Skip to content
606Onni 606 · Bellevue
  • Live
  • Progress
  • Project
  • History
  • Search
606

606 (& 620) 106th Ave NE, Bellevue, WA

An independent guide to the Onni 606 development.

For the wider city, visit bellevue.wiki ↗

Project

  • Overview
  • Live cam
  • Latest progress
  • Construction log
  • News
  • Permit ledger
  • Construction impacts
  • The Towers
  • Skyline & height
  • Timeline
  • Gallery

Context

  • History of the block
  • Location
  • Developer

Help

  • Search the site
  • FAQ
  • Glossary
  • Sources & press
  • Contact
  • Updates feed
  • Sitemap

This is an independent, informational fan site. It is not affiliated with, sponsored by, or endorsed by Onni Group. Figures are compiled from public reporting and are approximate and subject to change. Project names and trademarks belong to their respective owners.

© 2026 onni606.com — built by an enthusiast.

  1. Home
  2. /Construction log
  3. /Wednesday, August 26, 2026

Construction log

Wednesday, August 26, 2026

67 snapshots from the live camera.


AI digest

The site remained largely quiet throughout the day, with minor shifts in equipment positions, including an excavator rotating and a small loader moving to the center. Several vehicles, including red trucks and a white vehicle, entered the site at various times.

▶ Play this day as a timelapse
  1. Construction camera frame at 11:00 PM PT. No construction activity — the site is quiet.
    11:00 PM PT

    No construction activity — the site is quiet.

  2. 5 similar no-change frames7:45 PM–10:00 PM PT

    No visible change was reported between sampled frames; continuous inactivity cannot be inferred.

    1. Construction camera frame at 10:00 PM PT. No construction activity — the site is quiet.
      10:00 PM PT

      No construction activity — the site is quiet.

    2. Construction camera frame at 9:00 PM PT. No construction activity — the site is quiet.
      9:00 PM PT

      No construction activity — the site is quiet.

    3. Construction camera frame at 8:15 PM PT. Visibility remains low, and the site appears still with no apparent changes in equipment or activity.
      8:15 PM PT

      Visibility remains low, and the site appears still with no apparent changes in equipment or activity.

    4. Construction camera frame at 8:00 PM PT. The site presents a static view, with all visible machinery and materials remaining in their prior locations.
      8:00 PM PT

      The site presents a static view, with all visible machinery and materials remaining in their prior locations.

    5. Construction camera frame at 7:45 PM PT. The arrangement of machinery and materials appears consistent between the two views, showing no noticeable alterations.
      7:45 PM PT

      The arrangement of machinery and materials appears consistent between the two views, showing no noticeable alterations.

  3. Construction camera frame at 7:30 PM PT. Equipment positions across the site haven’t altered in the last fifteen minutes, maintaining the same layout as previously observed.
    7:30 PM PT

    Equipment positions across the site haven’t altered in the last fifteen minutes, maintaining the same layout as previously observed.

  4. 3 similar no-change frames6:45 PM–7:15 PM PT

    No visible change was reported between sampled frames; continuous inactivity cannot be inferred.

    1. Construction camera frame at 7:15 PM PT. The site appears quiet, with no discernible shifts in equipment or activity over the last quarter hour.
      7:15 PM PT

      The site appears quiet, with no discernible shifts in equipment or activity over the last quarter hour.

    2. Construction camera frame at 7:00 PM PT. The scene remains largely unchanged, with the equipment and materials holding their positions from the previous view.
      7:00 PM PT

      The scene remains largely unchanged, with the equipment and materials holding their positions from the previous view.

    3. Construction camera frame at 6:45 PM PT. No movement is visible across the site, and all equipment remains in place.
      6:45 PM PT

      No movement is visible across the site, and all equipment remains in place.

  5. Construction camera frame at 6:30 PM PT. The red vehicle previously visible near the left side of the frame has shifted slightly further into the site. Everything else on the block remains in the same arrangement as before.
    6:30 PM PT

    The red vehicle previously visible near the left side of the frame has shifted slightly further into the site. Everything else on the block remains in the same arrangement as before.

  6. Construction camera frame at 6:15 PM PT. The scene is holding its form, with no apparent adjustments to equipment placement during the interval.
    6:15 PM PT

    The scene is holding its form, with no apparent adjustments to equipment placement during the interval.

  7. Construction camera frame at 6:00 PM PT. The arrangement of the machinery on site appears to be holding steady, with no obvious movement detected in the last fifteen minutes.
    6:00 PM PT

    The arrangement of the machinery on site appears to be holding steady, with no obvious movement detected in the last fifteen minutes.

