Skip to content
606Onni 606 · Bellevue
  • Live
  • Progress
  • Project
  • History
  • Search
606

606 (& 620) 106th Ave NE, Bellevue, WA

An independent guide to the Onni 606 development.

For the wider city, visit bellevue.wiki ↗

Project

  • Overview
  • Live cam
  • Latest progress
  • Construction log
  • News
  • Permit ledger
  • Construction impacts
  • The Towers
  • Skyline & height
  • Timeline
  • Gallery

Context

  • History of the block
  • Location
  • Developer

Help

  • Search the site
  • FAQ
  • Glossary
  • Sources & press
  • Contact
  • Updates feed
  • Sitemap

This is an independent, informational fan site. It is not affiliated with, sponsored by, or endorsed by Onni Group. Figures are compiled from public reporting and are approximate and subject to change. Project names and trademarks belong to their respective owners.

© 2026 onni606.com — built by an enthusiast.

  1. Home
  2. /Construction log
  3. /Tuesday, August 25, 2026

Construction log

Tuesday, August 25, 2026

67 snapshots from the live camera.


AI digest

The site remained largely quiet, with machinery clustered across the upper area and only minor repositioning; several vehicles appeared at the access points during the day. Compared with August 18, the central ground area looks more uneven and cut down, though the frames do not show a clear change in the site’s overall layout.

▶ Play this day as a timelapse
  1. Construction camera frame at 11:00 PM PT. No construction activity — the site is quiet.
    11:00 PM PT

    No construction activity — the site is quiet.

  2. 3 similar no-change frames8:15 PM–10:00 PM PT

    No visible change was reported between sampled frames; continuous inactivity cannot be inferred.

    1. Construction camera frame at 10:00 PM PT. No construction activity — the site is quiet.
      10:00 PM PT

      No construction activity — the site is quiet.

    2. Construction camera frame at 9:00 PM PT. No construction activity — the site is quiet.
      9:00 PM PT

      No construction activity — the site is quiet.

    3. Construction camera frame at 8:15 PM PT. The layout of the site remains largely unchanged, with equipment holding its previous positions.
      8:15 PM PT

      The layout of the site remains largely unchanged, with equipment holding its previous positions.

  3. Construction camera frame at 8:00 PM PT. The scene remains stable, with the equipment spread across the site appearing in roughly the same arrangement.
    8:00 PM PT

    The scene remains stable, with the equipment spread across the site appearing in roughly the same arrangement.

  4. Construction camera frame at 7:45 PM PT. The site appears quiet, with no noticeable repositioning of the equipment or materials visible in this comparison.
    7:45 PM PT

    The site appears quiet, with no noticeable repositioning of the equipment or materials visible in this comparison.

  5. Construction camera frame at 7:30 PM PT. The site’s configuration is holding steady, with the machinery remaining in the same locations.
    7:30 PM PT

    The site’s configuration is holding steady, with the machinery remaining in the same locations.

  6. Construction camera frame at 7:15 PM PT. The arrangement of equipment on site remains consistent between these views.
    7:15 PM PT

    The arrangement of equipment on site remains consistent between these views.

  7. Construction camera frame at 7:00 PM PT. The site shows minimal variation, with the machines and graded areas holding their positions.
    7:00 PM PT

    The site shows minimal variation, with the machines and graded areas holding their positions.

  8. 2 similar no-change frames6:30 PM–6:45 PM PT

    No visible change was reported between sampled frames; continuous inactivity cannot be inferred.

    1. Construction camera frame at 6:45 PM PT. The site maintains a consistent appearance, with no visible shifts in the location of equipment or materials.
      6:45 PM PT

      The site maintains a consistent appearance, with no visible shifts in the location of equipment or materials.

    2. Construction camera frame at 6:30 PM PT. The view is largely unchanged, with the equipment and grading appearing in similar positions as before.
      6:30 PM PT

      The view is largely unchanged, with the equipment and grading appearing in similar positions as before.

