Skip to content
606Onni 606 · Bellevue
  • Live
  • Progress
  • Project
  • History
  • Search
606

606 (& 620) 106th Ave NE, Bellevue, WA

An independent guide to the Onni 606 development.

For the wider city, visit bellevue.wiki ↗

Project

  • Overview
  • Live cam
  • Latest progress
  • Construction log
  • News
  • Permit ledger
  • Construction impacts
  • The Towers
  • Skyline & height
  • Timeline
  • Gallery

Context

  • History of the block
  • Location
  • Developer

Help

  • Search the site
  • FAQ
  • Glossary
  • Sources & press
  • Contact
  • Updates feed
  • Sitemap

This is an independent, informational fan site. It is not affiliated with, sponsored by, or endorsed by Onni Group. Figures are compiled from public reporting and are approximate and subject to change. Project names and trademarks belong to their respective owners.

© 2026 onni606.com — built by an enthusiast.

  1. Home
  2. /Construction log
  3. /Thursday, August 27, 2026

Construction log

Thursday, August 27, 2026

67 snapshots from the live camera.


AI digest

The site remained largely quiet, with the heavy equipment clustered along the far side and the graded area showing no clear change from the week-earlier frame. Small vehicles moved around the site during the day, and a dark truck was visible near the center by the final frame.

▶ Play this day as a timelapse
  1. Construction camera frame at 11:00 PM PT. No construction activity — the site is quiet.
    11:00 PM PT

    No construction activity — the site is quiet.

  2. 2 similar no-change frames9:00 PM–10:00 PM PT

    No visible change was reported between sampled frames; continuous inactivity cannot be inferred.

    1. Construction camera frame at 10:00 PM PT. No construction activity — the site is quiet.
      10:00 PM PT

      No construction activity — the site is quiet.

    2. Construction camera frame at 9:00 PM PT. No construction activity — the site is quiet.
      9:00 PM PT

      No construction activity — the site is quiet.

  3. Construction camera frame at 8:15 PM PT. The arrangement of equipment across the site remains consistent between views.
    8:15 PM PT

    The arrangement of equipment across the site remains consistent between views.

  4. 3 similar no-change frames7:30 PM–8:00 PM PT

    No visible change was reported between sampled frames; continuous inactivity cannot be inferred.

    1. Construction camera frame at 8:00 PM PT. The scene remains remarkably consistent, with no apparent alterations in the placement of equipment or materials.
      8:00 PM PT

      The scene remains remarkably consistent, with no apparent alterations in the placement of equipment or materials.

    2. Construction camera frame at 7:45 PM PT. The site appears quiet, with no discernible shifts in equipment placement over the last fifteen minutes.
      7:45 PM PT

      The site appears quiet, with no discernible shifts in equipment placement over the last fifteen minutes.

    3. Construction camera frame at 7:30 PM PT. The site presents a largely unchanged appearance, with all visible equipment remaining in the same positions as before.
      7:30 PM PT

      The site presents a largely unchanged appearance, with all visible equipment remaining in the same positions as before.

  5. Construction camera frame at 7:15 PM PT. The overall scene holds steady, with the arrangement of machinery and materials appearing identical to the previous view.
    7:15 PM PT

    The overall scene holds steady, with the arrangement of machinery and materials appearing identical to the previous view.

  6. 3 similar no-change frames6:30 PM–7:00 PM PT

    No visible change was reported between sampled frames; continuous inactivity cannot be inferred.

    1. Construction camera frame at 7:00 PM PT. No significant changes are visible across the site in the last fifteen minutes.
      7:00 PM PT

      No significant changes are visible across the site in the last fifteen minutes.

    2. Construction camera frame at 6:45 PM PT. The site’s layout appears stable, showing no movement of equipment or vehicles in the last quarter of an hour.
      6:45 PM PT

      The site’s layout appears stable, showing no movement of equipment or vehicles in the last quarter of an hour.