  8. Construction camera frame at 5:45 PM PT. The scene presents a largely stable picture, with the arrangement of equipment appearing consistent between the two views.
    5:45 PM PT

    The scene presents a largely stable picture, with the arrangement of equipment appearing consistent between the two views.

  9. 5 similar no-change frames4:30 PM–5:30 PM PT

    No visible change was reported between sampled frames; continuous inactivity cannot be inferred.

    1. Construction camera frame at 5:30 PM PT. The site appears quiet, with no discernible shifts in the positions of machinery or materials over the last fifteen minutes.
      5:30 PM PT

      The site appears quiet, with no discernible shifts in the positions of machinery or materials over the last fifteen minutes.

    2. Construction camera frame at 5:15 PM PT. The scene remains unchanged, with all equipment holding its previous positions on the site.
      5:15 PM PT

      The scene remains unchanged, with all equipment holding its previous positions on the site.

    3. Construction camera frame at 5:00 PM PT. A small red vehicle has entered the site via the driveway on the left side of the frame. Otherwise, the scene remains consistent, with equipment in the same locations as before.
      5:00 PM PT

      A small red vehicle has entered the site via the driveway on the left side of the frame. Otherwise, the scene remains consistent, with equipment in the same locations as before.

    4. Construction camera frame at 4:45 PM PT. The site shows no significant alterations in the last fifteen minutes, maintaining a consistent appearance.
      4:45 PM PT

      The site shows no significant alterations in the last fifteen minutes, maintaining a consistent appearance.

    5. Construction camera frame at 4:30 PM PT. Equipment positions appear static, with no discernible changes across the site in the last quarter of an hour.
      4:30 PM PT

      Equipment positions appear static, with no discernible changes across the site in the last quarter of an hour.

  10. Construction camera frame at 4:15 PM PT. The view across the site is remarkably similar, with no obvious repositioning of equipment or materials detected.
    4:15 PM PT

    The view across the site is remarkably similar, with no obvious repositioning of equipment or materials detected.

  11. Construction camera frame at 4:00 PM PT. The scene presents a stable view, with the placement of machines and materials remaining largely as they were.
    4:00 PM PT

    The scene presents a stable view, with the placement of machines and materials remaining largely as they were.

  12. 4 similar no-change frames3:00 PM–3:45 PM PT

    No visible change was reported between sampled frames; continuous inactivity cannot be inferred.

    1. Construction camera frame at 3:45 PM PT. The arrangement of machinery on site is consistent between these views, with no noticeable alterations in position.
      3:45 PM PT

      The arrangement of machinery on site is consistent between these views, with no noticeable alterations in position.

    2. Construction camera frame at 3:30 PM PT. The scene is largely unchanged, though the position of one of the machines near the center of the site appears slightly different.
      3:30 PM PT

      The scene is largely unchanged, though the position of one of the machines near the center of the site appears slightly different.

    3. Construction camera frame at 3:15 PM PT. The site remains quiet, with no discernible movement of equipment or vehicles in the last fifteen minutes.
      3:15 PM PT

      The site remains quiet, with no discernible movement of equipment or vehicles in the last fifteen minutes.

    4. Construction camera frame at 3:00 PM PT. The scene is holding steady, with no apparent shifts in the location of machines or materials.
      3:00 PM PT

      The scene is holding steady, with no apparent shifts in the location of machines or materials.

  13. Construction camera frame at 2:45 PM PT. The site shows minimal activity, with the positioning of equipment and materials appearing much as it did previously.
    2:45 PM PT

    The site shows minimal activity, with the positioning of equipment and materials appearing much as it did previously.

  14. Construction camera frame at 2:30 PM PT. A small, white vehicle has entered the site via the driveway on the left side of the frame. Otherwise, the arrangement of equipment and materials remains consistent.
    2:30 PM PT

    A small, white vehicle has entered the site via the driveway on the left side of the frame. Otherwise, the arrangement of equipment and materials remains consistent.

  15. Construction camera frame at 2:15 PM PT. The equipment arrangement appears static, though a small orange marker cone is now visible near the center of the site.
    2:15 PM PT

    The equipment arrangement appears static, though a small orange marker cone is now visible near the center of the site.

  16. Construction camera frame at 2:00 PM PT. The layout of machinery across the site remains largely the same, though a dark-colored vehicle is now visible along the service road on the right.
    2:00 PM PT

    The layout of machinery across the site remains largely the same, though a dark-colored vehicle is now visible along the service road on the right.

  17. 2 similar no-change frames1:30 PM–1:45 PM PT

    No visible change was reported between sampled frames; continuous inactivity cannot be inferred.

    1. Construction camera frame at 1:45 PM PT. The scene presents a consistent view, with no noticeable alterations to the placement of equipment or materials.
      1:45 PM PT

      The scene presents a consistent view, with no noticeable alterations to the placement of equipment or materials.