  9. Construction camera frame at 6:15 PM PT. The scene presents a stable picture, with no immediately apparent adjustments to the placement of equipment or vehicles.
    6:15 PM PT

    The scene presents a stable picture, with no immediately apparent adjustments to the placement of equipment or vehicles.

  10. 2 similar no-change frames5:45 PM–6:00 PM PT

    No visible change was reported between sampled frames; continuous inactivity cannot be inferred.

    1. Construction camera frame at 6:00 PM PT. The site appears quiet, with no noticeable alterations to the arrangement of machinery or vehicles.
      6:00 PM PT

      The site appears quiet, with no noticeable alterations to the arrangement of machinery or vehicles.

    2. Construction camera frame at 5:45 PM PT. Equipment remains in largely the same positions, showing no significant movement in the last fifteen minutes.
      5:45 PM PT

      Equipment remains in largely the same positions, showing no significant movement in the last fifteen minutes.

  11. Construction camera frame at 5:30 PM PT. The overall scene holds steady, with equipment appearing unmoved in the latest view.
    5:30 PM PT

    The overall scene holds steady, with equipment appearing unmoved in the latest view.

  12. Construction camera frame at 5:15 PM PT. The site remains in a similar state as the last view, with no discernible changes in equipment positioning.
    5:15 PM PT

    The site remains in a similar state as the last view, with no discernible changes in equipment positioning.

  13. Construction camera frame at 5:00 PM PT. A red vehicle has shifted position near the driveway on the left side of the frame.
    5:00 PM PT

    A red vehicle has shifted position near the driveway on the left side of the frame.

  14. 2 similar no-change frames4:30 PM–4:45 PM PT

    No visible change was reported between sampled frames; continuous inactivity cannot be inferred.

    1. Construction camera frame at 4:45 PM PT. The site shows no visible shifts in equipment placement during the last quarter hour.
      4:45 PM PT

      The site shows no visible shifts in equipment placement during the last quarter hour.

    2. Construction camera frame at 4:30 PM PT. The scene is largely static, with the equipment maintaining its positions from the previous view.
      4:30 PM PT

      The scene is largely static, with the equipment maintaining its positions from the previous view.

  15. Construction camera frame at 4:15 PM PT. A red truck is now visible near the left edge of the frame, having entered the site from the street.
    4:15 PM PT

    A red truck is now visible near the left edge of the frame, having entered the site from the street.

  16. Construction camera frame at 4:00 PM PT. The site appears stable, with the arrangement of machinery remaining consistent over the last fifteen minutes.
    4:00 PM PT

    The site appears stable, with the arrangement of machinery remaining consistent over the last fifteen minutes.

  17. 3 similar no-change frames3:15 PM–3:45 PM PT

    No visible change was reported between sampled frames; continuous inactivity cannot be inferred.

    1. Construction camera frame at 3:45 PM PT. The view of the site is consistent with the prior check, with no apparent movement of equipment or vehicles.
      3:45 PM PT

      The view of the site is consistent with the prior check, with no apparent movement of equipment or vehicles.

    2. Construction camera frame at 3:30 PM PT. Activity on the site is minimal, with the positions of equipment remaining largely static between these views.
      3:30 PM PT

      Activity on the site is minimal, with the positions of equipment remaining largely static between these views.

    3. Construction camera frame at 3:15 PM PT. The site remains relatively unchanged, with equipment appearing in the same positions as before.
      3:15 PM PT

      The site remains relatively unchanged, with equipment appearing in the same positions as before.

  18. Construction camera frame at 3:00 PM PT. A white vehicle has entered the site via the access point on the left.
    3:00 PM PT

    A white vehicle has entered the site via the access point on the left.

  19. Construction camera frame at 2:45 PM PT. The scene looks largely as it did moments ago, though a piece of equipment near the center of the site has shifted position slightly.
    2:45 PM PT

    The scene looks largely as it did moments ago, though a piece of equipment near the center of the site has shifted position slightly.