    3. Construction camera frame at 6:30 PM PT. Everything visible remains in the same location, with no noticeable activity occurring on the site.
      6:30 PM PT

      Everything visible remains in the same location, with no noticeable activity occurring on the site.

  7. Construction camera frame at 6:15 PM PT. The scene remains consistent, with equipment and materials holding their positions from the previous view.
    6:15 PM PT

    The scene remains consistent, with equipment and materials holding their positions from the previous view.

  8. 2 similar no-change frames5:45 PM–6:00 PM PT

    No visible change was reported between sampled frames; continuous inactivity cannot be inferred.

    1. Construction camera frame at 6:00 PM PT. The site remains quiet, with no apparent shifts in the location of machinery or materials since the last view.
      6:00 PM PT

      The site remains quiet, with no apparent shifts in the location of machinery or materials since the last view.

    2. Construction camera frame at 5:45 PM PT. The site's appearance is unchanged, with all visible equipment remaining in the same positions as before.
      5:45 PM PT

      The site's appearance is unchanged, with all visible equipment remaining in the same positions as before.

  9. Construction camera frame at 5:30 PM PT. The site looks much the same as it did moments ago, with no obvious movement of equipment or vehicles.
    5:30 PM PT

    The site looks much the same as it did moments ago, with no obvious movement of equipment or vehicles.

  10. 2 similar no-change frames5:00 PM–5:15 PM PT

    No visible change was reported between sampled frames; continuous inactivity cannot be inferred.

    1. Construction camera frame at 5:15 PM PT. The scene presents a consistent view, with no discernible alterations to equipment placement or the overall landscape.
      5:15 PM PT

      The scene presents a consistent view, with no discernible alterations to equipment placement or the overall landscape.

    2. Construction camera frame at 5:00 PM PT. The scene appears largely static, showing no repositioning of the equipment visible in the prior view.
      5:00 PM PT

      The scene appears largely static, showing no repositioning of the equipment visible in the prior view.

  11. Construction camera frame at 4:45 PM PT. The overall scene is remarkably still, with no noticeable repositioning of the equipment or materials within the site boundaries.
    4:45 PM PT

    The overall scene is remarkably still, with no noticeable repositioning of the equipment or materials within the site boundaries.

  12. Construction camera frame at 4:30 PM PT. Activity on the site appears minimal, with the arrangement of equipment and materials holding consistent between these views.
    4:30 PM PT

    Activity on the site appears minimal, with the arrangement of equipment and materials holding consistent between these views.

  13. Construction camera frame at 4:15 PM PT. The scene remains quite stable, with no apparent shifts in the positions of equipment or materials across the site.
    4:15 PM PT

    The scene remains quite stable, with no apparent shifts in the positions of equipment or materials across the site.

  14. Construction camera frame at 4:00 PM PT. A red vehicle has moved from the left side of the frame to the center of the site, near the lower edge of the graded area. Otherwise, the arrangement of the larger machines and the overall scene remain as they were.
    4:00 PM PT

    A red vehicle has moved from the left side of the frame to the center of the site, near the lower edge of the graded area. Otherwise, the arrangement of the larger machines and the overall scene remain as they were.

  15. 2 similar no-change frames3:30 PM–3:45 PM PT

    No visible change was reported between sampled frames; continuous inactivity cannot be inferred.

    1. Construction camera frame at 3:45 PM PT. The equipment layout is largely unchanged, though a small, reddish object is now visible near the driveway on the left side of the frame.
      3:45 PM PT

      The equipment layout is largely unchanged, though a small, reddish object is now visible near the driveway on the left side of the frame.

    2. Construction camera frame at 3:30 PM PT. The site presents a similar view as before, with no discernible movement of the parked machinery or materials.
      3:30 PM PT

      The site presents a similar view as before, with no discernible movement of the parked machinery or materials.

  16. Construction camera frame at 3:15 PM PT. A small, dark vehicle has appeared near the center of the site, having not been visible in the previous view. Otherwise, the arrangement of the larger machines and materials stays the same.
    3:15 PM PT

    A small, dark vehicle has appeared near the center of the site, having not been visible in the previous view. Otherwise, the arrangement of the larger machines and materials stays the same.