    2. Construction camera frame at 1:30 PM PT. The site appears quiet, and equipment positions are unchanged from the last view.
      1:30 PM PT

      The site appears quiet, and equipment positions are unchanged from the last view.

  18. Construction camera frame at 1:15 PM PT. The scene is stable, with the machines and materials maintaining their positions from fifteen minutes ago.
    1:15 PM PT

    The scene is stable, with the machines and materials maintaining their positions from fifteen minutes ago.

  19. Construction camera frame at 1:00 PM PT. The site looks much as it did before, with no discernible shifts in equipment positions.
    1:00 PM PT

    The site looks much as it did before, with no discernible shifts in equipment positions.

  20. Construction camera frame at 12:45 PM PT. The arrangement of equipment on the site remains consistent, though a small piece of machinery has appeared near the right edge of the frame.
    12:45 PM PT

    The arrangement of equipment on the site remains consistent, though a small piece of machinery has appeared near the right edge of the frame.

  21. Construction camera frame at 12:30 PM PT. A red truck has entered the site via the driveway on the left and is positioned near a group of other machines.
    12:30 PM PT

    A red truck has entered the site via the driveway on the left and is positioned near a group of other machines.

  22. Construction camera frame at 12:15 PM PT. The overall scene remains largely the same, though a small loader has moved from the right side to the center of the site.
    12:15 PM PT

    The overall scene remains largely the same, though a small loader has moved from the right side to the center of the site.

  23. Construction camera frame at 12:00 PM PT. An excavator near the center of the site has shifted its position slightly, rotating to face a different direction.
    12:00 PM PT

    An excavator near the center of the site has shifted its position slightly, rotating to face a different direction.

  24. 6 similar no-change frames10:30 AM–11:45 AM PT

    No visible change was reported between sampled frames; continuous inactivity cannot be inferred.

    1. Construction camera frame at 11:45 AM PT. The site appears quiet, with no visible alterations to the arrangement of machines or materials in the last fifteen minutes.
      11:45 AM PT

      The site appears quiet, with no visible alterations to the arrangement of machines or materials in the last fifteen minutes.

    2. Construction camera frame at 11:30 AM PT. The scene is holding steady, with no apparent movement of equipment or vehicles during the last fifteen minutes.
      11:30 AM PT

      The scene is holding steady, with no apparent movement of equipment or vehicles during the last fifteen minutes.

    3. Construction camera frame at 11:15 AM PT. The layout of equipment on the site appears unchanged from fifteen minutes ago.
      11:15 AM PT

      The layout of equipment on the site appears unchanged from fifteen minutes ago.

    4. Construction camera frame at 11:00 AM PT. The view across the site remains remarkably stable, showing no discernible changes in the last quarter of an hour.
      11:00 AM PT

      The view across the site remains remarkably stable, showing no discernible changes in the last quarter of an hour.

    5. Construction camera frame at 10:45 AM PT. The site presents a consistent view, with no noticeable shifts in equipment or material positions.
      10:45 AM PT

      The site presents a consistent view, with no noticeable shifts in equipment or material positions.

    6. Construction camera frame at 10:30 AM PT. The scene remains largely static, with the positioning of equipment and materials appearing consistent between the two views.
      10:30 AM PT

      The scene remains largely static, with the positioning of equipment and materials appearing consistent between the two views.

  25. Construction camera frame at 10:15 AM PT. A red truck has entered the site via the driveway on the left and is now positioned in the lower-left area of the block.
    10:15 AM PT

    A red truck has entered the site via the driveway on the left and is now positioned in the lower-left area of the block.

  26. 3 similar no-change frames9:30 AM–10:00 AM PT

    No visible change was reported between sampled frames; continuous inactivity cannot be inferred.

    1. Construction camera frame at 10:00 AM PT. Everything remains in place, with no observable activity or vehicle movement across the block.
      10:00 AM PT

      Everything remains in place, with no observable activity or vehicle movement across the block.

    2. Construction camera frame at 9:45 AM PT. The site shows no visible alterations in equipment placement or activity over the past fifteen minutes.
      9:45 AM PT

      The site shows no visible alterations in equipment placement or activity over the past fifteen minutes.

    3. Construction camera frame at 9:30 AM PT. The arrangement of machines and materials across the site appears unchanged in the last fifteen minutes.
      9:30 AM PT

      The arrangement of machines and materials across the site appears unchanged in the last fifteen minutes.

  27. Construction camera frame at 9:15 AM PT. Equipment appears to be in the same locations as before, maintaining the current arrangement across the site.
    9:15 AM PT

    Equipment appears to be in the same locations as before, maintaining the current arrangement across the site.