  20. Construction camera frame at 2:30 PM PT. A piece of heavy equipment has moved from the central area to the lower right corner of the site.
    2:30 PM PT

    A piece of heavy equipment has moved from the central area to the lower right corner of the site.

  21. Construction camera frame at 2:15 PM PT. The site presents a similar picture to the last check, though a white van is now positioned near the access point on the left.
    2:15 PM PT

    The site presents a similar picture to the last check, though a white van is now positioned near the access point on the left.

  22. Construction camera frame at 2:00 PM PT. The arrangement of machinery across the site appears consistent between these views, though a small dark object is now visible near the center.
    2:00 PM PT

    The arrangement of machinery across the site appears consistent between these views, though a small dark object is now visible near the center.

  23. Construction camera frame at 1:45 PM PT. Activity on site is subtle, but a piece of heavy equipment near the center has rotated slightly.
    1:45 PM PT

    Activity on site is subtle, but a piece of heavy equipment near the center has rotated slightly.

  24. Construction camera frame at 1:30 PM PT. The scene is holding steady, with the arrangement of equipment appearing almost identical to the previous view.
    1:30 PM PT

    The scene is holding steady, with the arrangement of equipment appearing almost identical to the previous view.

  25. Construction camera frame at 1:15 PM PT. The site remains remarkably unchanged, though a white vehicle is now visible parked near the driveway on the left.
    1:15 PM PT

    The site remains remarkably unchanged, though a white vehicle is now visible parked near the driveway on the left.

  26. Construction camera frame at 1:00 PM PT. A small yellow machine has shifted position within the central area of the site.
    1:00 PM PT

    A small yellow machine has shifted position within the central area of the site.

  27. Construction camera frame at 12:45 PM PT. A white truck has entered the site via the service road on the right side of the frame.
    12:45 PM PT

    A white truck has entered the site via the service road on the right side of the frame.

  28. Construction camera frame at 12:30 PM PT. The site shows minimal alteration, with the same arrangement of machinery visible in both views.
    12:30 PM PT

    The site shows minimal alteration, with the same arrangement of machinery visible in both views.

  29. Construction camera frame at 12:15 PM PT. The scene appears very similar to the last check, with no discernible movement of machinery or vehicles.
    12:15 PM PT

    The scene appears very similar to the last check, with no discernible movement of machinery or vehicles.

  30. Construction camera frame at 12:00 PM PT. The site presents a largely consistent picture, with only a small dark object appearing near the center of the open area.
    12:00 PM PT

    The site presents a largely consistent picture, with only a small dark object appearing near the center of the open area.

  31. 2 similar no-change frames11:30 AM–11:45 AM PT

    No visible change was reported between sampled frames; continuous inactivity cannot be inferred.

    1. Construction camera frame at 11:45 AM PT. The equipment layout is largely static, though a blue truck now sits near the driveway on the left side of the frame where it wasn't visible before.
      11:45 AM PT

      The equipment layout is largely static, though a blue truck now sits near the driveway on the left side of the frame where it wasn't visible before.

    2. Construction camera frame at 11:30 AM PT. The scene remains stable, with no apparent shifts in equipment positioning or site activity over the past fifteen minutes.
      11:30 AM PT

      The scene remains stable, with no apparent shifts in equipment positioning or site activity over the past fifteen minutes.

  32. Construction camera frame at 11:15 AM PT. The arrangement of equipment across the site holds steady, with only slight adjustments to the shadows cast by the buildings.
    11:15 AM PT

    The arrangement of equipment across the site holds steady, with only slight adjustments to the shadows cast by the buildings.

  33. Construction camera frame at 11:00 AM PT. The shadows have lengthened across the site, but the position of equipment and vehicles appears to be the same as before.
    11:00 AM PT

    The shadows have lengthened across the site, but the position of equipment and vehicles appears to be the same as before.