  17. Construction camera frame at 3:00 PM PT. The scene is holding steady, with the equipment and materials appearing in the same arrangement as before.
    3:00 PM PT

    The scene is holding steady, with the equipment and materials appearing in the same arrangement as before.

  18. Construction camera frame at 2:45 PM PT. The arrangement of the heavy equipment remains consistent, though a small, dark object appears to have shifted position in the lower center of the site.
    2:45 PM PT

    The arrangement of the heavy equipment remains consistent, though a small, dark object appears to have shifted position in the lower center of the site.

  19. Construction camera frame at 2:30 PM PT. The overall scene appears consistent, with the machines and materials holding their positions from the previous view.
    2:30 PM PT

    The overall scene appears consistent, with the machines and materials holding their positions from the previous view.

  20. Construction camera frame at 2:15 PM PT. A small red vehicle has moved into the central area of the site since the last view. Otherwise, the equipment and materials appear to be in the same positions.
    2:15 PM PT

    A small red vehicle has moved into the central area of the site since the last view. Otherwise, the equipment and materials appear to be in the same positions.

  21. Construction camera frame at 2:00 PM PT. The scene remains largely as it was, with no readily apparent shifts in the positions of machines or materials.
    2:00 PM PT

    The scene remains largely as it was, with no readily apparent shifts in the positions of machines or materials.

  22. 4 similar no-change frames1:00 PM–1:45 PM PT

    No visible change was reported between sampled frames; continuous inactivity cannot be inferred.

    1. Construction camera frame at 1:45 PM PT. The site’s layout remains stable, with no noticeable alterations to the positioning of equipment or materials.
      1:45 PM PT

      The site’s layout remains stable, with no noticeable alterations to the positioning of equipment or materials.

    2. Construction camera frame at 1:30 PM PT. The site continues to show a consistent arrangement of machinery, with no discernible shifts in position over the past fifteen minutes.
      1:30 PM PT

      The site continues to show a consistent arrangement of machinery, with no discernible shifts in position over the past fifteen minutes.

    3. Construction camera frame at 1:15 PM PT. The scene presents a static view, with the arrangement of machinery remaining unchanged in the last fifteen minutes.
      1:15 PM PT

      The scene presents a static view, with the arrangement of machinery remaining unchanged in the last fifteen minutes.

    4. Construction camera frame at 1:00 PM PT. The site’s machinery and materials maintain their positions, showing little to no change in the last fifteen minutes.
      1:00 PM PT

      The site’s machinery and materials maintain their positions, showing little to no change in the last fifteen minutes.

  23. Construction camera frame at 12:45 PM PT. The arrangement of equipment on site remains consistent, with no clear movement detected in the latest view.
    12:45 PM PT

    The arrangement of equipment on site remains consistent, with no clear movement detected in the latest view.

  24. Construction camera frame at 12:30 PM PT. The scene appears quiet, with no apparent movement of equipment or vehicles in the last fifteen minutes.
    12:30 PM PT

    The scene appears quiet, with no apparent movement of equipment or vehicles in the last fifteen minutes.

  25. Construction camera frame at 12:15 PM PT. Equipment appears to be holding its positions, and the overall scene looks largely as it did moments ago.
    12:15 PM PT

    Equipment appears to be holding its positions, and the overall scene looks largely as it did moments ago.

  26. 2 similar no-change frames11:45 AM–12:00 PM PT

    No visible change was reported between sampled frames; continuous inactivity cannot be inferred.

    1. Construction camera frame at 12:00 PM PT. The scene remains stable, with no observable alterations in equipment placement or site activity over the last fifteen minutes.
      12:00 PM PT

      The scene remains stable, with no observable alterations in equipment placement or site activity over the last fifteen minutes.

    2. Construction camera frame at 11:45 AM PT. The site’s layout of machinery and materials shows no discernible shifts over the last quarter hour.
      11:45 AM PT

      The site’s layout of machinery and materials shows no discernible shifts over the last quarter hour.

