT. The arrangement of equipment appears consistent, though the pile of lighter material near the excavator has continued to expand slightly.
    8:15 AM PT

    The arrangement of equipment appears consistent, though the pile of lighter material near the excavator has continued to expand slightly.

  38. Construction camera frame at 8:00 AM PT. The scene appears largely unchanged, with the same equipment in the same positions as fifteen minutes ago.
    8:00 AM PT

    The scene appears largely unchanged, with the same equipment in the same positions as fifteen minutes ago.

  39. Construction camera frame at 7:45 AM PT. The pile of lighter material near the excavator has grown noticeably larger over the last fifteen minutes. Aside from that, the equipment and general layout of the site remain as they were.
    7:45 AM PT

    The pile of lighter material near the excavator has grown noticeably larger over the last fifteen minutes. Aside from that, the equipment and general layout of the site remain as they were.

  40. Construction camera frame at 7:30 AM PT. A small pile of lighter-colored material has formed near the excavator in the lower-left portion of the site. Otherwise, the arrangement of equipment and the overall scene remain consistent.
    7:30 AM PT

    A small pile of lighter-colored material has formed near the excavator in the lower-left portion of the site. Otherwise, the arrangement of equipment and the overall scene remain consistent.

  41. Construction camera frame at 7:15 AM PT. Very little seems to have altered on the site in the last fifteen minutes, though the light has shifted slightly.
    7:15 AM PT

    Very little seems to have altered on the site in the last fifteen minutes, though the light has shifted slightly.

  42. Construction camera frame at 7:00 AM PT. Equipment remains in largely the same arrangement as before, though a small, dark object has appeared near the center of the site.
    7:00 AM PT

    Equipment remains in largely the same arrangement as before, though a small, dark object has appeared near the center of the site.

  43. 11 similar no-change frames12:00 AM–6:45 AM PT

    No visible change was reported between sampled frames; continuous inactivity cannot be inferred.

    1. Construction camera frame at 6:45 AM PT. The view across the site is stable, showing no significant alterations to equipment placement in the last fifteen minutes.
      6:45 AM PT

      The view across the site is stable, showing no significant alterations to equipment placement in the last fifteen minutes.

    2. Construction camera frame at 6:30 AM PT. The scene remains remarkably consistent, with no noticeable shifts in equipment positions over the last quarter of an hour.
      6:30 AM PT

      The scene remains remarkably consistent, with no noticeable shifts in equipment positions over the last quarter of an hour.

    3. Construction camera frame at 6:15 AM PT. The site appears largely unchanged, with the same equipment visible in the same general locations as fifteen minutes ago.
      6:15 AM PT

      The site appears largely unchanged, with the same equipment visible in the same general locations as fifteen minutes ago.

    4. Construction camera frame at 6:00 AM PT. The tracked drill rig near the southwest corner has shifted slightly to the east. Otherwise, the scene appears much the same, with equipment remaining in largely the same positions.
      6:00 AM PT

      The tracked drill rig near the southwest corner has shifted slightly to the east. Otherwise, the scene appears much the same, with equipment remaining in largely the same positions.

    5. Construction camera frame at 5:45 AM PT. Daylight has returned to the site, revealing several pieces of heavy equipment now visible across the graded area. The scene remains largely static, with no apparent movement of machinery or vehicles in the last fifteen minutes.
      5:45 AM PT

      Daylight has returned to the site, revealing several pieces of heavy equipment now visible across the graded area. The scene remains largely static, with no apparent movement of machinery or vehicles in the last fifteen minutes.

    6. Construction camera frame at 5:00 AM PT. No construction activity — the site is quiet.
      5:00 AM PT

      No construction activity — the site is quiet.

    7. Construction camera frame at 4:00 AM PT. No construction activity — the site is quiet.
      4:00 AM PT

      No construction activity — the site is quiet.

    8. Construction camera frame at 3:00 AM PT. No construction activity — the site is quiet.
      3:00 AM PT

      No construction activity — the site is quiet.

    9. Construction camera frame at 2:00 AM PT. No construction activity — the site is quiet.
      2:00 AM PT

      No construction activity — the site is quiet.

    10. Construction camera frame at 1:00 AM PT. No construction activity — the site is quiet.
      1:00 AM PT

      No construction activity — the site is quiet.

    11. Construction camera frame at 12:00 AM PT. No construction activity — the site is quiet.
      12:00 AM PT

      No construction activity — the site is quiet.

← Aug 8All daysAug 10 →