  34. Construction camera frame at 10:45 AM PT. A small, dark-colored vehicle has entered the site via the driveway on the left side of the frame. Otherwise, the arrangement of machinery and the overall scene remain consistent.
    10:45 AM PT

    A small, dark-colored vehicle has entered the site via the driveway on the left side of the frame. Otherwise, the arrangement of machinery and the overall scene remain consistent.

  35. 2 similar no-change frames10:15 AM–10:30 AM PT

    No visible change was reported between sampled frames; continuous inactivity cannot be inferred.

    1. Construction camera frame at 10:30 AM PT. A single worker is visible now in the lower-right quadrant of the site, where there was none previously. Otherwise, the equipment and overall scene appear unchanged.
      10:30 AM PT

      A single worker is visible now in the lower-right quadrant of the site, where there was none previously. Otherwise, the equipment and overall scene appear unchanged.

    2. Construction camera frame at 10:15 AM PT. The site appears quiet, with no visible movement of equipment or vehicles between these frames.
      10:15 AM PT

      The site appears quiet, with no visible movement of equipment or vehicles between these frames.

  36. Construction camera frame at 10:00 AM PT. The layout of the site remains largely the same, though shadows have shifted across the graded area.
    10:00 AM PT

    The layout of the site remains largely the same, though shadows have shifted across the graded area.

  37. Construction camera frame at 9:45 AM PT. The equipment arrangement appears stable, though a small orange structure has shifted slightly closer to the center of the block.
    9:45 AM PT

    The equipment arrangement appears stable, though a small orange structure has shifted slightly closer to the center of the block.

  38. Construction camera frame at 9:30 AM PT. The scene is holding steady, with the arrangement of equipment appearing virtually identical to the previous view.
    9:30 AM PT

    The scene is holding steady, with the arrangement of equipment appearing virtually identical to the previous view.

  39. Construction camera frame at 9:15 AM PT. The site maintains a consistent appearance, with no discernible shifts in equipment positions or vehicle activity.
    9:15 AM PT

    The site maintains a consistent appearance, with no discernible shifts in equipment positions or vehicle activity.

  40. Construction camera frame at 9:00 AM PT. A small, white truck has entered the site via the driveway on the left, and is now positioned near the center of the block. Otherwise, the layout of equipment and the overall scene remain consistent.
    9:00 AM PT

    A small, white truck has entered the site via the driveway on the left, and is now positioned near the center of the block. Otherwise, the layout of equipment and the overall scene remain consistent.

  41. 2 similar no-change frames8:30 AM–8:45 AM PT

    No visible change was reported between sampled frames; continuous inactivity cannot be inferred.

    1. Construction camera frame at 8:45 AM PT. The site presents a largely unchanged view, with the equipment remaining in the same positions as observed moments ago.
      8:45 AM PT

      The site presents a largely unchanged view, with the equipment remaining in the same positions as observed moments ago.

    2. Construction camera frame at 8:30 AM PT. The scene is remarkably static, with the equipment and materials appearing in nearly the same positions as before.
      8:30 AM PT

      The scene is remarkably static, with the equipment and materials appearing in nearly the same positions as before.

  42. Construction camera frame at 8:15 AM PT. The arrangement of the yellow machines in the center has undergone a slight adjustment, with one piece now facing a different direction. Beyond that, the site’s overall appearance remains consistent.
    8:15 AM PT

    The arrangement of the yellow machines in the center has undergone a slight adjustment, with one piece now facing a different direction. Beyond that, the site’s overall appearance remains consistent.

  43. Construction camera frame at 8:00 AM PT. The site appears largely as it was fifteen minutes ago, with no visible movement of equipment or vehicles.
    8:00 AM PT

    The site appears largely as it was fifteen minutes ago, with no visible movement of equipment or vehicles.

  44. Construction camera frame at 7:45 AM PT. The grouping of yellow machinery near the center has subtly rearranged itself, with a couple of pieces appearing to have shifted position. Otherwise, the scene largely holds steady, with no new vehicles entering or leaving the site.
    7:45 AM PT

    The grouping of yellow machinery near the center has subtly rearranged itself, with a couple of pieces appearing to have shifted position. Otherwise, the scene largely holds steady, with no new vehicles entering or leaving the site.