  27. Construction camera frame at 11:30 AM PT. The scene presents a largely consistent view, with equipment maintaining its positions across the site.
    11:30 AM PT

    The scene presents a largely consistent view, with equipment maintaining its positions across the site.

  28. Construction camera frame at 11:15 AM PT. A white pickup truck has entered the site from the driveway on the left and is now parked near the red portable office. The rest of the scene appears unchanged from fifteen minutes ago.
    11:15 AM PT

    A white pickup truck has entered the site from the driveway on the left and is now parked near the red portable office. The rest of the scene appears unchanged from fifteen minutes ago.

  29. Construction camera frame at 11:00 AM PT. The dark truck previously near the yellow equipment has shifted slightly further into the center of the site. Otherwise, the scene remains remarkably similar.
    11:00 AM PT

    The dark truck previously near the yellow equipment has shifted slightly further into the center of the site. Otherwise, the scene remains remarkably similar.

  30. Construction camera frame at 10:45 AM PT. The arrangement of vehicles and equipment on site remains nearly identical to the view from fifteen minutes ago.
    10:45 AM PT

    The arrangement of vehicles and equipment on site remains nearly identical to the view from fifteen minutes ago.

  31. Construction camera frame at 10:30 AM PT. The site’s arrangement of equipment and vehicles appears static, showing no movement in the last fifteen minutes.
    10:30 AM PT

    The site’s arrangement of equipment and vehicles appears static, showing no movement in the last fifteen minutes.

  32. Construction camera frame at 10:15 AM PT. A dark-colored truck has moved into the center of the site from the access road on the right, parking near some of the yellow equipment. Otherwise, the scene remains consistent.
    10:15 AM PT

    A dark-colored truck has moved into the center of the site from the access road on the right, parking near some of the yellow equipment. Otherwise, the scene remains consistent.

  33. Construction camera frame at 10:00 AM PT. Equipment across the site holds its positions, with no noticeable adjustments in the last quarter hour.
    10:00 AM PT

    Equipment across the site holds its positions, with no noticeable adjustments in the last quarter hour.

  34. Construction camera frame at 9:45 AM PT. The site presents a similar view as before, with no obvious repositioning of equipment or vehicles.
    9:45 AM PT

    The site presents a similar view as before, with no obvious repositioning of equipment or vehicles.

  35. Construction camera frame at 9:30 AM PT. The scene appears largely unchanged, with equipment maintaining its positions across the graded area.
    9:30 AM PT

    The scene appears largely unchanged, with equipment maintaining its positions across the graded area.

  36. Construction camera frame at 9:15 AM PT. A small white vehicle has moved from the lower center of the site toward the right edge, near a cluster of yellow machinery. The rest of the scene maintains the same appearance as before.
    9:15 AM PT

    A small white vehicle has moved from the lower center of the site toward the right edge, near a cluster of yellow machinery. The rest of the scene maintains the same appearance as before.

  37. Construction camera frame at 9:00 AM PT. The scene remains stable, with no discernible changes in equipment placement or activity across the site.
    9:00 AM PT

    The scene remains stable, with no discernible changes in equipment placement or activity across the site.

  38. Construction camera frame at 8:45 AM PT. A white van has entered the site from the driveway on the left and is now positioned near the equipment in the lower center. The rest of the scene remains consistent with the prior view.
    8:45 AM PT

    A white van has entered the site from the driveway on the left and is now positioned near the equipment in the lower center. The rest of the scene remains consistent with the prior view.

  39. 2 similar no-change frames8:15 AM–8:30 AM PT

    No visible change was reported between sampled frames; continuous inactivity cannot be inferred.

    1. Construction camera frame at 8:30 AM PT. The arrangement of machinery on site is holding, with no visible shifts in position over the last fifteen minutes.
      8:30 AM PT

      The arrangement of machinery on site is holding, with no visible shifts in position over the last fifteen minutes.