  28. Construction camera frame at 9:00 AM PT. The site’s layout remains consistent, with equipment holding its positions and no vehicles entering or leaving.
    9:00 AM PT

    The site’s layout remains consistent, with equipment holding its positions and no vehicles entering or leaving.

  29. 6 similar no-change frames7:30 AM–8:45 AM PT

    No visible change was reported between sampled frames; continuous inactivity cannot be inferred.

    1. Construction camera frame at 8:45 AM PT. The view across the site is consistent, showing no new movement of machinery or vehicles during the last quarter hour.
      8:45 AM PT

      The view across the site is consistent, showing no new movement of machinery or vehicles during the last quarter hour.

    2. Construction camera frame at 8:30 AM PT. The site continues to present a static view, with all equipment remaining in the same positions as before.
      8:30 AM PT

      The site continues to present a static view, with all equipment remaining in the same positions as before.

    3. Construction camera frame at 8:15 AM PT. The scene remains remarkably similar, with no discernible changes to equipment positions or vehicle activity over the last fifteen minutes.
      8:15 AM PT

      The scene remains remarkably similar, with no discernible changes to equipment positions or vehicle activity over the last fifteen minutes.

    4. Construction camera frame at 8:00 AM PT. The site shows a consistent picture, with no apparent movement of equipment or vehicles in the last fifteen minutes.
      8:00 AM PT

      The site shows a consistent picture, with no apparent movement of equipment or vehicles in the last fifteen minutes.

    5. Construction camera frame at 7:45 AM PT. The site’s appearance is unchanged, with the same arrangement of equipment visible across the graded area.
      7:45 AM PT

      The site’s appearance is unchanged, with the same arrangement of equipment visible across the graded area.

    6. Construction camera frame at 7:30 AM PT. The site is holding steady, with no observable shifts in the placement of equipment or any incoming or outgoing traffic.
      7:30 AM PT

      The site is holding steady, with no observable shifts in the placement of equipment or any incoming or outgoing traffic.

  30. Construction camera frame at 7:15 AM PT. Everything remains in place across the site, with no new vehicle or machinery movement detected.
    7:15 AM PT

    Everything remains in place across the site, with no new vehicle or machinery movement detected.

  31. 11 similar no-change frames12:00 AM–7:00 AM PT

    No visible change was reported between sampled frames; continuous inactivity cannot be inferred.

    1. Construction camera frame at 7:00 AM PT. No significant alterations are apparent in the site’s layout or the positioning of machinery during the last quarter hour.
      7:00 AM PT

      No significant alterations are apparent in the site’s layout or the positioning of machinery during the last quarter hour.

    2. Construction camera frame at 6:45 AM PT. The site presents a static view, with all equipment appearing to remain in the same locations as fifteen minutes ago.
      6:45 AM PT

      The site presents a static view, with all equipment appearing to remain in the same locations as fifteen minutes ago.

    3. Construction camera frame at 6:30 AM PT. The scene is remarkably stable, with no discernible changes in equipment positions or vehicle traffic over the last fifteen minutes.
      6:30 AM PT

      The scene is remarkably stable, with no discernible changes in equipment positions or vehicle traffic over the last fifteen minutes.

    4. Construction camera frame at 6:15 AM PT. The arrangement of equipment on site appears slightly different, with a possible shift in position for some of the machines clustered in the middle of the block. Otherwise, the view remains largely consistent, with the graded area and surrounding buildings unchanged.
      6:15 AM PT

      The arrangement of equipment on site appears slightly different, with a possible shift in position for some of the machines clustered in the middle of the block. Otherwise, the view remains largely consistent, with the graded area and surrounding buildings unchanged.

    5. Construction camera frame at 6:00 AM PT. No construction activity — the site is quiet.
      6:00 AM PT

      No construction activity — the site is quiet.

    6. Construction camera frame at 5:00 AM PT. No construction activity — the site is quiet.
      5:00 AM PT

      No construction activity — the site is quiet.

    7. Construction camera frame at 4:00 AM PT. No construction activity — the site is quiet.
      4:00 AM PT

      No construction activity — the site is quiet.

    8. Construction camera frame at 3:00 AM PT. No construction activity — the site is quiet.
      3:00 AM PT

      No construction activity — the site is quiet.

    9. Construction camera frame at 2:00 AM PT. No construction activity — the site is quiet.
      2:00 AM PT

      No construction activity — the site is quiet.

    10. Construction camera frame at 1:00 AM PT. No construction activity — the site is quiet.
      1:00 AM PT

      No construction activity — the site is quiet.

    11. Construction camera frame at 12:00 AM PT. No construction activity — the site is quiet.
      12:00 AM PT

      No construction activity — the site is quiet.

← Aug 25All daysAug 27 →