  45. 5 similar no-change frames6:30 AM–7:30 AM PT

    No visible change was reported between sampled frames; continuous inactivity cannot be inferred.

    1. Construction camera frame at 7:30 AM PT. The small, red structure is now slightly closer to the center of the site, and a blue object has appeared near the right edge of the frame. Otherwise, the arrangement of machinery and the overall scene remain unchanged.
      7:30 AM PT

      The small, red structure is now slightly closer to the center of the site, and a blue object has appeared near the right edge of the frame. Otherwise, the arrangement of machinery and the overall scene remain unchanged.

    2. Construction camera frame at 7:15 AM PT. The site maintains a quiet state, showing no discernible alterations in equipment placement or activity around the perimeter.
      7:15 AM PT

      The site maintains a quiet state, showing no discernible alterations in equipment placement or activity around the perimeter.

    3. Construction camera frame at 7:00 AM PT. The scene remains quite still, with no noticeable shifts in equipment positions or vehicle movement during the last fifteen minutes.
      7:00 AM PT

      The scene remains quite still, with no noticeable shifts in equipment positions or vehicle movement during the last fifteen minutes.

    4. Construction camera frame at 6:45 AM PT. A small, red structure has moved slightly further into the central area of the site. Beyond that, the equipment and overall scene appear to remain in the same positions as before.
      6:45 AM PT

      A small, red structure has moved slightly further into the central area of the site. Beyond that, the equipment and overall scene appear to remain in the same positions as before.

    5. Construction camera frame at 6:30 AM PT. The arrangement of equipment in the central area has shifted slightly, with one piece now positioned further to the right. Aside from that small adjustment, the scene remains unchanged, with no apparent activity along the site's edges.
      6:30 AM PT

      The arrangement of equipment in the central area has shifted slightly, with one piece now positioned further to the right. Aside from that small adjustment, the scene remains unchanged, with no apparent activity along the site's edges.

  46. Construction camera frame at 6:15 AM PT. Several pieces of heavy equipment are now visible in the central area, where the earlier frame showed a relatively clear space. Otherwise, conditions on site and along the perimeter remain consistent.
    6:15 AM PT

    Several pieces of heavy equipment are now visible in the central area, where the earlier frame showed a relatively clear space. Otherwise, conditions on site and along the perimeter remain consistent.

  47. 7 similar no-change frames12:00 AM–6:00 AM PT

    No visible change was reported between sampled frames; continuous inactivity cannot be inferred.

    1. Construction camera frame at 6:00 AM PT. The site appears a bit brighter now, with some shapes becoming more defined in the central area. Otherwise, the scene remains largely static with no visible movement of equipment or vehicles.
      6:00 AM PT

      The site appears a bit brighter now, with some shapes becoming more defined in the central area. Otherwise, the scene remains largely static with no visible movement of equipment or vehicles.

    2. Construction camera frame at 5:00 AM PT. No construction activity — the site is quiet.
      5:00 AM PT

      No construction activity — the site is quiet.

    3. Construction camera frame at 4:00 AM PT. No construction activity — the site is quiet.
      4:00 AM PT

      No construction activity — the site is quiet.

    4. Construction camera frame at 3:00 AM PT. No construction activity — the site is quiet.
      3:00 AM PT

      No construction activity — the site is quiet.

    5. Construction camera frame at 2:00 AM PT. No construction activity — the site is quiet.
      2:00 AM PT

      No construction activity — the site is quiet.

    6. Construction camera frame at 1:00 AM PT. No construction activity — the site is quiet.
      1:00 AM PT

      No construction activity — the site is quiet.

    7. Construction camera frame at 12:00 AM PT. No construction activity — the site is quiet.
      12:00 AM PT

      No construction activity — the site is quiet.

← Aug 24All daysAug 26 →