    2. Construction camera frame at 8:15 AM PT. The equipment across the site holds its positions, with no apparent movement detected in the last fifteen minutes.
      8:15 AM PT

      The equipment across the site holds its positions, with no apparent movement detected in the last fifteen minutes.

  40. Construction camera frame at 8:00 AM PT. A dark-colored truck has moved from the service road on the right to a position near the center of the site. Otherwise, the equipment and layout across the graded area appear to be holding steady.
    8:00 AM PT

    A dark-colored truck has moved from the service road on the right to a position near the center of the site. Otherwise, the equipment and layout across the graded area appear to be holding steady.

  41. Construction camera frame at 7:45 AM PT. The site appears remarkably unchanged, with the same arrangement of equipment visible across the graded area.
    7:45 AM PT

    The site appears remarkably unchanged, with the same arrangement of equipment visible across the graded area.

  42. Construction camera frame at 7:30 AM PT. Several figures are now visible working near a white pickup truck in the lower center of the site. The overall arrangement of heavy equipment across the graded area remains largely the same.
    7:30 AM PT

    Several figures are now visible working near a white pickup truck in the lower center of the site. The overall arrangement of heavy equipment across the graded area remains largely the same.

  43. 4 similar no-change frames6:30 AM–7:15 AM PT

    No visible change was reported between sampled frames; continuous inactivity cannot be inferred.

    1. Construction camera frame at 7:15 AM PT. The equipment layout across the site remains consistent, showing no discernible movement in the last quarter hour.
      7:15 AM PT

      The equipment layout across the site remains consistent, showing no discernible movement in the last quarter hour.

    2. Construction camera frame at 7:00 AM PT. The scene is largely static, with the equipment remaining in the same positions as fifteen minutes ago.
      7:00 AM PT

      The scene is largely static, with the equipment remaining in the same positions as fifteen minutes ago.

    3. Construction camera frame at 6:45 AM PT. The arrangement of machinery on the graded site appears stable, with no visible shifts in position over the last fifteen minutes.
      6:45 AM PT

      The arrangement of machinery on the graded site appears stable, with no visible shifts in position over the last fifteen minutes.

    4. Construction camera frame at 6:30 AM PT. A small white vehicle has entered the site via the driveway on the left. Otherwise, the arrangement of equipment across the graded area appears unchanged.
      6:30 AM PT

      A small white vehicle has entered the site via the driveway on the left. Otherwise, the arrangement of equipment across the graded area appears unchanged.

  44. Construction camera frame at 6:15 AM PT. More equipment is now visible within the site, clustered towards the center. The scene remains quiet with low visibility, though some lights illuminate the graded area.
    6:15 AM PT

    More equipment is now visible within the site, clustered towards the center. The scene remains quiet with low visibility, though some lights illuminate the graded area.

  45. 7 similar no-change frames12:00 AM–6:00 AM PT

    No visible change was reported between sampled frames; continuous inactivity cannot be inferred.

    1. Construction camera frame at 6:00 AM PT. No construction activity — the site is quiet.
      6:00 AM PT

      No construction activity — the site is quiet.

    2. Construction camera frame at 5:00 AM PT. No construction activity — the site is quiet.
      5:00 AM PT

      No construction activity — the site is quiet.

    3. Construction camera frame at 4:00 AM PT. No construction activity — the site is quiet.
      4:00 AM PT

      No construction activity — the site is quiet.

    4. Construction camera frame at 3:00 AM PT. No construction activity — the site is quiet.
      3:00 AM PT

      No construction activity — the site is quiet.

    5. Construction camera frame at 2:00 AM PT. No construction activity — the site is quiet.
      2:00 AM PT

      No construction activity — the site is quiet.

    6. Construction camera frame at 1:00 AM PT. No construction activity — the site is quiet.
      1:00 AM PT

      No construction activity — the site is quiet.

    7. Construction camera frame at 12:00 AM PT. No construction activity — the site is quiet.
      12:00 AM PT

      No construction activity — the site is quiet.

← Aug 26All daysAug 28 →